SHARED
Calculations and Decision Rules
Companion to the Software Requirements Specification
Version 1.6
Published methods and pending decisions through Institution review
This appendix states how the prototype calculates results and how the proposed system should handle the related decisions. Read it with the main SRS. Each method shows its source, required inputs, calculation or steps, example, limits and approval needs. A correct sample calculation is not evidence of local scientific acceptance.
The main SRS, appendix and controlled registers form one Version 1.6 review package. The 57 family IDs, 820 candidate decisions and 139 method IDs are retained. Repeated examples use one family definition. Use the registers for exact inputs, units, source links, scope and pending approval.
1 Using this appendix
2 Shared calculations and business rules
3 Calculation families
4 Retained method references
5 Sources
6 Approval and acceptance
1 Using this appendix
The Word, PDF and web editions describe the same method content. The following registers are controlled parts of Version 1.6 and must travel with the appendix. The main coverage workbook remains the design coverage record.
Decision_Register.csv All 820 decision examples, exact configured inputs and limits, units, source roles, owners and pending approval. Open online
Method_References.csv All 139 existing reference definitions, formulas or procedures, inputs, limits and original source links. These are candidate methods, not a claim of equivalence to an implemented family. Open online
Calculation_Sources.csv The full source register, with title, URL, locator, source role and access status. Open online
Government publication and Institution publication identify direct support for the stated core method. Record the publisher, edition and exact page or section. Validation required identifies project rules, adaptations or incomplete support. A data or background source alone does not support a formula. Published methods need no repeat proof; confirm local settings and intended use. Developers test copying, arithmetic and input handling. Section 6 separates these checks from client and expert decisions.
Source IDs LOCAL SRS in the registers retain their original legacy chapter labels. They refer to the earlier separate chapter set, not to the current 14 chapter numbering. The PROTO source identifies the prototype function and decision ID; SRS identifies this main SRS. No source citation grants legal, financial or scientific authority.
Inputs and limits
Use the same population, entity, boundary, period, definition, unit and source edition for a comparison. Keep the numerator and denominator visible. Preserve original values, missing reasons, uncertainty and access rights. No data is different from a measured zero. Do not infer a complete population from a partial snapshot or sum incompatible quantities.
All family inputs are required unless an approved method explicitly permits absence. The Decision Register records each current numeric input bound and whole number constraint. These are prototype guards, not scientifically recommended ranges. Generic units in a sample must be replaced by the exact approved institutional definition. Keep calculation precision; round only for display under an agreed rule. No default weights, rates, risk categories, warning levels or legal limits become official through this appendix.
Examples use invented values to check arithmetic. They are not institutional observations or recommendations. The wider proposed procedure in each family may need more data and specialist processing than the displayed example. Where the prototype only plots inputs or completeness, that limitation is stated explicitly.
Read a family in this order: question; exact formula; inputs and units; worked example; effect of an input change; wider proposed procedure; limits; source category. The example explains the prototype rule. It does not demonstrate every part of the wider procedure.
2 Shared calculations and business rules
Counts and source coverage
Count records only within the selected source and filters. Distinct count uses the reviewed identity key. Coverage reports supplied observations and requested rows separately. A snapshot total is not the population total.
Example One person with two memberships and three support episodes counts as one person, two memberships and three episodes.
Category Validation required. Source PublicDashboardModel.metric/uniqueRows; SrsDemonstration.coverage; ReportModel.execute. Requirements FR076 FR077 FR097. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Weighted means and pooled rates
Weighted mean = sum of weight × value divided by sum of valid weights. For a pooled rate, sum compatible numerators and denominators, then divide. Missing weights or a zero total denominator withhold the result.
Example Values 10 and 20 with weights 1 and 3 give 17.5. Rates 1/2 and 9/10 pool to 10/12, or 83.3333 percent.
Category Institution publication. Publisher United Nations Statistics Division (Final Draft). Source DecisionSupportModel.project SURVEY; SRS 5.4. Requirements FR099 FR103. Sources PROTO, SRS, S91.
Review Published core needs no repeat proof. Confirm local inputs, units and settings under E01; E02/E03 where relevant. See Section 6.
Basic crop yield
Production in tonnes divided by matching positive harvested hectares gives t/ha. Do not mix cultivated, sown and harvested area. Reject negative production or zero area.
Example 400 t / 100 ha = 4 t/ha.
Category Validation required. Source SrsCalculations.yield; YIELD input contract. Requirements FR082 FR103. Sources PROTO, SRS, S67.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Break even and margin ratios
For the stated variable cost scope, break even price = variable cost / positive saleable output. Margin ratio = 100 × gross margin / positive revenue. A break even yield uses cost per hectare divided by the applicable positive net price. State which fixed costs are excluded.
Example Variable cost LKR 70000 and 1000 kg give LKR 70/kg. LKR 30000 gross margin on LKR 100000 revenue gives 30 percent.
Category Validation required. Source SRS 5.4; MARGIN; NF022; proposed algebra from the stated gross margin identity. Requirements FR082 FR103. Sources SRS, S76. Published components: Institution publication - Food and Agriculture Organization of the United Nations (FAO) (S76).
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Percentage variance and target progress
Percentage variance = 100 × (actual − plan) / plan for a nonzero plan. Progress from a baseline = 100 × (actual − baseline) / (target − baseline) for unequal target and baseline. Target achievement = 100 × actual / target for a nonzero target. These are different measures. Keep underachievement and values over 100 percent visible unless an approved display rule says otherwise.
Example Actual 120 and plan 100 give +20 and +20 percent. Baseline 20, actual 60 and target 100 give 50 percent progress and 60 percent target achievement.
Category Validation required. Source SrsCalculations.variance; SRS 5.4; NF171. Requirements FR103 FR124. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Reviewed weighted criteria
Normalize each criterion as (value − worst) / (best − worst). Score = 100 × sum of weight × normalized value. Weights must be finite, nonnegative and total one within 0.000000001. Anchors must differ; every required input must lie between its anchors. Exclude infeasible options first. The prototype rounds the score to four decimals before ranking. Rank = one plus the number of strictly higher displayed scores; ties have equal rank.
Example A benefit criterion with worst 0, best 100 and value 80 scores 80. A cost criterion with worst 100, best 0 and value 20 also scores 80. Equal options both rank 1.
Category Validation required. Source SrsCalculations.weighted; SrsDemonstration.compareDecision. Requirements FR102 FR105. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Annual cash flows and payback
For years 0 to n, discounted flow = signed cash flow / (1 + rate fraction) raised to the year. NPV is the sum. The prototype accepts 2 to 51 annual flows and rate above −1 through 1. Its paybackYear is the first year greater than zero with nonnegative cumulative undiscounted cash flow. It is not discounted payback or fractional payback. Do not use it for an unusual flow pattern without a reviewed rule.
Example Flows −100, 60, 60 at 10 percent give NPV 4.1322 and undiscounted payback year 2.
Category Validation required. Source SrsCalculations.cashFlow; FINANCE; NF145 NF147 NF157. Requirements FR103 FR105. Sources PROTO, SRS, S81. Published components: Institution publication - Food and Agriculture Organization of the United Nations (FAO) (S81).
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Cost per additional observed outcome
Observed change = actual − baseline. Cost per additional unit = nonnegative comparable cost / observed change only when that change is positive. A decrease, no change or missing value withholds this ratio. This rule alone does not establish causation or handle a lower is better indicator.
Example Cost LKR 10000, baseline 20 and actual 60 give change 40 and LKR 250 per additional observed unit.
Category Validation required. Source SrsCalculations.costOutcome. Requirements FR103 FR125. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Rainfall missing values and comparable pairs
Calculate a supplied value mean using only explicitly supplied readings; retain the supplied count. A required complete period mean stays unavailable if any required period is missing. Paired analysis uses only compatible pairs and reports their count. A real zero is retained.
Example Example rainfall 1200, 1300, missing, 1400, 1500 mm gives supplied mean 1350 mm and coverage 4/5. With the corresponding cultivation series, paired coverage is 3/5.
Category Validation required. Source SrsCalculations.rainfall; SRS rainfall acceptance example. Requirements FR099 FR103. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Statistical summaries in retained method references
For sorted valid observations, median is the middle value or mean of the two middle values. Sample standard deviation uses sum of squared deviations divided by n − 1 before taking the square root. CV percent = 100 × sample standard deviation / positive mean, with n at least 2 and a meaningful zero. Quartiles need a named algorithm. Shannon sample diversity uses −sum of p × natural log(p), omitting zero terms. These definitions are proposed reference methods; the simple decision plots do not perform them all.
Example For 10, 20, 30, median and mean are 20, sample SD is 10 and CV is 50 percent. For two equally common species, Shannon index is ln(2), about 0.6931.
Category Validation required. Source NF077 NF086 NF109 NF114 NF115; DISTRIBUTION and VOLATILITY catalogue. Requirements FR099 FR103. Sources SRS, S84. Published components: Government publication - United States National Institute of Standards and Technology (NIST) (S84).
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Spatial measurements and intersection
The prototype uses its spatial engine on WGS84 coordinates. Area in square metres is divided by 10000 for hectares. Line length and point distance use kilometres. Intersection area is measured from the actual intersected polygons. Point containment uses the library boundary rule. These are spherical exploratory estimates. A projected authoritative analysis needs a separately approved service and CRS.
Example An intersection of 200000 square metres is 20 ha. An empty intersection is zero area. Different geographic roles cannot be substituted.
Category Validation required. Source SpatialModel.vector; GeographicWorkflow.analyse/compareHistory. Requirements SH-GEO-FEAT-008 SH-GEO-FEAT-012 FR066. Sources PROTO, SRS, S85, S86, S87, S89, S90.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Buffers proximity and spatial limits
Buffer and point proximity radius must be above zero and no more than 20 km; the buffer uses 24 steps. Viewport vector analysis requires 1 to 749 loaded features and excludes demonstration geometry. Count nearby valid points within the chosen radius and report excluded or unsupported features. These are prototype workload limits, not environmental buffer rules.
Example A point at distance 1.5 km is included by a 2 km radius; one at 2.5 km is excluded. A 0 km radius is rejected.
Category Validation required. Source SpatialModel.vector. Requirements FR066 FR074. Sources PROTO, SRS, S86, S88.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Raster pairs and change
Both rasters must retain native aligned width, height, bounding box, CRS, unit and kind. Preview supports EPSG:4326 and at most 262144 cells per grid; no resampling is performed. For each valid pair count changed cells. Continuous mean difference = sum of later minus earlier values divided by paired count. Classified grids produce transition counts. Missing pairs are excluded and counted, not set to zero. Cell counts are not automatically hectares.
Example Earlier cells 1, missing, 3 and later cells 2, 4, 3 give 2 pairs, 1 missing pair, 1 changed cell and mean difference 0.5.
Category Validation required. Source SpatialModel.rasterCheck/rasterCompare. Requirements FR067 FR074. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Reservoir ratios and capacity
Storage percentage = 100 × effective storage / positive active capacity. Capacity composition accepts positive gross capacity, nonnegative dead and effective volumes, and dead plus effective no greater than gross. Remaining volume = gross − dead − effective. Labels must match the source definitions.
Example Gross 100, dead 10 and effective 60 leave 30 in the stated source volume unit. Effective 60 / active 90 gives 66.6667 percent.
Category Validation required. Source WaterModel.ratio/capacity. Requirements FR099 FR103. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Source water level thresholds
Use the source station unit and ordered alert, minor and major thresholds. At or above major select the major band, else at or above minor the minor band, else at or above alert the alert band, else below the source alert band. Missing or unordered thresholds withhold the band. This display is not a new warning.
Example For source thresholds 2, 3 and 4 m, a 3 m reading is in the minor threshold band.
Category Validation required. Source WaterModel.status; DisasterModel.delta. Requirements FR103 FR134. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Observation age and endpoint trend
Age in minutes = max(0, as of time − observation time) / 60000. A future timestamp is still a quality issue requiring review. Endpoint trend = (last value − first value) / elapsed hours for the same station and basin with verified, identical units and a positive elapsed time. It is not regression, a forecast or a warning.
Example A 2 m to 3 m change over 2 hours gives +0.5 m/hour.
Category Validation required. Source DisasterModel.age/latest/trend; WaterModel.stationRecords. Requirements FR055 FR099 FR103. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Official warning display
Only a nonsynthetic public actual alert or update, without a superseding record, and with at least one interval containing as of time is active. The valid from boundary is inclusive and valid to is exclusive. Derived values and stale warnings must not become official alerts.
Example A warning valid from 10:00 to 12:00 is active at 10:00 and inactive at 12:00.
Category Validation required. Source DisasterModel.active/publicRows. Requirements FR134 FR135. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Dashboard aggregation and display
Apply source, period and place filters first. Sum only a declared additive measure within compatible category groups. Count rows separately from distinct identities. Melt named compatible measure columns into chart points. A scatter requires both values. Missing numbers stay absent with a missing count; incomplete snapshots stay marked partial. Funding chart separates disbursed grant from grant not yet disbursed and requires grant no less than paid.
Example Grant 100 and disbursed 60 show 60 disbursed and 40 not disbursed. Unknown amounts do not create a zero total.
Category Validation required. Source PublicDashboardModel.project/metric/chartModel; IrrigationModel.chart; ApprovedChartModel.project. Requirements FR099 FR100. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Report joins and reproducibility
Use a reviewed record, geography and period, or identity and period grain. Combine at most four sources with one to twelve chosen measures, at most 500 rows per source and 2000 result rows. Reject duplicate matching keys and unsupported aggregation before joining. Retain unmatched source rows and exact input versions. Changed plans or sources invalidate their review. Limits are prototype input guards.
Example Two source rows with the same join key are rejected before they can multiply a total. An unmatched observation stays missing.
Category Validation required. Source ReportModel.validate/execute/approve/run. Requirements FR094 FR095 FR096 FR097 FR098. Sources PROTO, SRS.
Review Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6.
Numeric and date validation
Keep zero distinct from blank. Reject booleans and nonfinite numbers as measurements. Respect each declared type, minimum, maximum, precision and scale; integer fields require safe whole numbers. Provider decimal inputs default to at most 15 significant digits and 8 fractional digits, and reject exponent notation. Validate real calendar dates. Use the exact field contract, not a displayed rounded number, for acceptance.
Example 0 is accepted as a reading. A blank, false and an impossible calendar date are rejected.
Category Validation required. Source SrsCalculations.number; ProviderWorkflows.validate; SrsDemonstration.validate; DecisionSupportModel.validate. Requirements FR038 FR058 FR103. Sources PROTO, SRS.
Review Developer tests valid, invalid and missing inputs. C04 confirms allowed values; expert review applies only to scientific limits.
Identity and competing source claims
An independent steward reviews both source identities before adding a relationship. Preserve the separate objects, source claims and histories. A preferred claim records a purpose and reason; it does not delete alternatives. Similar names do not prove identity.
Example Two reviewed records can be linked as related source identities while both original claims remain visible.
Category Validation required. Source SrsDemonstration.linkIdentity/preferClaim. Requirements FR029 FR030 FR033. Sources PROTO, SRS.
Review C02/C04 confirm identity keys, source owners and conflict resolution. Developer tests matching and preserved versions.
Document suggestions and source purpose
Match existing field labels or keys after normalizing text. Rank possible destination forms by count of matched fields, then form name. This is a name match aid, not a scientific or confidence score. Conflicting values, ambiguous numbers and incompatible units require a person to resolve them. Guidance text cannot supply a measured observation. Independent field mapping review and value review are separate.
Example A document stating two different values for rainfall creates a conflict requiring a checked choice; it does not average them.
Category Validation required. Source DocumentSlotModel.matches/rank/values; SrsDemonstration.reviewMapping/mappingKey. Requirements FR046 FR047 FR048 FR049 FR050. Sources PROTO, SRS.
Review C04/C05 confirm source rights and permitted purpose. Developer tests evidence links and restricted outputs.
Feed mapping and duplicate events
Freeze the reviewed source, destination dataset and version, field list, event/time/value keys, protocol, schema and device mapping. Preserve original raw keys and values. A changed contract invalidates mapping review. Replay uses the stable event identity to return the original receipt or reject changed content under that identity. A typed or sample payload is not a provider receipt.
Example Replay of the same event returns the same receipt; the same event key with different measured content is rejected.
Category Validation required. Source SrsDemonstration.feedContract/reviewFeedMapping/feedReplay/importAtomic. Requirements FR051 FR052 FR053 FR054 FR055 FR056. Sources PROTO, SRS.
Review C04 confirms field mapping and source contract. Developer tests duplicates, rejected rows and safe retries.
Review independence and stale evidence
Authors cannot perform protected independent reviews of their own work. Actions require the correct role, institution, state and exact record version. Revisions preserve predecessors and clear checks tied to changed evidence. A saved sample or a successful arithmetic check does not approve a scientific method.
Example A revised input version cannot reuse an approval for the earlier values.
Category Validation required. Source SrsDemonstration.role/independent/review/revise; ProviderWorkflows.review; DecisionSupportModel.adviceTransition. Requirements FR050 FR107 FR113 FR121. Sources PROTO, SRS.
Review C02 confirms reviewer roles. Developer tests separation of roles, changed versions and stale evidence.
Dependencies and project authorization
Check required people, prerequisites, finance, conditions and institutional authorization before activating work. Block cyclic dependencies and unavailable prerequisites. Track recommendation, authorized decision, performed work and verified outcome separately.
Example A task with an unfinished required prerequisite remains blocked.
Category Validation required. Source SrsDemonstration.dependency/dependenciesComplete/authorize/activate. Requirements FR105 FR110 FR111 FR112 FR114 FR115. Sources PROTO, SRS.
Review C01/C02 confirm scope, roles and approval steps. Developer tests dependencies and authorization rules.
Actual progress and outcome evidence
Only the assigned person records progress on open work. Require nonnegative quantity, unit, observation date, evidence and actual geographic support. A reviewer checks the submitted observation independently before it becomes verified progress. Outcome learning records observed results and source against the decision version.
Example Repeating identical progress evidence returns the existing entry; changed content under the same evidence identity is rejected.
Category Validation required. Source SrsDemonstration.progress/reviewProgress/outcome. Requirements FR120 FR121 FR123 FR124 FR125. Sources PROTO, SRS.
Review C10 confirms progress and outcome definitions. Developer tests evidence links and calculations.
PES verification and payment evidence
A recorded payment requires reviewed evidence, an authorized or active agreement, matching verified service evidence and a source payment reference. Client authority, rights, rates and funding are separate decisions. The prototype records evidence and transfers no money.
Example A service verification for another agreement cannot support a payment record.
Category Validation required. Source SrsDemonstration.recordPayment; PES. Requirements FR092 FR093. Sources PROTO, SRS, S60, S61.
Review E03/C10 confirm rights, service evidence, rates, funding and payment authority. Developer tests the agreed rules.
Closure handover and reopening
Freeze the closure checklist and source versions. Verify each required item independently, with current receiving evidence where needed. Close only after all checks and authority requirements pass. Changing the checklist or linked evidence invalidates its checks. Reopening or a revision keeps the prior closure and history.
Example A receiving asset changed after its review blocks closure until the new evidence is checked.
Category Validation required. Source PrototypeCompletion.closureSignature; SrsDemonstration.prepareClosure/fulfil/linkHandover/close/reopen. Requirements FR126 FR127 FR128. Sources PROTO, SRS.
Review C02/C11 confirm receiving roles and closure evidence. Developer tests the agreed workflow.
Source rights and publication
Apply scoped permissions for source, recipient, purpose, area, right, field list and validity period. A matching deny overrides an allow. Dataset provider views also require the active policy, role and institution. Public knowledge requires Published state, Public classification, unexpired rights and eligible citations recursively. Cycles, withdrawn sources and missing evidence block publication. No organization membership gives unrestricted access.
Example Expiry of a parent source removes dependent public guidance from the eligible list.
Category Validation required. Source SrsCalculations.permit; ProviderWorkflows.permitted; SrsDemonstration.sourceEligible/publishableSource. Requirements FR095 FR106 FR133 FR134. Sources PROTO, SRS.
Review C04/C05 confirm permitted use and audiences. Developer tests publication and source withdrawal.
Feedback appeal and safeguarding
Use the approved receiving institution and response policy. Retain the original feedback, evidence, response, independent appeal and final disposition. A response or attendance record is not consent. Publication checks remove restricted or sensitive content.
Example An unresolved appeal remains open with its accountable receiver.
Category Validation required. Source SrsDemonstration.submitFeedback/respondFeedback/appealFeedback/resolveAppeal; CONSENT. Requirements FR135 FR136. Sources PROTO, SRS, S47.
Review C05/C09 confirm privacy, receiving roles and appeals. Developer tests the agreed workflow.
Optional offline work background jobs and recovery
If the client selects offline operation, retain the base version and original evidence under approved protection and retention. Send stale or changed content to conflict review. Atomic receipts prevent a committed import being repeated. Queued jobs can be cancelled or retried; recover a lost response using its existing receipt. Additional channels and offline synchronisation remain proposed options under C01/C06/C07. Operational evidence is still required.
Example Retry after a lost response returns the committed receipt and does not import a second copy.
Category Validation required. Source SrsDemonstration.queueOffline/syncOffline/importAtomic/jobAction. IDs FR139 FR140 FR141 FR145 FR148 SH-GEO-FEAT-017. Sources PROTO, SRS.
Review C01/C06/C07/C08 confirm the selected options and targets. Developer tests the agreed implementation.
Acceptance and release decisions
Mock design coverage means the screen behavior is shown. It does not prove production implementation, local scientific validity, consultation, legal permission, service operations or formal acceptance. Client and experts approve this SRS and its appendix as one version through Institution review; no separate TOR review or UI reviewer gate is added.
Example An arithmetically correct erosion example still needs local factor and method approval before an operational decision.
Category Validation required. Source SRS Chapter 12 acceptance and Chapter 13 review decisions; Institution review. Requirements FR150 FR151 FR152 FR153 FR154 FR155 FR156. Sources SRS, PROTO.
Review C11 records final acceptance after the relevant C01 to C12 and E01 to E03 decisions. Developer evidence does not grant approval.
3 Calculation families
Find the family by its existing ID. Inputs below show a representative configured decision. The Decision Register supplies every decision specific input, unit and bound, including the crop water, productivity, trend and cash balance variants. Read the shared rules in Section 2 with each family. All source codes resolve in Calculation Sources and the web source register.
CHANGE Comparable change
Decision example. Prioritize bathymetric surveys and desilting appraisal.
change = current − baseline
Inputs and units. Earlier/source value (m³); Later/comparison value (m³).
Worked example. DEC-DP05-008 — Laggala Pallegama — reservoir sedimentation, 2025. Earlier/source value = 100 m³; Later/comparison value = 90 m³. Difference = -10 m³; Relative change = -10 %. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Later/comparison value minus Earlier/source value. Relative change = 100 × difference / Earlier/source value when the earlier value is positive.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. land change, change. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
OVERLAY Spatial constraint screening
Decision example. Refer proposed developments overlapping constraints.
overlap share = 100 × overlap area ÷ footprint area
Inputs and units. Proposal footprint (ha); Union of overlapping constraint areas (ha); Boundary edition; Constraint definition.
Worked example. DEC-DP01-002 — Laggala Pallegama — development screening, 2025. Proposal footprint = 75 ha; Union of overlapping constraint areas = 18 ha. Overlap share = 24 %; Overlapping area = 18 ha. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. 100 × union of constraint overlap / proposal footprint. Count intersecting constraint areas once.
Limits. Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. overlay, point overlay, well proximity. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
COVERAGE Coverage and unmet need
Decision example. Commission missing divisional land-use plans.
coverage = 100 × served eligible units ÷ eligible units
Inputs and units. Required eligible frame (divisions); Distinct members of that frame covered (divisions); Frame members with unknown coverage (divisions).
Worked example. DEC-DP01-003 — Laggala Pallegama — planning coverage, 2025. Required eligible frame = 100 divisions; Distinct members of that frame covered = 65 divisions; Frame members with unknown coverage = 5 divisions. Verified coverage = 65 %; Known uncovered = 30 divisions; Unknown coverage = 5 divisions. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. 100 × distinct covered eligible units / eligible frame. Known uncovered = frame − covered − unknown.
Limits. Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. coverage. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
MISMATCH Independent evidence reconciliation
Decision example. Investigate field and map classification disagreements.
unresolved comparisons = count(missing or conflicting equivalence)
Inputs and units. Original source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence.
Worked example. DEC-DP01-004 — Laggala Pallegama — field verification, 2025. . Unresolved equivalence items = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Compare original definitions, identifiers, units and versions against documented equivalence evidence. Preserve conflicts and unresolved mappings; do not subtract category labels or silently merge records.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. mismatch, series mismatch, numeric mismatch, lineage, location mismatch, schema mismatch, affected lots. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
EROSION Erosion model comparison
Decision example. Target detailed soil-loss assessment in planning units.
soil loss = R × K × LS × C × P
Inputs and units. Rainfall erosivity (MJ mm/(ha h year)); Soil erodibility (t ha h/(ha MJ mm)); Slope-length and steepness factor (ratio); Cover-management factor (fraction); Support-practice factor (fraction).
Worked example. DEC-DP01-016 — Laggala Pallegama — land degradation, 2025. Rainfall erosivity = 950 MJ mm/(ha h year); Soil erodibility = 0.035 t ha h/(ha MJ mm); Slope-length and steepness factor = 2.8 ratio; Cover-management factor = 0.24 fraction; Support-practice factor = 0.7 fraction. Estimated annual sheet/rill loss = 15.641 t/ha/year. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. R × K × LS × C × P, using a mutually consistent SI factor set.
Limits. This USLE factor product is not a full RUSLE2 run, measured loss, delivered sediment, gully loss or landslide forecast. Local factors and uncertainty need review.
Method sources. Verified published formula — USLE factor product. Government publication — United States Department of Agriculture Forest Service. 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40. https://www.ars.usda.gov/ARSUserFiles/60600505/RUSLE/A%20guide%20for%20predicting%20sheet%20and%20rill%20erosion%20on%20forest%20land.pdf. The historical source verifies the factor product. Local factor choice and suitability still need confirmation; this is not a full RUSLE2 implementation.
Domain variants. erosion. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
OPTIONS Alternative appraisal
Decision example. Compare candidate settlement expansion areas.
affordability difference = available budget − estimated option cost
Inputs and units. Option cost (LKR); Available budget (LKR); Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects.
Worked example. DEC-DP01-007 — Assisted natural regeneration, 2025. Option cost = 1,500,000 LKR; Available budget = 1,800,000 LKR. Budget remaining after option = 300,000 LKR. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Budget minus option cost. Compare benefits, adverse effects and mandatory constraints separately; no weighted score or automatic best option.
Limits. Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. options. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
COMPOSITION Composition without false aggregation
Decision example. Plan seed support around observed rice-category uptake.
category share = 100 × category count ÷ sum of compatible category counts
Inputs and units. Distinct eligible original plots (plots); Sown area recorded separately (ha).
Worked example. DEC-DP03-001 — Bg 300, 2025. Distinct eligible original plots = 107 plots; Sown area recorded separately = 115 ha. Plot count = 107 plots; Share of eligible plots = 18.259 %; Share of recorded sown area = 14.303 %. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Plot share =100 × distinct eligible plots in category / eligible plots in all categories. Sown-area shares use a separate hectare denominator; grouped inputs do not verify plot identity.
Limits. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. fragmentation, erosion area, rice plots, variety area, export composition, feedback. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
TREND Trend with uncertainty
Decision example. Review long-term trends in homogeneous station records.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
display the observed value against its recorded observation period
Inputs and units. Comparable observation (°C).
Worked example. DEC-DP08-017 — Laggala Pallegama — climate trends, 2025. Comparable observation = 28.1 °C. Observed value = 28.1 °C. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Display dated air temperatures and their mean/sample standard deviation in °C. Celsius has an arbitrary zero; do not report relative percentage change or a coefficient of variation.
Limits. Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. trend, groundwater trend. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
COST Unit cost and cost drivers
Decision example. Compare conservation cost per verified treated hectare.
operating cost = labour + materials and inputs + transport and handling
Inputs and units. Labour cost (LKR); Material/input cost (LKR); Other non-overlapping cost (LKR); Verified matching hectares (ha).
Worked example. DEC-DP02-017 — Laggala Pallegama — conservation economics, 2025. Labour cost = 180,000 LKR; Material/input cost = 255,000 LKR; Other non-overlapping cost = 62,000 LKR; Verified matching hectares = 5.4 ha. Cost per matching unit = 92,037.037 LKR/ha; Total cost = 497,000 LKR. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Sum non-overlapping costs, then divide by the matching verified quantity for the same currency and accounting period.
Limits. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. cost ha, survey cost, damage loss, basket cost, input expenditure, cost output, tonne km, verification cost. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
WATER Crop water requirement
Decision example. Prepare crop-stage irrigation recommendations.
ETc = ETo × Kc
net = max(0, ETc + DP + dS − (P − RO) − CR)
gross = net × area × 10 ÷ efficiency
N is stage water need in mm; P is daily seepage and percolation in mm/day; d is stage days; L is preparation water and W is ponding establishment in mm; Pe is effective rain and S is usable stored water in mm; A is hectares; e is additional delivery efficiency as a fraction; V is m³ per stage. ETo is mm/day and Kc is dimensionless.
Inputs and units. Irrigated crop area (ha); Reference evapotranspiration (mm/day); Crop coefficient (ratio); Rainfall reaching the field after runoff (mm/day); Deep percolation and paddy allowance (mm/day); Capillary contribution (mm/day); Desired change in stored soil water (mm/day); Field application efficiency (fraction).
Worked example. DEC-DP03-003 — Laggala Pallegama — irrigation advice, 2025. Irrigated crop area = 85 ha; Reference evapotranspiration = 4.5 mm/day; Crop coefficient = 1.1 ratio; Rainfall reaching the field after runoff = 1.6 mm/day; Deep percolation and paddy allowance = 2 mm/day; Capillary contribution = 0 mm/day; Desired change in stored soil water = 0 mm/day; Field application efficiency = 0.68 fraction. Gross daily irrigation requirement = 6,687.5 m³/day; Net field requirement = 5.35 mm/day. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. ETc = ETo × Kc. Net = max(0, ETc + percolation + desired storage increase − rainfall after runoff − capillary contribution). Gross = net × hectares ×10 / application efficiency.
Limits. The full local balance, rooting depth, stress, crop stage and operating constraints still matter. The paddy allowance is explicit and must be zero where inapplicable. This is not an authorized reservoir release.
Method sources. Verified published component — Crop evapotranspiration ETc component. Institution publication — Food and Agriculture Organization of the United Nations. Chapter 5, Crop coefficient approach, equation 56. https://www.fao.org/4/X0490E/x0490e0a.htm. This verifies the ETc component only. Local water-balance allowances, coefficients and operating decisions still need confirmation.
Domain variants. water. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
VARIANCE Plan versus actual
Decision example. Investigate differences between planned and actual use.
variance = actual − plan
Inputs and units. Planned value (ha); Observed value (ha).
Worked example. DEC-DP01-017 — Laggala Pallegama — plan implementation, 2025. Planned value = 100 ha; Observed value = 90 ha. Difference = -10 ha; Relative change = -10 %. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Observed value minus Planned value. Relative change = 100 × difference / Planned value when the earlier value is positive.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. variance, dated variance, cost progress. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
REPEAT Repeated support or overlapping claims
Decision example. Review repeated farmer assistance before new allocation.
overlap = max(0, min(end1, end2) − max(start1, start2) + 1)
Inputs and units. Permitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit.
Worked example. DEC-DP04-002 — Laggala Pallegama — support overlap, 2025. . Overlapping days = 61 days. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Compare the same permitted entity, purpose and qualifying unit. Intersect dated support intervals; overlapping support is a review flag, not proof of duplicate entitlement.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. repeat. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
QUEUE Age due date and response
Decision example. Clear delayed farmer-service requests.
past due = max(0, assessment date − due date), when open
Inputs and units. Received or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed.
Worked example. DEC-DP04-004 — Laggala Pallegama — agrarian services, 2025. . Open days past due = 29 days; Calendar age = 90 days. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Open age = assessment date − received date. Days past due = max(0, assessment date − recorded due date) for open cases. Show documented critical conditions separately.
Limits. Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. queue. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
FRESH Observation freshness and completeness
Decision example. Repair incomplete soil and weather observation coverage.
completeness = 100 × valid received observations ÷ scheduled observations
Inputs and units. Expected observations in the window (observations); Distinct valid observations (observations); Latest valid observation; Assessment date; Required observation interval (days).
Worked example. DEC-DP02-014 — Laggala Pallegama — monitoring network, 2025. Expected observations in the window = 30 observations; Distinct valid observations = 24 observations; Required observation interval = 1 days. Completeness = 80 %; Age of latest observation = 2 days; Missing observations = 6 observations. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Completeness = 100 × valid / expected. Age = assessment date − latest valid observation; compare with the explicitly supplied interval.
Limits. A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. fresh. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
BALANCE Physical mass or water balance
Decision example. Review storage consequences of proposed releases.
closing amount = opening amount + inflow − release or payment − other loss or adjustment
Inputs and units. Opening storage (m³); All measured inflows and transfers in (m³); Releases and transfers out (m³); Evaporation and other outflows (m³); Independently observed closing storage (m³).
Worked example. DEC-DP05-004 — Laggala Pallegama — reservoir operation, 2025. Opening storage = 160,000 m³; All measured inflows and transfers in = 48,000 m³; Releases and transfers out = 35,000 m³; Evaporation and other outflows = 9,000 m³; Independently observed closing storage = 163,500 m³. Calculated closing storage = 164,000 m³; Observed minus calculated closing = -500 m³. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Calculated closing = opening + inflows − releases/transfers − other outflows. Residual = independently observed closing − calculated closing.
Limits. Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. cash balance, balance, aquifer balance. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
SURVIVAL Cohort survival and retention
Decision example. Target maintenance to poorly surviving planting cohorts.
Calculation or steps confirmed survival = 100 × confirmed survivors ÷ original cohort; recorded losses = original cohort − confirmed survivors − unobserved.
Inputs and units. Original cohort (plants); Known surviving original members (plants); Known failed original members (plants); Original members with unknown follow-up (plants); Replacements in a separate cohort (plants).
Worked example. DEC-DP07-003 — Laggala Pallegama — restoration survival, 2025. Original cohort = 450 plants; Known surviving original members = 351 plants; Known failed original members = 70 plants; Original members with unknown follow-up = 29 plants; Replacements in a separate cohort = 18 plants. Confirmed survival lower bound = 78 %; Survival upper bound = 84.444 %; Unknown follow-up = 29 plants. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Lower =100 × known survivors / original cohort. Upper =100 × (known survivors + unknown) / original cohort. Survivors + known failures + unknown = original cohort; replacements do not enter it.
Limits. These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. survival, business retention, followup retention. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
ANOMALY Departure from a reviewed reference
Decision example. Issue evidence packages for local agricultural advisories.
departure = current observation − comparable baseline
Inputs and units. Comparable reference value (mm); Later/comparison value (mm).
Worked example. DEC-DP02-013 — Laggala Pallegama — agroclimate advice, 2025. Comparable reference value = 100 mm; Later/comparison value = 90 mm. Difference = -10 mm; Relative change = -10 %. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Later/comparison value minus Comparable reference value. Relative change = 100 × difference / Comparable reference value when the earlier value is positive.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. anomaly. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
SPELL Dry or wet spell duration
Decision example. Identify prolonged rainfall spells requiring advisory review.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
dry run continues only across observed consecutive dry days
Inputs and units. Observation day; Daily rainfall (mm); Example dry-day threshold (mm); Day classified as dry when rainfall.
Worked example. DEC-DP08-002 — Rattota rainfall station scenario, 2025. Daily rainfall = 4 mm; Example dry-day threshold = 1 mm. Daily rainfall = 4 mm. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Count consecutive dated observations satisfying the stated rainfall rule. Missing days interrupt a spell; do not count unknown rain as zero.
Limits. The example threshold is configurable and is not an official warning criterion.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. spell. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
SPI Standardized precipitation index
Decision example. Determine where historical rainfall supports SPI analysis.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
display rainfall input; no SPI value is calculated here
Inputs and units. Complete comparable baseline years (years); Expected monthly observations (observations); Valid comparable monthly observations (observations); Proposed accumulation period; Station history and series homogeneity checked; Distribution fit and zero-rainfall handling documented.
Worked example. DEC-DP08-004 — Laggala Pallegama — drought monitoring, 2025. Complete comparable baseline years = 30 years; Expected monthly observations = 360 observations; Valid comparable monthly observations = 350 observations. Baseline completeness = 97.222 %; Missing monthly observations = 10 observations. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Show valid/expected monthly coverage and complete baseline years. Assess distribution fit, zero rainfall, timescale and homogeneity separately; no SPI is invented.
Limits. WMO recommends a long rainfall record, ideally at least30 years. Readiness counts alone do not validate the fitted SPI method.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. spi. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
LOSS Loss measurement by supply chain stage
Decision example. Select crop stages needing loss-reduction measures.
Calculation or steps loss share = 100 × (input − saleable output − usable byproduct − closing stock) ÷ input.
Inputs and units. Batch input on stated moisture basis (kg); Saleable output (kg); Usable by-product (kg); Closing stock (kg); Documented transfers out (kg).
Worked example. DEC-DP03-014 — Laggala Pallegama — post-harvest loss, 2025. Batch input on stated moisture basis = 1,200 kg; Saleable output = 970 kg; Usable by-product = 85 kg; Closing stock = 45 kg; Documented transfers out = 20 kg. Unaccounted physical share = 6.667 %; Unaccounted mass = 80 kg. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Unaccounted = input − saleable output − usable by-products − closing stock − transfers out. Share =100 × unaccounted / input.
Limits. Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. loss. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
MARGIN Enterprise gross margin and break even
Decision example. Identify crop enterprises with weak gross margins.
gross margin = saleable quantity × realized unit price − variable cost
Inputs and units. Saleable output (kg); Realized price (LKR/kg); Variable costs (LKR); Matching crop area (ha).
Worked example. DEC-DP03-017 — Laggala Pallegama — farm income, 2025. Saleable output = 3,800 kg; Realized price = 112 LKR/kg; Variable costs = 295,000 LKR; Matching crop area = 1 ha. Enterprise gross margin = 130,600 LKR; Gross margin per hectare = 130,600 LKR/ha; Variable-cost break-even price = 77.632 LKR/kg. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Gross margin = saleable output × realized price − variable costs. Divide by matching hectares for margin/ha; variable-cost break-even price = variable costs / output.
Limits. Keep fixed costs, family-labour opportunity cost, taxes and financing identifiable. Gross margin is not net profit.
Method sources. Verified published formula — Enterprise gross margin. Institution publication — Food and Agriculture Organization of the United Nations. Chapter 4, Gross margin and section 4.7.1. https://www.fao.org/4/W7365E/w7365e07.htm. Per-hectare and variable-cost break-even outputs are algebraic rearrangements. Local costs, prices and interpretation still need confirmation.
Domain variants. margin. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
SUITABILITY Expert reviewed suitability
Decision example. Shortlist land uses compatible with local conditions.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
evidence gaps = count(missing or conflicting required items)
Inputs and units. Land polygon; Land polygon evidence reference; soil depth; soil depth evidence reference; slope degrees; slope degrees evidence reference; rainfall; rainfall evidence reference; water access; water access evidence reference; crop requirements; crop requirements evidence reference.
Worked example. DEC-DP01-005 — Laggala Pallegama — agricultural suitability, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. suitability. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
QUALITY Applicable quality limit comparison
Decision example. Refer nutrient and acidity limitations for agronomic advice.
Calculation or steps conforming share = 100 × checks recorded as conforming ÷ completed checks; exceptions = tested − conforming − awaiting interpretation.
Inputs and units. Parameter and applicable use; Measured result (pH); Example lower comparison bound (pH); Example upper comparison bound (pH); Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis.
Worked example. DEC-DP02-005 — Laggala Pallegama — soil fertility, 2025. Measured result = 6.2 pH; Example lower comparison bound = 5.5 pH; Example upper comparison bound = 7.5 pH. Measured value = 6.2 pH. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Compare the measured value only with matching parameter, unit, use and averaging period. Retain limit source/version and censored-result status.
Limits. Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. quality. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
SCHEDULE Resource constrained scheduling
Decision example. Schedule priority land-use map updates.
duration = end date − start date; check windows and conflicts
Inputs and units. Required resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort (hours); Available resource effort (hours); Predecessor task reference; Mandatory permits and prerequisites.
Worked example. DEC-DP01-020 — Laggala Pallegama — survey scheduling, 2025. Required resource effort = 16 hours; Available resource effort = 24 hours. Planned duration = 3 days; Resource hours remaining = 8 hours. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check start/end order, operating window, effort, predecessor completion and overlapping bookings for the same resource. A conflict is flagged; no optimal schedule is invented.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. schedule. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
YIELD Productivity and efficiency
Decision example. Select improvements for low water productivity.
Calculation or steps productivity = matching output ÷ resource input; multiply by 100 only for the declared output share variants.
Inputs and units. Saleable crop output (kg); Matching irrigation water input (m³).
Worked example. DEC-DP02-010 — Laggala Pallegama — on-farm irrigation, 2025. Saleable crop output = 19,780 kg; Matching irrigation water input = 7,200 m³. Crop water productivity = 2.747 kg/m³. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Saleable crop output / Matching irrigation water input, for the same product, process and period.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. water productivity, crop yield, pump energy, drilling, labour, export unit value, resource efficiency, mass conversion, process energy. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
DISTRIBUTION Distribution and outlier review
Decision example. Identify markets requiring closer price-distribution study.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
display comparable observations; no quartiles or outlier test is calculated here
Inputs and units. Comparable observation (LKR/kg).
Worked example. DEC-DP25-004 — Laggala Pallegama — market comparisons, 2025. Comparable observation = 104 LKR/kg. Observed value = 104 LKR/kg. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Display observations in dated order. Sample SD uses n−1; coefficient of variation = 100 × SD / positive mean.
Limits. Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. distribution. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
CONCENTRATION Concentration and dependence
Decision example. Identify excessive dependence on few export markets.
Calculation or steps concentration = sum of squared fractional category shares.
Inputs and units. Compatible category amount (LKR).
Worked example. DEC-DP26-002 — India, 2025. Compatible category amount = 95 LKR. Category amount = 95 LKR; Share of selected total = 4.762 %. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Category share = 100 × category amount / total compatible category amounts. HHI = sum of squared fractional shares, displayed on a 0–1 scale.
Limits. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Method sources. Verified published component — HHI concentration component. Government publication — United States Department of Justice. Definition and four-firm worked example. https://www.justice.gov/atr/herfindahl-hirschman-index. The screen uses fractional shares on a 0–1 scale, equivalent to the published percentage-share score divided by 10000. Local exposure categories and policy thresholds are not verified by this source.
Domain variants. concentration. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
MATCH Supply demand compatibility matching
Decision example. Match verified exporter offers with buyer requirements.
supply difference = available uncommitted supply − requested demand
Inputs and units. Offered product and grade; Required product and grade; Available uncommitted quantity (kg); Required quantity (kg); Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions.
Worked example. DEC-DP26-008 — Laggala Pallegama — buyer matching, 2025. Available uncommitted quantity = 1,200 kg; Required quantity = 1,500 kg. Supply minus demand = -300 kg. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Compare the same specification and unit, uncommitted quantity and overlapping delivery windows. Keep mandatory quality and use conditions explicit.
Limits. A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. match, human match, plot match. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
CAPACITY Capacity gap assessment
Decision example. Allocate staff to agrarian centres with workload gaps.
capacity balance = usable staffed capacity − required capacity
Inputs and units. Demand in the selected period (staff hours); Rated capacity for that period (staff hours); Unavailable or restricted capacity (staff hours).
Worked example. DEC-DP04-014 — Laggala Pallegama — service centres, 2025. Demand in the selected period = 150 staff hours; Rated capacity for that period = 180 staff hours; Unavailable or restricted capacity = 45 staff hours. Usable capacity minus demand = -15 staff hours; Usable capacity = 135 staff hours. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Usable capacity = rated capacity − documented unavailable capacity. Surplus/shortfall = usable − matching demand.
Limits. Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. capacity. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
RISK Reviewed risk and control assessment
Decision example. Prepare response options from authorized hydrological evidence.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
display exposed units and verified controls; no risk score is calculated here
Inputs and units. River levels; River levels evidence reference; official forecast; official forecast evidence reference; flood exposure; flood exposure evidence reference; warning protocol; warning protocol evidence reference; evacuation constraints; evacuation constraints evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient.
Worked example. DEC-DP05-006 — Laggala Pallegama — flood readiness, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. risk. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
INSPECT Inspection and evidence checklist
Decision example. Follow up incomplete conservation works.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
evidence gaps = count(missing or conflicting required items)
Inputs and units. Work ID; Work ID evidence reference; approved design; approved design evidence reference; inspection items; inspection items evidence reference; photographs; photographs evidence reference; completion evidence; completion evidence evidence reference.
Worked example. DEC-DP02-012 — Laggala Pallegama — conservation inspection, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. inspect. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
ELIGIBILITY Rules based referral for authorized determination
Decision example. Refer land-conversion applications for determination.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
evidence gaps = count(missing or conflicting required items)
Inputs and units. Application ID; Application ID evidence reference; current use; current use evidence reference; proposed use; proposed use evidence reference; ownership evidence; ownership evidence evidence reference; applicable rules; applicable rules evidence reference; objections; objections evidence reference.
Worked example. DEC-DP01-006 — Laggala Pallegama — land conversion, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. eligibility. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
FINANCE Discounted cash flow appraisal
Decision example. Appraise reservoir rehabilitation cash-flow alternatives.
Calculation or steps NPV = sum of annual net cash flow ÷ (1 + discount rate fraction) raised to the year, for years 1 to n, less initial investment.
Inputs and units. Initial investment (LKR); Net cash flow year1 (LKR); Net cash flow year2 (LKR); Net cash flow year3 (LKR); Net cash flow year4 (LKR); Net cash flow year5 (LKR); Residual value at end of year5 (LKR); Example discount rate (%).
Worked example. DEC-DP05-017 — Laggala Pallegama — rehabilitation investment, 2025. Initial investment = 2,400,000 LKR; Net cash flow year1 = 400,000 LKR; Net cash flow year2 = 550,000 LKR; Net cash flow year3 = 680,000 LKR; Net cash flow year4 = 720,000 LKR; Net cash flow year5 = 760,000 LKR; Residual value at end of year5 = 120,000 LKR; Example discount rate = 8 %. Five-year net present value = 109,847.353 LKR. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. NPV = −initial investment + sum of year1…5 net cash flows discounted at the stated annual rate, including residual value once in year5.
Limits. Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows.
Method sources. Verified published formula — Discounted cash-flow NPV. Institution publication — Food and Agriculture Organization of the United Nations. Sections 2.2.2 and 2.2.3, discounting and Net Present Value. https://www.fao.org/4/w8212e/w8212e06.htm. The five-year horizon, discount rate and cash assumptions are local settings. Verification does not approve an investment or loan.
Domain variants. finance. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
DEBT Debt service assessment
Decision example. Assess debt-service coverage under lender-defined scenarios.
debt service coverage = cash available for debt service ÷ scheduled principal and interest
Inputs and units. Cash available for debt service (LKR); Scheduled principal for same period (LKR); Scheduled interest for same period (LKR); Repayment and cash-flow period.
Worked example. DEC-DP38-002 — Laggala Pallegama — repayment capacity, 2025. Cash available for debt service = 860,000 LKR; Scheduled principal for same period = 500,000 LKR; Scheduled interest for same period = 120,000 LKR. Debt-service coverage = 1.387 ratio; Cash after scheduled debt service = 240,000 LKR. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Debt-service coverage = cash available / (principal + interest) for the same period. Zero scheduled debt has no coverage ratio.
Limits. No lender covenant, credit decision, borrower eligibility or legal consequence is inferred. Seasonal repayment timing and downside scenarios remain explicit.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. debt. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
FUNDING Funding and commitment reconciliation
Decision example. Reconcile provincial agriculture funding and verified activities.
funding gap = financing need − confirmed commitments
Inputs and units. Approved financing need (LKR); Confirmed commitments (LKR); Funds actually disbursed (LKR); Verified eligible expenditure (LKR).
Worked example. DEC-DP10-017 — Laggala Pallegama — budget delivery, 2025. Approved financing need = 3,500,000 LKR; Confirmed commitments = 2,650,000 LKR; Funds actually disbursed = 1,640,000 LKR; Verified eligible expenditure = 1,200,000 LKR. Unfunded need = 850,000 LKR; Committed but not disbursed = 1,010,000 LKR; Disbursed but not spent = 440,000 LKR. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Unfunded = need − commitments. Undisbursed = commitments − disbursements. Unspent = disbursements − eligible spending.
Limits. Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. funding. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
CARBON Carbon stock and stock change assessment
Decision example. Review inventory evidence for carbon-stock estimates.
carbon stock change = (current carbon density − baseline carbon density) × inventory area
Inputs and units. Earlier carbon density (t C/ha); Later carbon density (t C/ha); Same inventory area (ha); Included pools and allometry references.
Worked example. DEC-DP07-013 — Laggala Pallegama — forest carbon, 2025. Earlier carbon density = 100 t C/ha; Later carbon density = 90 t C/ha; Same inventory area = 85 ha. Carbon stock change = -850 t C; Carbon-density change = -10 t C/ha. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. (Later carbon density − earlier carbon density) × same inventory area, with identical pools, method and boundaries.
Limits. Inventory plots, allometry and uncertainty remain required evidence. Stock change is not an issued carbon credit, additionality test or payable service.
Method sources. Verified published component — Carbon stock-difference component. Institution publication — Intergovernmental Panel on Climate Change. Section 2.3.1.1, equation 2.8, stock-difference method. https://www.ipcc-nggip.iges.or.jp/public/2006gl/pdf/4_Volume4/V4_02_Ch2_Generic.pdf. The screen reports the period total. IPCC annualisation requires elapsed years. Pools, inventory inputs and local application still need confirmation.
Domain variants. carbon. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
SOILCARBON Soil carbon stock comparison
Decision example. Select sites for comparable soil-carbon monitoring.
Calculation or steps soil carbon stock = carbon percent ÷ 100 × bulk density × depth × 10000 × (1 − coarse fragment percent ÷ 100).
Inputs and units. Soil organic carbon (%); Fine-earth bulk-density basis (t/m³); Sample depth (m); Coarse-fragment volume fraction (%); Sampling depth, design and density convention.
Worked example. DEC-DP02-004 — Laggala Pallegama — soil carbon, 2025. Soil organic carbon = 1.8 %; Fine-earth bulk-density basis = 1.25 t/m³; Sample depth = 0.3 m; Coarse-fragment volume fraction = 12 %. Soil-carbon stock = 59.4 t C/ha. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. (Organic carbon% /100) × bulk density × depth ×10000 × (1−coarse% /100). Confirm that the density and coarse-fragment conventions are mutually consistent.
Limits. A carbon concentration is not a stock. Change comparisons require consistent depth/mass, sampling, density convention and uncertainty review.
Method sources. Verified published formula — Soil-carbon stock with volume correction. Institution publication — Intergovernmental Panel on Climate Change. Section 4.3.3.5.4, equation 4.3.3, printed page 4.106, PDF page 18. https://www.ipcc-nggip.iges.or.jp/public/gpglulucf/gpglulucf_files/Chp4/Chp4_3_Projects.pdf. The screen converts carbon percent to a fraction and uses the published coarse-fragment volume convention. Sampling and bulk-density conventions still need confirmation.
Domain variants. soilcarbon. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
BIODIVERSITY Comparable biodiversity assessment
Decision example. Select comparable forest biodiversity surveys.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
display observed species richness alongside survey effort
Inputs and units. Observed distinct species (species); Survey effort (hours); Survey protocol and version; Survey season and taxonomic scope; All planned survey visits completed.
Worked example. DEC-DP07-018 — Laggala Pallegama — biodiversity monitoring, 2025. Observed distinct species = 28 species; Survey effort = 18 hours. Observed richness = 28 species; Recorded effort = 18 hours. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Show distinct observed species with survey effort, protocol, season and completed visits. No correction for detection is silently inferred.
Limits. Observed richness is not population size or occupancy. Comparable effort alone does not remove detection bias or establish a biodiversity trend.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. biodiversity. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
IMPACT Outcome and attribution evaluation
Decision example. Evaluate conservation practice outcomes.
Calculation or steps difference in differences = (treatment after − treatment before) − (comparison after − comparison before).
Inputs and units. Treatment Measured runoff before (mm/season); Treatment Measured runoff after (mm/season); Comparison Measured runoff before (mm/season); Comparison Measured runoff after (mm/season); Study design and comparability evidence; Outcome definition, method and reference basis.
Worked example. DEC-DP02-016 — Laggala Pallegama — demonstration trials, 2025. Treatment Measured runoff before = 42 mm/season; Treatment Measured runoff after = 59 mm/season; Comparison Measured runoff before = 39 mm/season; Comparison Measured runoff after = 46 mm/season. Difference in changes = 10 mm/season. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. (Treatment after−before) − (comparison after−before), using the same outcome definition and periods.
Limits. The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence.
Method sources. Verified published formula — Difference-in-differences arithmetic. Institution publication — World Bank. Chapter 7, table 7.2, printed page 140, PDF page 170. https://documents1.worldbank.org/curated/en/698441474029568469/pdf/Impact-evaluation-in-practice.pdf. The formula is verified. Causal interpretation still requires a defensible study design, comparison and assumptions.
Domain variants. impact, study design. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
PRICE Comparable market price analysis
Decision example. Investigate large comparable farmgate wholesale and retail spreads.
net quote return = sell × (1 − loss fraction) − buy − transfer cost
Inputs and units. Comparable purchase quotation (LKR/kg); Comparable selling quotation (LKR/kg); Non-overlapping transfer costs (LKR/kg); Expected saleable mass loss (%); Product, grade and price basis.
Worked example. DEC-DP25-001 — Laggala Pallegama — price spreads, 2025. Comparable purchase quotation = 180 LKR/kg; Comparable selling quotation = 222 LKR/kg; Non-overlapping transfer costs = 20 LKR/kg; Expected saleable mass loss = 5 %. Quoted net return per purchased kg = 10.9 LKR/kg; Unadjusted quoted spread = 42 LKR/kg. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Quoted spread = sell−buy. Net scenario return per purchased kg = sell×(1−loss%/100)−buy−matching transfer costs.
Limits. Use matching grade, price date, currency, mass basis and payment terms. This quotation scenario excludes unlisted costs and is not realized profit or a forecast.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. price. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
VOLATILITY Price variability and seasonality
Decision example. Prioritize commodities with unusual price variability.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
sample CV = 100 × sample SD ÷ positive mean
Inputs and units. Comparable observation (LKR/kg).
Worked example. DEC-DP25-002 — Laggala Pallegama — price volatility, 2025. Comparable observation = 104 LKR/kg. Observed value = 104 LKR/kg. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Display observations in dated order. Sample SD uses n−1; coefficient of variation = 100 × SD / positive mean.
Limits. Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend.
Method sources. Verified published formula — Sample coefficient of variation. Government publication — National Institute of Standards and Technology United States. Description, sample coefficient of variation and ratio-scale restrictions. https://www.itl.nist.gov/div898/software/dataplot/refman2/auxillar/coefvari.htm. Use a meaningful zero and positive mean. Local series selection and decision limits still need confirmation.
Domain variants. volatility. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
INVENTORY Stock expiry and reorder planning
Decision example. Plan seed procurement against seasonal demand.
available stock = usable stock − confirmed commitments
Inputs and units. Physical stock (kg seed); Quarantined stock (kg seed); Expired stock (kg seed); Committed usable stock (kg seed); Additional demand (kg seed); Supplier lead time (days); Remaining shelf life of usable stock (days).
Worked example. DEC-DP03-010 — Laggala Pallegama — seed supply, 2025. Physical stock = 1,200 kg seed; Quarantined stock = 100 kg seed; Expired stock = 50 kg seed; Committed usable stock = 740 kg seed; Additional demand = 500 kg seed; Supplier lead time = 14 days; Remaining shelf life of usable stock = 30 days. Uncommitted usable stock = 310 kg seed; Additional demand gap = 190 kg seed. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Usable = physical−quarantined−expired (non-overlapping groups). Available = usable−commitments. Additional gap = max(0, new demand−available).
Limits. Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. inventory. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
MAINTENANCE Asset maintenance prioritization
Decision example. Prioritize repair packages within engineering and budget limits.
past due = max(0, assessment date − due date), when open
Inputs and units. Received or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed.
Worked example. DEC-DP05-009 — Laggala Pallegama — canal rehabilitation, 2025. . Open days past due = 29 days; Calendar age = 90 days. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Open age = assessment date − received date. Days past due = max(0, assessment date − recorded due date) for open cases. Show documented critical conditions separately.
Limits. Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. maintenance. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
FLOW Process progression and conversion
Decision example. Follow up farmers who received technical guidance.
completion share = 100 × completed cases ÷ entered cases
Inputs and units. Unique original cohort entrants (cases); Entrants reviewed (cases); Entrants with verified completion (cases); Entrants with unknown follow-up (cases).
Worked example. DEC-DP03-019 — Laggala Pallegama — advisory effectiveness, 2025. Unique original cohort entrants = 180 cases; Entrants reviewed = 132 cases; Entrants with verified completion = 96 cases; Entrants with unknown follow-up = 12 cases. Verified completion share = 53.333 %; Not verified complete = 84 cases. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. 100 × verified completed members / original unique cohort. Keep unknown follow-up separate; stages are nested, not independent populations.
Limits. Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. flow. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
ROUTE Access and logistics comparison
Decision example. Compare access improvements for isolated planning areas.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
display supplied route distance, travel time and vehicle capacity; no route is calculated here
Inputs and units. Verified route distance (km); Estimated route travel time (minutes); Usable vehicle/team capacity (units); Required capacity (units); Access, closures and operating conditions; Operating and service window.
Worked example. DEC-DP01-014 — Laggala Pallegama — service access, 2025. Verified route distance = 24 km; Estimated route travel time = 65 minutes; Usable vehicle/team capacity = 18 units; Required capacity = 15 units. Estimated travel time = 65 minutes; Capacity minus demand = 3 units. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Compare supplied route times/distances, usable capacity and documented access/window constraints. Display feasible candidates; no route optimization is implied.
Limits. Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. route. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
PES Environmental service verification and payment proposal
Decision example. DEC-DP39-011 — What payment can we propose?
payment proposal = min(verified service quantity × proposed contract rate, contract cap)
Inputs and units. Agreement and version; provider; payer; area meeting annual conditions (ha); illustrative annual rate (LKR/ha/year); annual cap (LKR/year); amount already paid (LKR); field-check, rights and funding evidence; available funds and references.
Worked example. Laggala Pallegama farmer group, 2025: 20 accepted ha × LKR 12,500 per ha/year = LKR 250,000, below the LKR 300,000 annual cap. Already paid = zero. Funding evidence is missing, so no amount is ready for authorisation. All figures are fictional.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. In the retained equation, verified service quantity means hectares meeting this annual agreement, rate means the illustrative annual rate and cap means the annual cap. Subtract payments for these same annual conditions to avoid paying twice. Check independent verification, rights and matching funds before referring the remaining proposal.
Limits. This is a project example, not a published PES tariff. Work compliance does not establish a measured ecosystem outcome, eligibility, entitlement or payment authorisation.
Method sources. FAO Working Paper 11-20, section 2, supplies PES context and cautions. It does not prescribe this rate, cap or payment rule. The local payment example requires validation.
PES decisions. DEC-DP39-002 checks physical work only. DEC-DP39-011 calculates the proposal. The 20 separate questions and required evidence are listed in section 6 4 and the decision register.
ACCOUNT Physical and monetary ecosystem accounting
Decision example. Prepare separate physical service accounts.
closing physical stock = opening stock + additions − reductions
Inputs and units. Opening ecosystem extent (ha); Extent additions (ha); Extent reductions (ha); Measured service flow in the period (physical service units); Service definition and flow unit; Separate monetary valuation method/price year.
Worked example. DEC-DP12-012 — Laggala Pallegama — ecosystem services, 2025. Opening ecosystem extent = 750 ha; Extent additions = 92 ha; Extent reductions = 48 ha; Measured service flow in the period = 1,200 physical service units. Closing ecosystem extent = 794 ha; Physical service flow = 1,200 physical service units. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Closing extent = opening + additions − reductions. Record the period service flow separately; do not add a flow to an asset stock or multiply by an arbitrary PES rate.
Limits. Keep extent, condition, physical service flows and monetary accounts distinct. A defensible valuation method, price year and accounting boundary are needed for monetary results.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. account. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
CONSENT Consultation and unresolved condition review
Decision example. Resolve unresolved tenure objections before planning.
response share = 100 × participants responding ÷ invited participants
Inputs and units. Distinct relevant people invited (people); People who responded (people); Unresolved issues (issues); Proposal/version being discussed; Required participation channels accessible.
Worked example. DEC-DP01-011 — Laggala Pallegama — tenure conflicts, 2025. Distinct relevant people invited = 95 people; People who responded = 68 people; Unresolved issues = 16 issues. Response share = 71.579 %; Unresolved issues = 16 issues. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. 100 × distinct respondents / invited people. Record unresolved issues individually; one respondent may raise several issues.
Limits. Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. consent. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
ACCESS Permission and publication review
Decision example. Check source rights and approval before publishing products.
evidence gaps = count(missing or conflicting required items)
Inputs and units. Product version; Product version evidence reference; forecast validity; forecast validity evidence reference; review; review evidence reference; publication authority; publication authority evidence reference; license; license evidence reference; audience; audience evidence reference.
Worked example. DEC-DP08-020 — Laggala Pallegama — forecast publication, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. access. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
METADATA Dataset fitness and interoperability
Decision example. Correct incomplete land-use layer metadata.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
evidence gaps = count(missing or conflicting required items)
Inputs and units. Layer ID; Layer ID evidence reference; scale; scale evidence reference; coordinate system; coordinate system evidence reference; classification edition; classification edition evidence reference; owner; owner evidence reference; survey date; survey date evidence reference.
Worked example. DEC-DP01-019 — Laggala Pallegama — map documentation, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. metadata. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
REPRODUCE Reproducibility and result verification
Decision example. Review reproducibility of soil and land assessments.
reproduction difference = reproduced result − expected result
Inputs and units. Earlier/source value (t/ha/year); Independently reproduced value (t/ha/year); Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance (t/ha/year); Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer.
Worked example. DEC-DP02-020 — Laggala Pallegama — model assurance, 2025. Earlier/source value = 100 t/ha/year; Independently reproduced value = 90 t/ha/year; Documented absolute comparison tolerance = 0.01 t/ha/year. Difference = -10 t/ha/year; Relative change = -10 %. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Reproduced minus expected result, within an explicitly supplied absolute tolerance, using the same exact input/method versions and a separate checker. Retain originals, code, parameters and environment evidence.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. reproduce. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
CLASSIFY Controlled classification and taxonomy review
Decision example. Reconcile inconsistent land and water system codes.
evidence gaps = count(missing or conflicting required items)
Inputs and units. Source system labels; Source system labels evidence reference; official system registry; official system registry evidence reference; geometry edition; geometry edition evidence reference; steward decisions; steward decisions evidence reference.
Worked example. DEC-DP06-020 — Laggala Pallegama — system reporting, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. classify. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
RELIABILITY Service reliability
Decision example. Prioritize aviation meteorological service interruptions.
availability = 100 × (scheduled service time − verified downtime) ÷ scheduled service time
Inputs and units. Scheduled observation window (hours); Union of qualifying outage intervals (hours); Eligible service requests (requests); Failed eligible requests (requests); Measured response time (ms).
Worked example. DEC-DP08-015 — Laggala Pallegama — aviation services, 2025. Scheduled observation window = 168 hours; Union of qualifying outage intervals = 13 hours; Eligible service requests = 1,000 requests; Failed eligible requests = 40 requests; Measured response time = 800 ms. Time availability = 92.262 %; Request success = 96 %; Measured response time = 800 ms. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Time availability =100 ×(scheduled−non-overlapping outage)/scheduled. Request success =100 ×(requests−failed)/requests. Response time is a separate measure.
Limits. State maintenance exclusions, operating window, probe, workload and service objective. Observed response time is not a p95 claim unless the percentile is actually measured.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. reliability. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
NRW Non revenue water diagnosis
Decision example. Prioritize systems with large unexplained water balances.
Calculation or steps non revenue water = system input − billed authorized consumption; estimated real loss = input − billed − unbilled authorized use − apparent losses.
Inputs and units. Corrected system input (m³); Billed authorized consumption (m³); Unbilled authorized consumption (m³); Estimated apparent losses (m³).
Worked example. DEC-DP22-001 — Laggala Pallegama — non-revenue water, 2025. Corrected system input = 80,000 m³; Billed authorized consumption = 57,000 m³; Unbilled authorized consumption = 3,200 m³; Estimated apparent losses = 4,500 m³. Non-revenue water = 23,000 m³; NRW share = 28.75 %; Water losses = 19,800 m³; Residual real-loss estimate = 15,300 m³. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. NRW=input−billed authorized use. Water losses=NRW−unbilled authorized use. Residual real loss=water losses−estimated apparent losses, only when all components are available.
Limits. NRW is not all leakage. An unknown apparent-loss estimate keeps residual real loss unavailable. Meter uncertainty and matching time/zone boundaries matter.
Method sources. Verified published component — IWA water-balance components. Institution publication — Asian Development Bank. Figure 4, printed page 15; Annex 1 Water Balance Definitions, printed pages 39–41, PDF pages 47–49. https://www.adb.org/sites/default/files/publication/27473/reducing-nonrevenue-water.pdf. Apparent-loss estimates and the residual real-loss estimate remain local inputs with measurement uncertainty.
Domain variants. billed water, leakage evidence. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
STAR Specialist species threat and restoration appraisal
Decision example. Refer candidate conservation actions for specialist threat assessment.
Current rule. Use the exact DOMAIN-1 decision variant; the representative example does not establish all local applications.
evidence gaps = count(missing or conflicting required items)
Inputs and units. Species range; Species range evidence reference; threats; threats evidence reference; action feasibility; action feasibility evidence reference; threat reduction evidence; threat reduction evidence evidence reference; uncertainty; uncertainty evidence reference.
Worked example. DEC-DP19-004 — Laggala Pallegama — threat reduction, 2025. . Evidence gaps = 1 items. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.
Limits. Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.
Method sources. Validation required. Project rule or local adaptation. Sources and evidence are listed in the controlled decision register.
Domain variants. star. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
SURVEY Design based statistical estimation
Decision example. Select defensible geographic poverty and income comparisons.
Calculation or steps weighted mean = sum of weight × observation ÷ sum of weights.
Inputs and units. Final design weight (weight); Observed variable (LKR/household); Stratum and primary sampling unit.
Worked example. DEC-DP20-002 — Laggala Pallegama — poverty reporting, 2025. Final design weight = 2 weight; Observed variable = 68,000 LKR/household. Observed variable = 68,000 LKR/household. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Weighted mean = sum(weight×observation)/sum(weight). Estimated total = sum(weight×observation), only for weights and population coverage suitable for that estimand.
Limits. Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision.
Method sources. Verified published component — Weighted estimation component. Institution publication — United Nations Statistics Division. Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting. https://unstats.un.org/UNSDWebsite/statcom/session_57/documents/BG-3k-Handbook_on_Surveys_of_Household_and_Individuals-E.pdf. Local weights, population coverage, design variance and ratio-yield interpretation still need confirmation. Positive illustrative weights do not demonstrate every calibration design.
Domain variants. weighted proportion, survey, survey precision, weighted area production. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
FORECAST Forecast verification
Decision example. Review forecast errors before operational changes.
Calculation or steps error = forecast − observed; RMSE = square root of mean squared errors.
Inputs and units. Archived forecast rainfall (mm); Verifying observed rainfall (mm); Forecast lead time (hours); Forecast issue date; Forecast valid date.
Worked example. DEC-DP08-007 — Laggala Pallegama — forecast verification, 2025. Archived forecast rainfall = 48 mm; Verifying observed rainfall = 41.76 mm; Forecast lead time = 24 hours. Forecast minus observed = 6.24 mm. Realistic sample data; the exact evidence fields remain in the decision register.
Input changes. Recalculate the same selected evidence; reject invalid components and keep missing values distinct from zero. Retain exact source and method versions in the output.
Procedure. Error=forecast−observed. Matched-pair RMSE=sqrt(mean(error²)); MAE=mean(abs(error)); bias=mean(error).
Limits. Match lead, valid interval, location, variable, units and observation quality. Do not verify a forecast against data available when it was issued.
Method sources. Verified published formula — Matched-pair RMSE. Government publication — Environment and Climate Change Canada. Displayed RMSE equation and definitions of forecast, observation and verification count. https://weather.gc.ca/verification/scores/rmse_e.html. Local verification periods, observation quality and forecast applicability still need confirmation.
Domain variants. forecast, probability forecast. Use the exact decision contract and unit in Decision_Register.csv; a family name alone does not establish equivalence. Confirm local choices in Institution review only.
4 Retained method references
Method References is the controlled catalogue of all 139 retained definitions. Each row preserves the original formula or procedure, inputs, units, limits and context link. Its category identifies direct publication support or Validation required, with the publisher and method-source locator where checked. Family mappings are candidates only. A published retained method is not implemented merely because a related prototype screen exists.
The source register separates link access from formula support. Official alternatives are now linked for the three previously unavailable entries, so all 33 follow-up entries have readable preferred references. The LUPPD report and FAO guide support planning context; they are not approved replacements for the local divisional manual. Experts must still confirm each selected method, source edition, units and local suitability.
NF012 is an absolute forecast error; VARIANCE is a signed plan difference. NF147 specifies discounted payback, but its linked appraisal and the current cash flow helper use simple or undiscounted payback. NF049 to NF053 and NF055 to NF058 use a water-stress context link that does not establish their methods. NF107 parameter compliance is not the full SDG 6.3.2 water-body indicator. These methods remain separate review questions.
Open all 139 retained method references
5 Sources
Calculation Sources contains all 133 records, original links, checked alternatives, locators and access results. S01 links the LUPPD report hosted by Parliament; NF-SOURCE-04 links FAO planning guidance; NF-SOURCE-12 links a HARTI price bulletin with market, unit and date columns. The original LUPPD manual was not recovered. Local procedure, data rights and method acceptance remain pending in Institution review.
S69 FAO 56: crop evapotranspiration
Published method. FAO 56 Chapter 5 equation 56; ETc = Kc × ETo. Retrieved text for review.
S71 IUCN Species Threat Abatement and Restoration metric
Published specialist method overview. Scientific underpinning and approach; full STAR calculation is not implemented. Retrieved text for review.
S72 IWA non-revenue water management
Published definition. Opening NRW definition; detailed water audit protocol not supplied. Retrieved text for review.
S75 Environment Canada: root mean squared error
Published method. What is Root Mean Square Error; displayed formula. Retrieved text for review.
S76 FAO enterprise and activity budgeting
Published method. Section 4.3.8 Gross margin; section 4.7 Parametric budgeting. Retrieved text for review.
PROTO SHARED prototype calculation and workflow implementation
Project implementation. DecisionSupportModel.spec/project and named model functions in each entry. Read only prototype inspection.
SRS SHARED Software Requirements Specification
Project requirement. Sections 5.4, 10, 12 and named requirement IDs in each rule. Version 1.6.
S78 FAO Irrigation Water Management Training Manual 3
Published method. Chapter 4.4 Irrigation water need of rice; steps 1 to 8. Method text checked.
S79 IPCC 2006 Guidelines Volume 4 Chapter 2
Published method. Sections 2.2.3, 2.3.1 and 2.3.3; soil stock guidance printed page 2.37. Method text checked.
S80 USDA Forest Service A guide for predicting sheet and rill erosion on forest land
Historical published method. Universal Soil Loss Equation and Applying the USLE; printed page 2. Historical method text checked; current local calibration not established.
S81 FAO Guidelines for financial economic environmental and social information
Published method. Net Present Value and Internal Rate of Return subsections. Method text checked.
S82 WMO Standardized Precipitation Index User Guide
Published method. WMO No 1090; SPI calculation and interpretation guidance. Full guide checked; local fit and baseline pending.
S83 US Department of Justice Herfindahl Hirschman Index
Published definition. Definition of the sum of squared market shares. Definition checked; US legal thresholds do not apply to this project.
S84 NIST Coefficient of Variation
Published definition. Description of sample CV and ratio scale restriction. Definition checked.
S85 Turf area API
Software method. Version 7.2.0 area; square metres. Documentation checked.
S86 Turf distance API
Software method. Version 7.2.0 distance; Haversine method. Documentation checked.
S87 Turf length API
Software method. Version 7.2.0 length; selected units. Documentation checked.
S88 Turf buffer API
Software method. Version 7.2.0 buffer; radius and steps. Documentation checked.
S89 Turf intersect API
Software method. Version 7.2.0 intersect; polygon intersection. Documentation checked.
S90 Turf point in polygon API
Software method. Version 7.2.0 booleanPointInPolygon; boundary option. Documentation checked.
S91 UN Handbook of Surveys on Households and Individuals
Published guidance. Chapter 9 section 9.4.2, equation 9-16, printed page 9-19 (PDF page 427); Chapter 8 weighting; Final Draft. Weighting guidance checked; draft status retained.
S92 World Bank Impact Evaluation in Practice Second Edition
Published method. Chapter 7 Difference in Differences. Method text checked.
Specific source limits remain open: S16 needs custodian confirmation of jurisdiction; S51 does not establish the intended budgeting guide; S72 gives the NRW definition but not the full utility audit protocol. S80 is a historical USLE source, not a current local calibration. The WMO SPI guide and IUCN STAR overview do not make those full methods implemented in the prototype.
6 Approval and acceptance
Use published methods as their documented basis. Check the exact source and the copied calculation once. Ask the client or expert to confirm only local use, project choices and new or changed rules. Review each shared method once and list where it is used.
Published methods and sources
The core methods below already have a published basis. They do not need to be proved again for every screen. Their local inputs, settings, suitability and intended use remain subject to the confirmation list below. A published reference does not mean that the prototype implements the full method.
Published method | Publication and locator | Local use |
|---|---|---|
Sheet and rill erosion EROSION, NF023 | S80 USDA Forest Service A guide for predicting sheet and rill erosion on forest land. Universal Soil Loss Equation and Applying the USLE; printed page 2 NF-SOURCE-03 FAO Revised Universal Soil Loss Equation toolbox. FAO RUSLE toolbox: equation A = R K L S C P and factor definitions | The USDA source is historical. Confirm current local factors and suitability. |
Enterprise gross margin MARGIN | S76 FAO enterprise and activity budgeting. Section 4.3.8 Gross margin; section 4.7 Parametric budgeting | Confirm which revenue and variable costs are included. |
Net present value FINANCE | S81 FAO Guidelines for financial economic environmental and social information. Net Present Value and Internal Rate of Return subsections | Confirm cash flows, price basis and discount rate. |
Soil carbon stock SOILCARBON, NF034 | S79 IPCC 2006 Guidelines Volume 4 Chapter 2. Sections 2.2.3, 2.3.1 and 2.3.3; soil stock guidance printed page 2.37 | Confirm sampling, depth, bulk density, units and coarse-fragment basis. |
Impact comparison using difference in differences IMPACT | S92 World Bank Impact Evaluation in Practice Second Edition. Chapter 7 Difference in Differences | Confirm the comparison group and study assumptions. |
Weighted mean SURVEY | S91 UN Handbook of Surveys on Households and Individuals. Chapter 9 section 9.4.2, equation 9-16, printed page 9-19 (PDF page 427); Chapter 8 weighting; Final Draft | The cited UN handbook is a Final Draft. Confirm the survey design and weights. This citation does not cover every pooled-rate rule. |
Forecast error using RMSE FORECAST | S75 Environment Canada: root mean squared error. What is Root Mean Square Error; displayed formula | Confirm matching observations, locations, periods and forecast lead times. |
Paddy irrigation depth requirement NF037 | S78 FAO Irrigation Water Management Training Manual 3. Chapter 4.4 Irrigation water need of rice; steps 1 to 8 | Confirm crop stage, soil, rainfall and water-management inputs. |
Coefficient of variation NF086, NF115 | S84 NIST Coefficient of Variation. Description of sample CV and ratio scale restriction | Confirm compatible observations and a meaningful positive mean. It is not a return-volatility method. |
Standardized Precipitation Index NF095 | S82 WMO Standardized Precipitation Index User Guide. WMO No 1090; SPI calculation and interpretation guidance | Confirm the rainfall record, fitting procedure and local interpretation. The separate SPI demonstration remains Validation required. |
How to check each item
Category | Check needed |
|---|---|
Government publication | Record the government publisher, publication, edition and exact page or section. Confirm local inputs and settings where needed. |
Institution publication | Record the institution, publication, edition and exact page or section. Keep draft and historical status visible. Confirm local inputs and settings where needed. |
Validation required | Review new or changed domain rules, incomplete source matches and local assumptions. A data table or background page alone does not support a formula. |
Software check | The developer tests the copied formula, arithmetic, units and invalid or missing inputs. Ordinary arithmetic does not need separate scientific approval. |
Client and expert decisions
These decisions remain pending in Institution review. Each decision should state what was checked, who checked it, the outcome and any conditions. One review can cover the same method used by several screens.
Topic | What to confirm | Who |
|---|---|---|
Scope and institutions C01, C02, C12 | Confirm the final features, proposed decisions, participating institutions and what stays in existing tools. | Client |
Responsibilities C02 | Name who owns data, submits records, reviews them and approves sharing. | Client and institutions |
Maps and boundaries C03 | Confirm official boundaries and area codes. Resolve the different GN totals. | Data custodian and GIS expert |
Data sources C04 | Confirm datasets, fields, units, update frequency and access or sharing conditions. | Source institutions |
Privacy C05 | Confirm access to personal records, sensitive locations and retention periods. | Client and privacy specialist |
New or changed calculations E01 | Review proposed scores, weights, thresholds, missing-value rules and method changes. For published methods, confirm local inputs, units, settings and intended use. | Relevant expert or statistician |
Land soil and water methods E02 | Confirm local suitability, sampling, laboratory methods and model factors. | Relevant domain experts |
Ecosystem services and PES E03 | Confirm eligibility, rights, rates, safeguards, verification and payment authority. | Client and relevant experts |
Indicators and payments C10 | Confirm indicator definitions, acceptance measures, milestones and payment weights. | Client and monitoring or finance specialists |
Languages and access needs C06 | Confirm wording, supported devices and accessibility requirements. | Client and representative users |
Technical choices and service targets C07, C08 | Agree architecture, hosting, operator, costs, performance, security and recovery targets. | Client and technical adviser |
Complaints and appeals C09 | Confirm receiving officers, response times and the appeal process. | Client |
Final SRS acceptance C11 | Confirm consultation comments, agreed revisions, validation, final presentation and final acceptance. | Authorized client representative |
Source details to confirm
LUPPD: the alternative publications provide planning context. The applicable local planning procedure still needs confirmation under C04 and E02.
HARTI: the published prices support the quoted observations. They do not automatically support proposed volatility, spread or other analysis; review these under C04 and E01.
Live-system security, load and recovery tests belong to implementation. The SRS needs agreed requirements and a test plan. No separate expert approval is needed for each mock screen or repeated calculation.
Record decisions in Institution review only. Keep the source reference, method and affected uses with the decision. A changed method or changed local settings needs a new review of the change; an unchanged shared method can reuse the recorded decision.
The rice-plot examples NF001 and NF002 use fictional grouped counts; plot identity and local category definitions still need confirmation. The disputed PMU finance and procurement examples remain proposed until the client confirms scope.
6 1 Architecture Rules and Worked Examples
Category: Validation required. Source: prototype model functions capacity, expertReport, intervalAggregate, rasterExample, evolutionDemo, extractionDemo and canRead; storage proposals use the versioned architecture catalogue. These project-defined demonstrations extend SRS section 10.9. Named official references support only their stated components, not local adoption. The model, worked examples, field mappings and exact source locators are supplied at system-diagrams/data-architecture-model.js and data-architecture-research.json. Device specifications establish neither local scientific suitability nor access permission.
Packet counts and storage arithmetic
Scalar observations per day = devices × observed properties × samples per day. Packets per day = devices × transmissions per day when one transmission contains all the properties. For 100 stations and one-minute reporting: 100 × 10 × 1,440 = 1,440,000 scalar observations/day, while 100 × 1,440 = 144,000 packets/day. Database rows depend on the chosen packet and observation representation. Bytes/day must use declared measured or assumed bytes per packet and scalar record, plus separate index, projection, file and backup allowances. These are sizing illustrations, not benchmarks or prices.
Cultivation fact grain and annual aggregation
Keep one value per source release, area/boundary version, crop category, season and year. Reject duplicate category-season keys and overlapping definitions before aggregation. Sum compatible seasonal hectares into gross annual cultivated area. Do not call this unique physical land area without plot geometry and an approved union method. Preserve source coverage, missing values and the category definition used in the saved report. A later category crosswalk creates a new projection version; earlier reports retain their original categories.
Weather facts and safe joins
Keep rainfall accumulation and temperature intervals independent from cultivation facts. Reconcile duplicate intervals, counter resets and corrections before accumulating rainfall. Average compatible temperature measurements using explicit duration or approved spatial weights. Required missing coverage withholds a complete annual result. Aggregate weather to one compatible area-year result before joining cultivation categories. One weather result can be displayed beside several categories, but must not be summed once per category. A station point represents its recorded location; district coverage requires a reviewed mapping and weighting method.
Raster example
A rainfall or vegetation raster product retains provider/product version, grid, time step, variable or band, unit, resolution, no-data and quality masks, coordinate system and licence. Align grids using declared reprojection and resampling appropriate to the variable. Preserve masks and cell areas for zonal extraction. Sum rainfall only over compatible time intervals and valid coverage. Use area-weighted means for compatible cell values; do not mix differing resolutions or treat masked cells as zero. Record chunking, input asset references, boundary version and extraction-method version so a revised source or boundary triggers an identifiable rebuild.
Four definition-change examples
Soil electrical conductivity: add a versioned optional attribute with an explicit unit, method, sampling context and effective date. Older records remain not collected rather than zero. Crop reclassification: retain the original category edition and apply a reviewed many-to-many crosswalk only in a new report version. Station relocation: create a new deployment/location interval and link readings to the deployment effective at measurement time. Reservoir capacity: retain separate institution-owned gross and effective capacity claims with units, level/datum context, source editions and periods. Neither a similar label nor a newer receipt silently chooses the authoritative claim.
AI candidate checks
An extraction result must identify the exact source version and evidence spans. An unknown unit, ambiguous place, missing total or unresolved field remains unresolved. Parse and reconcile reliable structured tables deterministically, using AI only where the selected method adds value. Validate candidate types, units, periods, geography and totals, then display the source and editable candidate side by side. Only an explicit authorised review commits the candidate in the simulation. A schema-conforming response or an invented confidence number does not establish factual accuracy.
Source rights and derived outputs
Derived rows, map tiles, aggregates, report artifacts and retrieval chunks retain source-version dependencies. A read or export applies current actor access and current source rights. A withdrawal invalidates affected caches and prevents new public retrieval and exports, even before a full index rebuild. Retain historical material only under an explicit restricted retention policy. A withdrawn source must not remain available through a stale cached report. Copies already downloaded outside the platform cannot be recalled by this demonstration.
Storage options and upgrade decisions
Option A is the starting point: the existing modular application, operational/geospatial capability, protected files and bounded analytical views. Choose Option B when measured cross-domain query cost or repeatable reporting needs justify a governed mart, semantic measures and selected cubes or retrieval indexes. Choose Option C only when measured telemetry throughput, stream latency, raster volume or research queries justify specialist engines. Set and measure the required workload, lag, query and recovery budgets before adoption. Do not install every logical store or assume that a vector index, relational store and OLAP cube are interchangeable.
Provider and evaluation evidence
The research catalogue separates documentation, successful bounded public reads, credential-blocked integration and simulated adapters. It retains official URLs, supporting sections, source dates, measured variables, protocols, access and reuse limits. The local AI evaluation uses a small synthetic set with exact expected fields, missing values, ambiguous units and corrected evidence. It reports field correctness and unresolved review work rather than a successful network response. Representative Sinhala or Tamil evaluation remains dependent on an appropriate reviewed corpus. No private document is transmitted to an AI provider by this prototype.
Synthetic Polonnaruwa calculation results
Reporting years end in August. Maha is attributed to its ending year and Yala to that same year; the weather interval runs from September of the preceding year through August. This is an explicit demonstration policy based on the documented season boundaries, not an approved institutional reporting rule. The synthetic grid weights are 0.25 and 0.75.
Reporting year 2023 (2022-09-01 to 2023-08-31): category areas A: 100; B: 60 ha; gross seasonal cultivated area 160 ha; area-weighted annual rainfall 1300 mm; temperature 28.5 degrees C. Unique physical land area is unavailable without plot/overlap evidence.
Reporting year 2024 (2023-09-01 to 2024-08-31): category areas A: 120; B: 80 ha; gross seasonal cultivated area 200 ha; area-weighted annual rainfall 1500 mm; temperature 29.5 degrees C. Unique physical land area is unavailable without plot/overlap evidence.
The 2023 rainfall calculation is 0.25 × 1,000 + 0.75 × 1,400 = 1,300 mm. Temperature is 0.25 × 27 + 0.75 × 29 = 28.5 degrees C because the two grid summaries cover the same full reporting interval. The 2024 figures use the corresponding complete 366-day interval. These weather values are calculated once before joining the category summaries.
A rerun after correction creates a new source/method snapshot and preserves the original manifest. The ordinary report wizard exposes missing weather coverage, incompatible periods, repeated categories, restricted sources and ambiguous meanings as failures rather than plausible numbers. Exact manifest fields and rows are supplied in the downloadable worked example.
Research and integration catalogue
The following are documented, replaceable examples. Source permissions, regional variants, calibration, siting, local network compatibility and operational acceptance must be confirmed before use. The controlled JSON catalogue supplies the full variable, accuracy, protocol, equipment, access and evidence records.
ClimaVue 50 G2, item 43314
Exact model and configuration: ClimaVue 50 G2, item 43314
Manufacturer: Campbell Scientific
Classification: Compact weather sensor; not a complete Internet station
Measured variables
Air temperature (°C): ±0.6 °C. Published measuring range −50 to +60 °C; siting and radiation correction apply. Sources: ARC-S01; ARC-S43; ARC-S44.
Rain accumulation/rate (mm / mm/h): ±5% of measurement. 0–1, 000 mm/h accuracy band; measurement range to 1, 500 mm/h. Liquid precipitation only. Sources: ARC-S01; ARC-S43; ARC-S44.
Relative humidity (%RH): ±2.5% RH typical on current product page. Temperature/humidity dependent; older indexed manual states ±3% RH typical. Supplier must resolve revision. Sources: ARC-S01; ARC-S43; ARC-S44.
Barometric pressure (hPa): ±0.1 hPa at −10 to +50 °C; ±0.5 hPa at −40 to +60 °C on current page. Older indexed manual states ±5 hPa at 25 °C. Do not combine these as equivalent specifications. Sources: ARC-S01; ARC-S43; ARC-S44.
Wind speed (m/s): 0.3 m/s or 6%, whichever is greater. Published range 0–60 m/s; site exposure applies. Sources: ARC-S01; ARC-S43; ARC-S44.
Wind direction (degrees): ±5°. Published 0–359° range; orientation must be recorded. Sources: ARC-S01; ARC-S43; ARC-S44.
Solar radiation (W/m²): ±5% of measurement, typical. Published 0–1, 750 W/m² range; keep sensor level. Sources: ARC-S01; ARC-S43; ARC-S44.
Vapour pressure (kPa): ±0.2 kPa typical below 40 °C. Calculated from temperature/humidity; accuracy varies with both. Sources: ARC-S01; ARC-S43; ARC-S44.
Tilt (degrees): ±1°. Published 0–180° range; supporting instrument-health variable. Sources: ARC-S01; ARC-S43; ARC-S44.
Lightning strike count (strikes): >25% detection at distances under 10 km, typical. Detection varies with distance; not warning authority. Sources: ARC-S01; ARC-S43; ARC-S44.
Lightning average distance (km): Variable; no fixed accuracy adopted. Published 0–40 km range and 3 km resolution. Sources: ARC-S01; ARC-S43; ARC-S44.
Precipitation electrical conductivity (Not confirmed in reviewed specification extract): Not confirmed. Listed among measurements; obtain exact field/unit/method before enabling mapping. Sources: ARC-S01; ARC-S43; ARC-S44.
Accuracy: Temperature ±0.6 °C; rain ±5% at 0–1, 000 mm/h. Variable-specific conditions and the RH/pressure document discrepancy are listed below. Supplier confirmation is required before procurement or scientific use.
Protocol: SDI-12. Overview identifies an eight-pin M12 connector; the specification also uses AQ terminology. Confirm the delivered cable/connector and compatible logger.
Equipment: Compatible SDI-12 logger. Aspen10 is documented; mounting, power and permitted network are separate components.
Power: 3.6–15 V DC. At 12 V: 1.0 mA average using R7! every 10 s; 0.4 mA every 60 s or slower; peak 33 mA. Size logger, modem and power reserve separately.
Connectivity: Logger/edge uplink. No direct sensor web API established.
Maintenance: Check tilt/level and funnel contamination; retain service/calibration record.
Data access: Authorised logger export/adapter into common intake.
Restrictions: No heated solid-precipitation capability. Product/manual discrepancies need supplier resolution. Lightning detection is not an authorised hazard warning.
Local uncertainties: Local availability, scientific approval, installation design, radio/network suitability and institutional acceptance remain unverified.
Downstream use: Weather observations and coverage-aware Expert Hub comparisons.
Source date: 2026-11-02
Status: Optional extension; researched documentation only
Cost category: Current local quotation and lifetime operating cost not established.
Sources: ARC-S01; ARC-S43; ARC-S44
WXT536 within WXT530 series
Exact model and configuration: WXT536 within WXT530 series
Manufacturer: Vaisala
Classification: Weather transmitter; logger,power and communication unit separate
Measured variables
Temperature (°C): ±0.3 °C at +20 °C for the sensor element. Naturally aspirated shield can affect readings in calm wind. Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40.
Relative humidity (%RH): ±3% RH at 0–90% RH; ±5% RH at 90–100% RH. Sensor-element specification; natural aspiration caveat applies. Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40.
Pressure (hPa): ±0.5 hPa at 0 to +30 °C; ±1 hPa at −52 to +60 °C. Specified for 600–1, 100 hPa. Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40.
Rain accumulation/intensity (mm / mm/h): Better than 5% for daily accumulation, weather dependent. Liquid precipitation; excludes wind-induced error. Totals are cumulative since reset. Intensity range 0–200 mm/h, wider with reduced accuracy. Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40.
Wind speed (m/s): ±3% at 10 m/s. Observation range 0–60 m/s. Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40.
Wind direction (degrees): ±3° at 10 m/s. Averaging interval and sampling rate are configurable. Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40.
Hail detection/intensity (hits/cm² / hits/(cm²·h)): No fixed hail accuracy adopted. Manufacturer reports hail-hit outputs; do not convert these to rainfall volume. Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40.
Accuracy: Element temperature ±0.3°C at20°C; wind±3% at10m/s; daily rain better than5%, weather-dependent, excluding wind-induced error. Calm-weather natural aspiration affects field equivalence.
Protocol: SDI-12, ASCII automatic/polled, NMEA 0183 with query option, or Modbus RTU; configurable RS-232/485/422 or SDI-12 interfaces. Confirm ordered mode and wiring.
Equipment: Compatible logger, mast, power and uplink. AWS810/DMU801 is one documented station context.
Power: 5–32 V DC power-up per M211840EN-G. Current consumption depends on mode, interface and intervals; optional heating requires a separately checked power budget.
Connectivity: Serial/logger boundary is not an Internet API.
Maintenance: Inspect siting, shield and precipitation surface; retain service/calibration.
Data access: Authorised logging adapter; not connected in prototype.
Restrictions: Solar radiation is not included in this standard variable bundle. Rain totals have reset semantics.
Local uncertainties: Local availability, scientific approval, installation design, radio/network suitability and institutional acceptance remain unverified.
Downstream use: Weather datastreams and explicitly weighted area comparisons.
Source date: 2026-11-02
Status: Optional extension; researched documentation only
Cost category: Current local quotation and lifetime operating cost not established.
Sources: ARC-S02; ARC-S03; ARC-S04; ARC-S40
Davis Instruments DEV-03
Exact model and configuration: Wireless Vantage Pro2 6323M metric sensor suite with 24-hour fan-aspirated shield
Manufacturer: Davis Instruments
Classification: Wireless sensor suite plus separate gateway/service
Measured variables
Outside temperature (°C): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S05; ARC-S06; ARC-S07; ARC-S08; ARC-S13; ARC-S15.
Outside humidity (%RH): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S05; ARC-S06; ARC-S07; ARC-S08; ARC-S13; ARC-S15.
Wind speed/direction (m/s / degrees): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S05; ARC-S06; ARC-S07; ARC-S08; ARC-S13; ARC-S15.
Rain accumulation (mm): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S05; ARC-S06; ARC-S07; ARC-S08; ARC-S13; ARC-S15.
Accuracy: Manufacturer-linked family sheet: outside temperature ±0.5 °C typical; rain ±3% or one 0.2 mm tip up to 250 mm/h. Confirm these against the current exact regional SKU. Unlisted per-variable tolerances are not adopted.
Protocol: Compatible Davis wireless receiver, then authorised WeatherLink v2 API.
Equipment: WeatherLink Live 6100 or another compatible receiver, router, separate gateway power and mounting. UV, solar, soil and leaf sensors are optional.
Power: Suite solar/battery; gateway has separate supply; fan backup and servicing add operating requirements.
Connectivity: WeatherLink Live Wi-Fi/Ethernet. Local app cadence differs from cloud/API.
Maintenance: Clean gauge/shield; inspect fan, batteries, alignment using current manual.
Data access: Owned/shared eligible account and protected API key/secret; subscription controls history.
Restrictions: Verify metric/US order, regional radio band and entitlement. Public webpage is not API permission.
Local uncertainties: Local availability, scientific approval, installation design, radio/network suitability and institutional acceptance remain unverified.
Downstream use: Station observations retaining packet, unit, time; not automatic district coverage.
Source date: 2026-11-02
Status: Optional extension; credential-blocked integration
Cost category: Current local quotation and lifetime operating cost not established.
Sources: ARC-S05; ARC-S06; ARC-S07; ARC-S08; ARC-S13; ARC-S15
TEROS 12 with compatible ZL6 logger option
Exact model and configuration: TEROS 12 with compatible ZL6 logger option
Manufacturer: METER Group
Classification: Soil sensor; logger/gateway separate
Measured variables
Volumetric water content (m³/m³): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S09.
Temperature (°C): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S09.
Bulk electrical conductivity (µS/cm): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S09.
Accuracy: VWC ±0.03 m³/m³, typical in mineral soils with solution EC below 8, 000 µS/cm; medium-specific calibration ±0.01–0.02. Temperature ±1 °C from −40 to 0 °C and ±0.5 °C from 0 to +60 °C. Bulk EC ±(5% + 10 µS/cm) from 0–10, 000; ±8% from 10, 000–20, 000 µS/cm.
Protocol: DDI serial or SDI-12
Equipment: ZL6, EM60, Em50 or another compatible 4–15 V DC serial/SDI-12 logger. Retain depth and location metadata.
Power: 4–15VDC sensor; logger/uplink power separate.
Connectivity: Sensor cable to logger; connected logger/cloud entitlement separately verified.
Maintenance: Ensure soil contact, depth and calibration; verification clip or medium-specific calibration as justified.
Data access: Authorised logger file/API after provider contract verification.
Restrictions: BulkEC is not pore-waterEC or laboratory extractEC. Depth/deployment affect meaning.
Local uncertainties: Local availability, scientific approval, installation design, radio/network suitability and institutional acceptance remain unverified.
Downstream use: Soil observations, definition-evolution example and land-management evidence.
Source date: 2026-11-02
Status: Optional extension; researched documentation only
Cost category: Current local quotation and lifetime operating cost not established.
Sources: ARC-S09
OTT HydroMet DEV-05
Exact model and configuration: ecoLog 1000 SKU 5545000190-10UC, 0–10 m, 26 Ah, conductivity-equipped LTE-M example
Manufacturer: OTT HydroMet
Classification: Pressure/temperature/conductivity logger with cellular modem
Measured variables
Pressure-derived water level (m relative to declared datum): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S10; ARC-S11; ARC-S12.
Temperature (°C): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S10; ARC-S11; ARC-S12.
Conductivity (µS/cm or mS/cm): See the device accuracy conditions; any unlisted variable-specific tolerance must be confirmed.. Use the exact manufacturer revision and ordered variant; no local deployment validation has been completed. Sources: ARC-S10; ARC-S11; ARC-S12.
Accuracy: Pressure±0.05%FS; temperature±0.1°C. EC±0.5%(minimum1µS/cm) at5–2000µS/cm; ±1.5%(minimum0.01mS/cm) at0.1–100mS/cm; EC calibration5–45°C.
Protocol: Listed HTTPS/TLS1.2, HTTP, FTP/FTPS, MQTT/MQTTS; BLE service.
Equipment: Correct modem/SIM/antenna, probe/cable, mounting, water-level datum and authorised receiving endpoint.
Power: 3.6 V, 26 Ah lithium battery for the researched option. Life depends on sampling, transmission, temperature and conductivity operation.
Connectivity: The 10UC example uses LTE-M. Family EU 4G/2G variants differ; suitability for a local mobile network is unverified.
Maintenance: Inspect pressure datum/vent, fouling, calibration and battery; current regional manual required.
Data access: Authorised IP/file adapter only; real device not configured.
Restrictions: 10U lacks conductivity; 10UC includes it. Do not generalise across family variants.
Local uncertainties: Local availability, scientific approval, installation design, radio/network suitability and institutional acceptance remain unverified.
Downstream use: Water-level/quality observations. Reservoir volume requires reviewed level-volume relationship.
Source date: 2026-11-02
Status: Optional extension; official documentation partly available, no device test
Cost category: Current local quotation and lifetime operating cost not established.
Sources: ARC-S10; ARC-S11; ARC-S12
WeatherLink v2 authorised station data
Type: Station observations through provider cloud
Variables: Configured sensor-type weather fields
Source date: 2026-11-02
Status: Credential-blocked integration
Endpoint example: GET https://api.weatherlink.com/v2/current/{station-id}?api-key={server-side-key}
Coverage: Entitled owned/shared/qualifying stations only
Time coverage: History depends on entitlement. Unix timestamps mark the archive interval end; the historic API selects (start, end]. Preserve the source interval and timezone.
Latency: Basic 15-minute current, Pro 5-minute, Pro+ most recent for WeatherLink Live
Authentication: api-key query and X-Api-Secret header; protected server-side adapter
Licensing: Station relationship, subscription and redistribution permission required
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: station_id, sensors, sensor_type, data_structure_type, lsid, ts and sensor-specific data
Units: Preserve native units and map from exact sensor catalogue/data structure
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: 1000calls/hour, 10/second; history window≤86400seconds
Sources: ARC-S13; ARC-S14; ARC-S15; ARC-S16; ARC-S17; ARC-S39
Sri Lankan Weather Advisory System JSON
Type: Official issued warnings/advisories
Variables: Level, areas, language, validity, publication
Source date: 2026-11-02
Status: Credential-blocked integration
Endpoint example: GET https://was.meteo.gov.lk/api/warnings/changes?since={server-cursor}&lang=en
Coverage: Sri Lanka issued warning areas; not station coverage
Time coverage: Current and cursor changes; complete archive unverified
Latency: About60s changes polling recommended; no SLA
Authentication: X-API-Key; not obtained or used
Licensing: Read-only warning feed; preserve issuer/terms
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: id, day_key, name, level, valid_from, valid_to, summary_en/si/ta, areas_en, published_at; changes since
Units: Offset timestamps; no measured weather unit implied
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: 401invalidkey, 400since/lang, 429ratelimit. Retain returned server cursor; never fabricate a newer cursor.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: 120requests/60s; limit1–200(default50)
Sources: ARC-S18
Sri Lankan Weather Advisory System CAP/RSS
Type: Official warning metadata and CAP1.2 XML
Variables: Alert identity, area, validity, language
Source date: 2026-11-02
Status: Successfully tested public read
Endpoint example: GET https://was.meteo.gov.lk/cap/en/rss.xml
Coverage: Sri Lanka warning areas
Time coverage: Active warnings; full archive not established
Latency: Provider issue/expiry distinct from fetch cadence
Authentication: Documented CAP/RSS requires no key
Licensing: Preserve issuing authority; review terms
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: RSS linking CAP1.2 XML resources
Units: Official event/area/timestamps
Pagination: Follow only authorised CAP links; retain replacements/cancellations.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: Rate limited; confirm CAP-specific service policy
Sources: ARC-S18
Open-Meteo forecast
Type: Gridded weather-model forecast
Variables: temperature_2m, precipitation and selected variables
Source date: 2026-11-02
Status: Successfully tested public read
Endpoint example: GET https://api.open-meteo.com/v1/forecast?latitude=52.52&longitude=13.41&hourly=temperature_2m,precipitation&forecast_days=1&timezone=UTC
Coverage: Global model grid; resolution depends on product
Time coverage: Normally7days; up to16days per product
Latency: Model-run dependent; no operational latency commitment
Authentication: Keyless public evaluation; customer endpoint/plan separately authorised
Licensing: Weather data is CC BY 4.0 with attribution and modification notices. The free API service is non-commercial; commercial service use requires a suitable subscription.
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: hourly.time, value arrays, hourly_units, grid coordinates, timezone
Units: Tested temperature_2m°C, precipitationmm
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: Evaluation tier documented; production/commercial plan not selected.
Limits: Free600/min, 5000/hour, 10000/day, 300000/month at check date
Sources: ARC-S19; ARC-S21
Open-Meteo historical weather
Type: Gridded reanalysis/historical model
Variables: temperature_2m, precipitation and selected hourly measures
Source date: 2026-11-02
Status: Researched documentation; adapter simulated
Endpoint example: GET https://archive-api.open-meteo.com/v1/archive?latitude=7.9&longitude=81.0&start_date=2020-01-01&end_date=2020-01-02&hourly=temperature_2m,precipitation&models=era5&timezone=UTC
Coverage: ERA5/ERA5-Land/IFS distinct grids
Time coverage: ERA5from1940; ERA5-Landfrom1950; IFSfrom2017
Latency: Historical release/product-dependent
Authentication: Evaluation or licensed route as applicable
Licensing: Retain CC BY 4.0 attribution and product-specific provenance. Commercial historical API access requires Professional or higher at the checked date; no plan is selected.
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: Time/value arrays, units; pin product/model
Units: Use returned units and interval meaning
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: Bound ranges/variables and confirm account limits
Sources: ARC-S20; ARC-S21
NASA POWER Hourly
Type: Gridded assimilation/satellite-derived analysis
Variables: T2M and selected solar/meteorology
Source date: 2026-11-02
Status: Successfully tested public read
Endpoint example: GET https://power.larc.nasa.gov/api/temporal/hourly/point?parameters=T2M&community=SB&longitude=0&latitude=0&start=20170101&end=20170102&format=JSON&time-standard=UTC
Coverage: Native source grid point/regional product; not station observations
Time coverage: Hourlyfrom2001-01-01 to near-real-time
Latency: Source/parameter dependent
Authentication: Public unauthenticated read tested
Licensing: Preserve NASA source attribution and exact dataset terms
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: properties.parameter byvariable/hour; header and parameters
Units: Community/parameter-specific; testedT2M C; explicitUTC
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: At most15parameters/request; bounded windows
Sources: ARC-S22; ARC-S23
Irrigation Department authorised exchange
Type: Institutional water records/publications
Variables: Reservoir/rain/river data only after dataset agreement
Source date: 2026-11-02
Status: Researched source catalogue; operational adapter unavailable
Endpoint example: No verified public observation API;catalogue https://www.irrigation.gov.lk/web/index.php?lang=en
Coverage: Named stations/assets/basins; exact roster/version required
Time coverage: Dataset-specific
Latency: Owner update policy unconfirmed
Authentication: Operational feed access unknown; no credentials used
Licensing: Custodian use/redistribution agreement required
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: Obtain approved file/API contract; retain asset/table/row/period
Units: Declared water-level datum, m³ or approved capacity unit, rainmm; gross/effective capacity separate
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: Observation API/rate/size contract not established
Sources: ARC-S24
NSDI spatial metadata/services
Type: Institution-owned GIS services via catalogue
Variables: Permitted layer descriptions/places/geometries
Source date: 2026-11-02
Status: Researched documentation; endpoint not tested
Endpoint example: GET https://gisapps.nsdi.gov.lk/server/services/SLNSDI/Locations/MapServer/WMSServer?SERVICE=WMS&VERSION=1.3.0&REQUEST=GetCapabilities
Coverage: Layer extent, CRS, boundary edition, original scale
Time coverage: Layer version/validity
Latency: Owner-defined refresh
Authentication: Per-service access; discovery is not open feature permission
Licensing: Free/commercial datasets; owner approval
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: WMS1.3.0 capabilities documented; feature API only if separately authorised
Units: Layer CRS axes, scale and measurement semantics
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: Per-service limits unverified; boundedBBOX/CRS
Sources: ARC-S25; ARC-S26; ARC-S38
DCS Paddy Statistics
Type: Official periodic tables
Variables: Sown/harvested area, yield, production
Source date: 2026-11-02
Status: Researched documentation; table-import adapter simulated
Endpoint example: Catalogue https://www.statistics.gov.lk/Agriculture/%20StaticalInformation/PaddyStatistics
Coverage: Published district/season/irrigation grain; variety breakdown not inferred
Time coverage: Maha cross-year, Yala; exact revised release
Latency: Seasonal publication and revision
Authentication: Public table documents; no API claim
Licensing: Confirm exact release rights
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: Season, district, area meaning, unit, extent, yield, production, release
Units: Metric/imperial separate; ha, t/ha, t only when table specifies
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: Complete deterministic table parsing
Sources: ARC-S27
DOA SEPC / Agstat
Type: Official agriculture publications
Variables: Agstat, cultivation cost, crop forecasts, budgets
Source date: 2026-11-02
Status: Researched documentation; document-import fallback
Endpoint example: Catalogue https://doa.gov.lk/sepc-downloads_en/
Coverage: Publication-specific geographic grain
Time coverage: Periodic editions
Latency: Publication schedule; not real-time
Authentication: Public catalogue; API discovery unreadable, so no routes inferred
Licensing: Edition/rights need custodian review
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: Table/page/schema contract; no undocumented API
Units: Table-specific unit, season, crop meaning
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: Parse all rows deterministically
Sources: ARC-S28
DMC official warning documents
Type: Issued bulletins/withdrawals
Variables: Issuer, issue/validity, area, replacement
Source date: 2026-11-02
Status: Researched documentation; manual/reference fallback
Endpoint example: Catalogue https://www.dmc.gov.lk/index.php?Itemid=279&lang=en&option=com_dmcreports&report_type_id=8&view=reports
Coverage: Named basins/areas in bulletin
Time coverage: Dated notices; complete archive not guaranteed
Latency: Issue time; no polling SLA
Authentication: Public document list; no API inferred
Licensing: Preserve issuer; automation/reproduction rights reviewed
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: Document with exact page and metadata
Units: Source-issued warning classifications; no sensor-derived authority
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: Bounded catalogue checks
Sources: ARC-S29
LUPPD authorised land-use release
Type: Custodian spatial/statistical release
Variables: Land-use classes, coverage, planning definitions
Source date: 2026-11-02
Status: External institutional dependency; current interface unavailable
Endpoint example: No verified endpoint;retain existing LUPPD source identity and approved file/manual fallback
Coverage: Official coverage/geometry/class release unconfirmed
Time coverage: Release-specific
Latency: Unconfirmed
Authentication: Custodian agreement; no verified public API
Licensing: Rights and exact release unconfirmed
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: Reuse authorised GIS/file intake; retain institutional claims
Units: Owner-declaredCRS, area unit, categorical meaning
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: No machine contract verified
Sources: No verified current interface reference; institutional confirmation required.
CEA water-quality institutional source
Type: Official laboratory reports and environmental data catalogue
Variables: Approved sample parameters, laboratory method and results; exact released table required
Source date: 2026-11-02
Status: Researched official source; authorised report/file fallback
Endpoint example: Catalogue https://cea.lk/web/en/2013-05-07-07-51-07/environmental-pollution-contorl-division/water-quality-unit
Coverage: Named water bodies/sites and sample locations; no project-area coverage inferred
Time coverage: Release/sample-specific; complete archive not established
Latency: Owner publication or authorised exchange schedule
Authentication: Public service catalogue; restricted records require custodian agreement
Licensing: Exact dataset and reuse rights unconfirmed; some laboratory/project services commercial
Permissions: Source owner and intended audience must authorise use; no blanket redistribution claim.
Schema: Source report/table, sample identity, location, depth, time, method, result, unit and qualifier
Units: Parameter- and method-specific; retain detection limits and censored values
Pagination: Provider-specific bounded pages/windows; retain cursor, overlap and replay-safe source key.
Error handling: Validate HTTP/schema; retain rejected evidence. Bounded backoff, quarantine/failure queue, resumable watermark and deduplication. Missing delivery is not zero.
Freshness: Keep phenomenon period, provider issue time, receipt and last successful fetch separately; show stale coverage.
Cost category: No price adopted; institutional/service cost and procurement remain unconfirmed.
Limits: No public observation API contract established
Sources: ARC-S41; ARC-S42
Complete source locators and provider options
Official device, data-provider, OGC, dimensional-modelling, earth-observation and OpenAI references are retained in the architecture research catalogue with exact supporting passages and verification dates. They supplement the retained calculation source register without changing its historical identities. Open https://sharedproto.wkslabs.com/reviews/dashboard-portfolio-20261027/system-diagrams/#data-ai
ARC-S01 Campbell Scientific ClimaVue 50 G2
https://www.campbellsci.com/products/climavue50-g2 Overview and Specifications: supply, Air Temperature, Wind Speed, Precipitation SDI-12; compatible Aspen10/loggers; 3.6–15VDC; temperature±0.6°C; wind max(0.3m/s, 6%); rain±5% at0–1000mm/h. Liquid precipitation and stated siting/operating conditions. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S02 Vaisala WXT536 station context
https://docs.vaisala.com/r/M212902EN-G/en-US/GUID-E6912022-5F36-44DF-90CA-2721236D948C Vaisala Weather Transmitter WXT536 WXT536 is a transmitter within a complete station. Power, logger and communications are separate responsibilities. Version: M212902EN-G. Checked: 2026-11-02. Status: Researched documentation
ARC-S03 Vaisala WXT536 specifications
https://docs.vaisala.com/r/M212902EN-G/en-US/GUID-AD3DAFAA-7537-453B-969B-B3229E311DD7 Measurement tables and footnotes1, 2, 5, 7 Temperature sensor element±0.3°C at20°C; wind±3% at10m/s; daily rain better than5%, weather-dependent, excluding wind-induced error. Natural aspiration affects calm-weather readings. Version: M212902EN-G. Checked: 2026-11-02. Status: Researched documentation
ARC-S04 Vaisala configurable WXT530
https://store.vaisala.com/en/products/WXT530 Digital outputs and WXT536 variant Official indexed catalogue lists SDI-12, RS-232, RS-485, RS-422. Page body unreadable; confirm exact power, heater, protocol and order bundle. Version: Current configurable family. Checked: 2026-11-02. Status: Official source partly readable
ARC-S05 Davis Vantage Pro2 fan-aspirated suite
https://www.davisinstruments.com/products/wireless-vantage-pro2-iss-with-24-hr-fan-aspirated-radiation-shield Product title and Highlights Listed6323/6323M; outside temperature/RH, wind, rain; solar/battery. WeatherLinkLive6100 is optional. UV, solar-radiation and soil/leaf sensors are additional options. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S06 Davis WeatherLink Live
https://www.davisinstruments.com/pages/weatherlink-live Live Data; Wi-Fi and Ethernet; compatible stations Separate compatible wireless gateway with Wi-Fi/Ethernet uplink. Local same-network app cadence differs from cloud API permissions. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S07 Davis wireless family specification
https://cdn.shopify.com/s/files/1/0515/5992/3873/files/6152_6162_6153_6163_Spec_SheetFF__Web.pdf?v=1661460993 Printed pp1, 5, 6, 8: rain tip, rainfall, outside temperature, wind Metric tip0.2mm; rain total±3% or one tip up to250mm/h; outside temperature±0.5°C typical. Family sheet is not proof of unchanged current regional SKU. Version: Manufacturer-linked historical family sheet. Checked: 2026-11-02. Status: Researched documentation
ARC-S08 Davis fan-aspirated ISS addendum
https://cdn.shopify.com/s/files/1/0515/5992/3873/files/VP2_Fan_Aspirated_ISS_Rev_C.pdf Printed p7 Fan-Aspirated Shield Specifications; maintenance Solar-powered fan, backup cells and cleaning/service requirements. Reconcile historical manual with current purchased hardware. Version: RevC22March2006. Checked: 2026-11-02. Status: Researched documentation
ARC-S09 METER TEROS12
https://metergroup.com/products/teros-12/ Measurement, Communication, Electrical Specifications VWC, temperature, bulkEC; DDI/SDI-12; 4–15VDC; compatibleZL6/EM60/Em50. Generic mineral-soilVWC±0.03m³/m³ when solutionEC<8000µS/cm; medium calibration±0.01–0.02. BulkEC is not laboratory/pore-waterEC. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S10 OTT ecoLog1000 conductivity SKU
https://www.ott.com/products/5545000190-10uc Product title and Technical Attributes 5545000190-10UC:0–10m, 26Ah, conductivity, LTE-M. Pressure±0.05%FS; temperature±0.1°C; EC conditions vary. Later full-page reads timed out; official indexed specifications retained. Version: Exact10UC variant. Checked: 2026-11-02. Status: Official documentation partly available; no device test
ARC-S11 OTT ecoLog1000 instructions
https://www.ott.com/download/operating-instructions-groundwater-datalogger-ott-ecolog-1000-5/ Section2.2 USA variant table Indexed manufacturer manual distinguishes10U from conductivity10UC, LTE-M. Current download redirects; obtain current regional manual before purchase. Version: Indexed manual; direct download unresolved. Checked: 2026-11-02. Status: Current direct download unavailable
ARC-S12 OTT ecoLog1000 data sheet
https://www.ott.com/products/download/data-sheet-ott-ecolog-1000-en/ Communications, measured values, power Indexed sheet distinguishes EU4G/2G and globalLTE-M. Conductivity optional at family level. Current link redirects to general resources. Version: Indexed sheet; current link redirects. Checked: 2026-11-02. Status: Current direct download unavailable
ARC-S13 WeatherLinkv2 introduction
https://weatherlink.github.io/v2-api/ Station access criteria Ownership, owner-share or qualifying upgrade determines access. Public visibility does not grant unrestricted observation API access. Version: WeatherLinkv2. Checked: 2026-11-02. Status: Researched documentation
ARC-S14 WeatherLink authentication
https://weatherlink.github.io/v2-api/authentication API Key; API Secret api-key query parameter and X-Api-Secret header. Connector keeps credentials server-side and redacts URL logs. Version: WeatherLinkv2 current authentication. Checked: 2026-11-02. Status: Researched documentation
ARC-S15 WeatherLink data permissions
https://weatherlink.github.io/v2-api/data-permissions WeatherLink Console/Live table Basic 15-minute current records, no history; Pro 5-minute current and history; Pro+latest/history, subject to station relationship. Version: WeatherLinkv2. Checked: 2026-11-02. Status: Researched documentation
ARC-S16 WeatherLink rate limits
https://weatherlink.github.io/v2-api/rate-limits Default rate limits 1000calls/hour and10calls/second per API key. Version: WeatherLinkv2. Checked: 2026-11-02. Status: Researched documentation
ARC-S17 WeatherLink size limits
https://weatherlink.github.io/v2-api/size-limits Historic windows Starting/ending Unix timestamps; historic request window at most86400seconds. Version: WeatherLinkv2. Checked: 2026-11-02. Status: Researched documentation
ARC-S18 Sri Lankan Weather Advisory System
https://was.meteo.gov.lk/api-docs Authentication; Warnings; Changes; Timestamps; CAP/RSS; Errors KeyedJSON warnings vs keylessCAP1.2/RSS; en/si/ta; 120requests/60s; limit1–200(default50); changes uses returned since cursor. This is an issued warning feed, not a station API. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S19 Open-Meteo forecast API
https://open-meteo.com/en/docs Weather Forecast API; hourly variables; response Gridded model forecast arrays with timestamps and units; retain product/run, resolution and interval. Not physical station observations. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S20 Open-Meteo historical weather
https://open-meteo.com/en/docs/historical-weather-api Historical Weather introduction/data sources ERA5from1940 at0.25°, ERA5-Landfrom1950 at0.1°, IFSfrom2017 at9km. Use consistent product for comparisons; coordinate is not district coverage. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S21 Open-Meteo access terms
https://open-meteo.com/en/pricing Free/Open Access table; FAQ Free API is non-commercial: 600/minute, 5,000/hour, 10,000/day, 300,000/month. Paid customer access differs; historical APIs require Professional or higher. Data is CC BY 4.0 with attribution; this differs from API-service terms. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S22 NASA POWER Hourly API
https://power.larc.nasa.gov/docs/services/api/temporal/hourly/ Formats; Time Standards; Limitations; Point examples Hourlyfrom2001; at most15parameters/request; UTC or defaultLocalSolarTime. FormatsJSON/CSV/NetCDF. Nativeparameter/community units. LST is not Sri Lankan civil time. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S23 NASA POWER data sources
https://power.larc.nasa.gov/docs/faqs/data/ Sources; Units; Latency Solar is satellite-informed modeled data; meteorology derives fromMERRA-2/GEOS-ITassimilation. Preserve source grid/resolution. Not station observations. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S24 Sri Lanka Irrigation Department
https://www.irrigation.gov.lk/web/index.php?lang=en Water Management; Hydrology; Publications; Flood Warning Official water/irrigation source discovery. Homepage does not establish public observation API, automated reuse rights or update SLA. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S25 Sri Lanka NSDI Geoportal
https://www.nsdi.gov.lk/geoportal Geoportal description Official spatial metadata/service discovery; per-layer authority, scale, rights and versions remain necessary. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S26 Sri Lanka NSDI FAQ
https://www.nsdi.gov.lk/faq Availability; publishing prerequisites Free and commercial datasets coexist; publishing links requires registration/institutionalMOU. Discovery is not blanket redistribution permission. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S27 DCS Paddy Statistics
https://www.statistics.gov.lk/Agriculture/%20StaticalInformation/PaddyStatistics Paddy Statistics definitions; tables; revision note MahaSep–Marfollowingyear; YalaApr–Aug. Asweddumized, sown, harvested differ. Production uses harvestedarea×crop-cuttingyield. Preserve revised releases; district totals do not imply variety breakdown. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S28 DOA SEPC downloads
https://doa.gov.lk/sepc-downloads_en/ Agstat, cost-of-cultivation, crop-forecast categories Official periodic agriculture/weather/paddy publications. Preserve edition, page/table, units/periods. Public API and redistribution licence not established. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S29 DMC flood warnings
https://www.dmc.gov.lk/index.php?Itemid=279&lang=en&option=com_dmcreports&report_type_id=8&view=reports Flood Warning and withdrawal notices Official bulletins/withdrawals. Preserve issuer, issue/validity, area and replacements; prototype thresholds cannot issue official warnings. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S30 OGC SensorThings Sensing1.1
https://docs.ogc.org/is/18-088/18-088.html Sections8.2.1–8.2.8; conformance Thing, Location/HistoricalLocation, Sensor, ObservedProperty, Datastream, Observation, FeatureOfInterest. A datastream has one sensor/property and units. Conceptual alignment is not certified conformance. Version: OGC18-088Version1.1; published2021-08-04. Checked: 2026-11-02. Status: Researched documentation
ARC-S31 Kimball declared grain
https://www.kimballgroup.com/data-warehouse-business-intelligence-resources/kimball-techniques/dimensional-modeling-techniques/grain/ Grain Declare what one fact row represents before choosing dimensions and facts. Grain is a binding design choice. Independent source aggregation before joining is the proposed architecture's application of this principle. Version: Author guidance. Checked: 2026-11-02. Status: Researched documentation
ARC-S32 Kimball stars and OLAP
https://www.kimballgroup.com/data-warehouse-business-intelligence-resources/kimball-techniques/dimensional-modeling-techniques/star-schema-olap-cube/ Star schemas and OLAP cubes Dimensional stars and multidimensional OLAP are analytical representations; retain grain and aggregation meaning. Version: Author guidance. Checked: 2026-11-02. Status: Researched documentation
ARC-S33 Open Data Cube
https://opendatacube.readthedocs.io/en/latest/ Overview; metadata; analysis; masking Gridded Earth-observation data/metadata across space, time, variable. CRS, mask, resolution and product definitions matter. Not a business approval ledger. Version: Latestdevelopmentdocsobserved1.9.23.dev65; pin chosen release. Checked: 2026-11-02. Status: Researched documentation
ARC-S34 OpenAI file inputs
https://developers.openai.com/api/docs/guides/file-inputs Input mechanisms; file-specific processing; spreadsheet augmentation; usage FileID, Base64 or URL inputs. PDFs include text/page images. Non-PDF embedded charts/images are not extracted. Spreadsheet processing uses first1000rows/sheet. Each file and combined request under50MB. Parse complete tables deterministically. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S35 OpenAI Structured Outputs
https://developers.openai.com/api/docs/guides/structured-outputs Supported schemas; edge cases; text.format JSON-Schema subset constrains shape. Responses text.format can usejson_schema/strict. Handle incomplete/refusal responses; schema conformity is not factual correctness. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S36 OpenAI File Search
https://developers.openai.com/api/docs/guides/tools-file-search File Search; results inclusion; metadata filtering Hosted vector-store retrieval with metadata filters/citations/results. Re-authorise current rights and versions before model context or result delivery. Search is not numerical authority. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S37 OpenAI data controls
https://developers.openai.com/api/docs/guides/your-data Endpoint retention; Responses; Files; residency Default abuse logs may retain content up to30days with exceptions. Response state, Files/vectorstores have distinct retention/deletion. Special retention/residency needs eligibility/configuration. No automatic zero-retention or Sri Lanka residency. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S38 NSDI Location WMS documentation
https://nsdi.gov.lk/location WMS GetCapabilities link ExactWMS1.3.0capabilityURL documented; no feature licence, completeness or service-availability inference. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S39 WeatherLink current and historic endpoint tutorial
https://weatherlink.github.io/v2-api/tutorial Steps 2–4; archive interval explanation Current endpoint and secret header verified. Historic records timestamp the interval end, with selection (start, end]; midnight can close the preceding day. Version: API v2 live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S40 WXT530 interfaces and option bundles
https://docs.vaisala.com/r/M211840EN-G/en-US/GUID-6B30C4BA-CEF6-40DF-9F60-41935D25AB9D Tables 1–2: features and available options Power-up 5–32 V DC; SDI-12, ASCII, NMEA 0183 and Modbus RTU protocols; RS-232/485/422 and SDI-12 interfaces. Heating and auxiliary inputs are configuration options. Version: M211840EN-G. Checked: 2026-11-02. Status: Researched documentation
ARC-S41 CEA laboratory services and surface-water source discovery
https://cea.lk/web/en/2013-05-07-07-51-07/environmental-pollution-contorl-division/water-quality-unit Water Quality Monitoring Unit; services; downloads Official laboratory services include inland water monitoring, analytical reports and a surface-water data download section. Some sample/project services are commercial. No public observation API is established here. Version: Official live documentation. Checked: 2026-11-02. Status: Researched documentation
ARC-S42 CEA selected inland water bodies
https://www.cea.lk/web/en/component/content/article?id=1801&layout=edit Ambient Water Quality Monitoring of Selected Major Inland Surface Water Bodies Lists Kelani River, Diyawanna Oya, Maha Oya, Bolgoda Lake and Benthara Ganga. This programme list does not establish local project coverage or an automated feed. Version: Page last updated 2025-01-09. Checked: 2026-11-02. Status: Researched documentation
ARC-S43 ClimaVue 50 G2 manual, specification discrepancy
https://s.campbellsci.com/documents/us/manuals/climavue50g2.pdf Section 6, specifications Search-indexed manual reports typical RH ±3% and pressure ±5 hPa at 25°C, differing from current product page/brochure specifications. Resolve hardware/revision-specific specification with supplier. Version: Official manual; indexed copy predates current product-page check. Checked: 2026-11-02. Status: Researched official indexed manual; revision confirmation required
ARC-S44 ClimaVue 50 G2 manufacturer brochure
https://s.campbellsci.com/documents/us/product-brochures/b_climavue50-g2-a4-branded.pdf Specification headings: pressure, wind, solar, precipitation, tilt and lightning Current indexed brochure supports product-page pressure, wind, solar and precipitation values. Reconcile delivered hardware and calibration certificate with the older manual. Version: Official product brochure; revision date unconfirmed. Checked: 2026-11-02. Status: Researched official indexed brochure
6 2 Land Use Change Decision Rules
DEC-DP01-001 uses method LAND-CHANGE-1. Help a land-use planner find important changes inside the project area, assess the evidence and choose the next investigation.
Inputs. Use a fixed analysis boundary inside each division. Keep the project portion separate from the full administrative division. The three prototype areas and their shapes are fictional.
Group | Required information |
|---|---|
Source and observation | Publisher, original URL or file, dataset release, observation year and season where relevant. Creation or revision years do not automatically identify the observation period. |
Area and classification | Division code, fixed analysis boundary and area in hectares, boundary version, native class/code, proposed class and mapping version, physical land area versus seasonal crop extent. |
Values and quality | Original area and unit, explicit missing value/reason, unclassified area, coverage, area method, representation, coordinate system, raster resolution and local quality reference. |
Formulas and units
Calculation | Definition | Unit |
|---|---|---|
Net change | Later area minus earlier area | ha |
Percentage change | 100 times net change divided by earlier area; unavailable when earlier area is zero | % |
Annual change | Net change divided by elapsed years; interval average, not a forecast | ha/year |
Gross loss and gain | Loss sums matched areas leaving a class. Gain sums matched areas entering it. Net equals gain minus loss | ha |
Converted extent | Sum matched areas whose from and to classes differ. Count each area once, rather than adding all class gains to losses | ha |
Unit conversion | One hectare is 10000 square metres. Retain the original value and unit alongside the converted value | ha |
Comparison and input rules
1. Compare matching analysis boundaries, class definitions, measure types, methods, seasons and source series. Both endpoints must cover the complete selected area; otherwise withhold whole-area change and transitions.
2. Class totals plus unclassified area must equal the fixed analysis area. A blank stays missing and zero stays a known zero. Do not invent a balancing value or join chart lines across missing points.
3. Keep native source categories and codes. A conflicting proposed category is rejected. An ambiguous native class stays unresolved with a mapping note and is excluded from analysis until its mapping is resolved.
4. Order divisions by the largest absolute net class-area change, or by the largest absolute percentage change. Show both metrics and the class used. Allow any change, decreases or increases. Exclude zero-baseline percentages from percentage sorting. Sorting does not set an action threshold.
5. Real gross losses, gains and conversions require matched spatial observations. Net area totals cannot establish where conversion occurred. The prototype constructs fictional parcel histories to demonstrate the rule; its generator is not a real conversion-estimation method.
6. Example annual inputs may update the in-page dataset only after structural and area-total checks. The charts, map images, transitions and exports use the same revised dataset. Official-source records and file selections remain previews and do not enter the example charts.
7. A decision example records the selected division, analysis scope, years, class, sorting rule, comparison, coverage, reason, next action, proposed responsible role, follow-up and dataset/boundary/class/method versions. Incompatible evidence forces a source-data check. Nothing is assigned or sent by the prototype.
Worked example using fictional data
Scope and period | Earlier forest ha | Later forest ha | Loss ha | Gain ha | Net ha |
|---|---|---|---|---|---|
Laggala Pallegama 2015 to 2019 | 6800 | 6782 | 26 | 8 | -18 |
All three examples 2015 to 2019 | 14900 | 14868 | 56 | 24 | -32 |
For Laggala Pallegama, net change is 6782 minus 6800 = -18 ha. Percentage change is 100 times -18 / 6800 = -0.2647%. Average annual change is -18 / 4 = -4.5 ha/year. Gross loss of 26 ha and gain of 8 ha reproduce the same -18 ha net change. These values do not establish actual project results.
The map images use fictional parcel histories with those same totals. Real transition areas must come from compatible dated spatial observations. The example generator is not a reconstruction procedure for real conversions.
Sources and method categories
Government publication - Sri Lanka National Spatial Data Infrastructure. Planning Cadastre Landuse and Forest Boundary service metadata. Landuse layer 4 native classifications; Forest Boundary layer 1 forest_type domain and coordinate system. Native labels, codes and spatial metadata. The inspected metadata does not establish a comparable annual project series.
Source: Open reference
Supporting reference: Open reference
Institution publication - Copernicus Global Land Service. CGLS LC100 Collection 3 version 3.0.1. 2015 to 2019 product and discrete classification definitions. Annual broad cover classes at nominal 100 m. Woody crops can enter tree or shrub classes; this source alone cannot split every detailed local land use.
Source: Open reference
Supporting reference: Open reference
Government publication - Department of Census and Statistics Sri Lanka. Paddy Statistics. District and Maha or Yala seasonal extent definitions. Seasonal crop context. Sown, harvested and asweddumized extents are not interchangeable with a physical land-cover map.
Source: Open reference
Institution publication - Intergovernmental Panel on Climate Change. 2006 Guidelines Volume 4 Chapter 3. Sections 3.3 and 3.5 consistent land representation, net versus gross change and uncertainty. Methodological context for matched land representation and transition accounting. This prototype is not a greenhouse-gas inventory.
Source: Open reference
Institution publication - UN Handbook on Remote Sensing for Agricultural Statistics. Chapter 8 Map Validation and Use of Maps for Area Estimation. Sections 8.1, 8.3 and 8.5; Gilberto Camara and Lorenzo De Simone. Reference sampling, accuracy assessment and area uncertainty. A global accuracy figure does not replace local validation.
Source: Open reference
Validation required - SHARED project proposal. LAND-CHANGE-1 local comparison and screening specification. This decision specification and its fictional worked example. Local class grouping, scope, sorting choices and intended use require confirmation in Institution review. Arithmetic, conversion, consistency and input handling are developer checks.
Source: Open reference
Published definitions and methodological guidance retain their publisher and locator. Local grouping, scope, sorting criteria and intended use remain project proposals. Record client and expert confirmation in Institution review only. Developer checks cover arithmetic, units, class conflicts, area closure, missing values and consistent output.
Acceptance. Apply scenarios LU A1 to LU A6 in SRS section 5 6. The 22 retained calculation/input checks and 14 purpose checks are prototype software evidence, not independent scientific or stakeholder acceptance.
6 3 Domain Decision Rules
Published formula verification. “Verified published formula” means its formula and transcription match the cited recognised publication. “Verified published component” covers only the named part. Source categories, publisher and exact locator remain visible. Local adaptations stay “Validation required”. Confirm local inputs, settings and intended use through Institution review.
DOMAIN-1 provides the remaining 819 decision contracts. LAND-CHANGE-1 retains the completed DEC-DP01-001 case. All 820 IDs, 57 family IDs and existing institution routes remain. The 101 domain variants below separate materially different meanings while reusing one concise interface.
For each decision, the controlled CSV and web register contain the question, required wider evidence, actual typed fields, units, method, published component or project rule, limits, responsible role and Institution review link. The review page and prototype example are generated from the same pure calculation component. They are illustrative records, not project findings.
Use a published method as published only for the supported component and stated input convention. Local source matching, thresholds, weights, safeguards, intended use and operational authority require confirmation where applicable. Missing source data is not scientific acceptance. Keep every existing client and expert decision pending in Institution review.
Common checks
Retain the actual observation period and analysis area. Validate finite numbers, counts, ranges and calendar dates. Keep missing and censored values explicit. Use compatible definitions, units and versions. Reconcile balances and cohort components. Do not invent a zero-denominator result, gap-filling value, balancing area, confidence interval, causal conclusion or legal/health determination.
Realistic examples and published observations
Use meaningful labels such as Bg 300, pepper exports, water-service zones and Laggala Pallegama. The rice grouped-count fixture remains 586 plots with a separate 804 ha area denominator. Its counts and variety allocation are illustrative. DCS and DOA publications support the crop/variety context, not those counts or institutional adoption.
DCS publishes paddy yields for the whole districts, not a Knuckles project baseline. In the all-schemes kg per net hectare column, Kandy is 2859 in 2024 Yala and 3761 in 2025 Yala; Matale is 4500 and 4302; Nuwara Eliya is 3905 and 3941. Retain each period and the net-hectare basis. Rounded production/area totals must not be used to reconstruct those published yield estimates. Seasonal differences do not establish a cause.
Sources: Department of Census and Statistics Sri Lanka, Paddy Statistics metric district tables for 2024 Yala and 2025 Yala, page 1, all-schemes average yield column. Government publication.
Explicit domain variants
Fragmentation
Total holding area / parcel count, alongside count and documented separation. This is a descriptive summary, not a validated fragmentation index or coordination decision. Result units: ha/parcel, parcels. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Decision bindings: DEC-DP01-012. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Land change
Net=later−earlier; percentage=100×net/earlier when earlier>0. Matched transitions must reproduce net=gain−loss. Net totals alone do not establish conversion. Result units: ha, %. Same boundary, definitions, observation basis and adequate map quality are required. Coverage changes and classification error are not proven land-use change. Example boundaries and transitions are fictional.
Decision bindings: DEC-DP01-013, DEC-DP07-001, DEC-DP12-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Erosion area
Category share = 100 × category amount / total compatible category amounts. HHI = sum of squared fractional shares, displayed on a 0–1 scale. Result units: ha, %. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Decision bindings: DEC-DP02-003. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Water productivity
Saleable crop output / Matching irrigation water input, for the same product, process and period. Result units: kg/m³.
Decision bindings: DEC-DP02-010, DEC-DP05-013, DEC-DP06-011, DEC-DP10-014. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Cost ha
Sum non-overlapping costs, then divide by the matching verified quantity for the same currency and accounting period. Result units: LKR/ha, LKR. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP02-017, DEC-DP03-002, DEC-DP10-003, DEC-DP33-006. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Rice plots
Plot share =100 × distinct eligible plots in category / eligible plots in all categories. Sown-area shares use a separate hectare denominator; grouped inputs do not verify plot identity. Result units: plots, %. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Decision bindings: DEC-DP03-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Dated variance
Observed date minus planned date in calendar days. Missing actual dates are pending, not zero delay. Approved working-day rules require a defined calendar. Result units: days.
Decision bindings: DEC-DP03-004, DEC-DP05-018, DEC-DP11-008, DEC-DP16-015, DEC-DP29-001, DEC-DP33-004. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Crop yield
Harvested crop output / Matching harvested crop area, for the same product, process and period. Result units: kg/ha.
Decision bindings: DEC-DP03-006, DEC-DP09-004. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Cash balance
Opening + receipts/additions − payments/reductions − other documented adjustments. Compare with independently recorded closing. A negative cash scenario is a shortfall, not an invalid water volume. Result units: LKR. Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss.
Decision bindings: DEC-DP04-010, DEC-DP24-007, DEC-DP28-011, DEC-DP32-011, DEC-DP33-007, DEC-DP35-018, DEC-DP36-011, DEC-DP37-016, DEC-DP38-018, DEC-DP41-013. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Pump energy
Electric energy consumed / Water pumped, for the same product, process and period. Result units: kWh/m³.
Decision bindings: DEC-DP05-016, DEC-DP22-009. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Probability forecast
Brier score = mean((event probability−observed0/1)²). Skill=1−Brier/reference Brier when the same-case reference score is positive. Result units: 0–1. Define one event, lead, observation category thresholds and an independent reference. Do not apply rainfall RMSE to probabilities or interpret one score as complete calibration.
Decision bindings: DEC-DP08-008. Sources: DD-BRIER, DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Series mismatch
Compare original definitions, identifiers, units and versions against documented equivalence evidence. Preserve conflicts and unresolved mappings; do not subtract category labels or silently merge records. Result units: items.
Decision bindings: DEC-DP08-011. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Point overlay
100×distinct spatially matched receptors / receptors in the same frame. Count a receptor once across overlapping areas; do not invent hectare areas from points. Result units: %, units. Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety.
Decision bindings: DEC-DP08-016, DEC-DP16-012, DEC-DP17-003, DEC-DP31-015. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Numeric mismatch
Later/comparison value minus Earlier/source value. Relative change = 100 × difference / Earlier/source value when the earlier value is positive. Result units: mm, %. Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite.
Decision bindings: DEC-DP08-018, DEC-DP10-019, DEC-DP14-002, DEC-DP17-010, DEC-DP23-014, DEC-DP23-017, DEC-DP24-006, DEC-DP25-017, DEC-DP40-009. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Lineage
Follow recorded upstream→downstream links within the same scope and period. Flag missing links; a confirmed defect identifies downstream linked candidates for authorized investigation. Result units: items. Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe.
Decision bindings: DEC-DP09-013, DEC-DP18-012, DEC-DP34-017, DEC-DP36-016. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Variety area
Category share = 100 × category amount / total compatible category amounts. HHI = sum of squared fractional shares, displayed on a 0–1 scale. Result units: ha, %. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Decision bindings: DEC-DP10-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Cost progress
100 × spending/phased budget, and verified−planned physical progress. Do not subtract LKR from physical progress, infer earned value or equate expenditure with outcomes. Result units: %, percentage points.
Decision bindings: DEC-DP11-002. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Study design
Check whether the question has a defined outcome, appropriate study design, comparison, baseline/follow-up, sampling, confounding and attrition evidence. Do not manufacture an effect estimate from missing design information. Result units: items. The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence.
Decision bindings: DEC-DP12-007, DEC-DP35-004, DEC-DP40-012. Sources: S92, DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Location mismatch
Display supplied location separation with the two reported accuracies and coordinate-reference evidence. Do not treat a matched name or boundary overlap as confirmed identity. Result units: m.
Decision bindings: DEC-DP13-004, DEC-DP31-004. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Survey cost
Sum non-overlapping costs, then divide by the matching verified quantity for the same currency and accounting period. Result units: LKR/survey unit, LKR. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP14-018. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Schema mismatch
Compare original definitions, identifiers, units and versions against documented equivalence evidence. Preserve conflicts and unresolved mappings; do not subtract category labels or silently merge records. Result units: items.
Decision bindings: DEC-DP15-010. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Damage loss
Asset quantity × replacement/repair unit cost. Show interrupted economic flows separately; no automatic damage+flow total or double counting. Result units: LKR, LKR/period. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP16-002. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Weighted proportion
Weighted proportion = sum(weight×indicator0/1)/sum(weight). Report the classification and eligible population; use design information for uncertainty. Result units: 0 or1. Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision.
Decision bindings: DEC-DP20-001, DEC-DP20-015. Sources: S91, DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Survey precision
Relative standard error=100×design-based SE/abs(estimate), only for a nonzero estimate and an actually supplied design-based SE. Sample count alone does not determine geographic precision. Result units: %. Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision.
Decision bindings: DEC-DP20-003. Sources: S91, DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Weighted area production
Estimated production=sum(weight×production); estimated harvested area=sum(weight×area); aggregate yield=estimated production/estimated area. Do not average individual yields without the matching denominator. Result units: kg/ha. Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision.
Decision bindings: DEC-DP20-013. Sources: S91, DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Groundwater trend
Display observations in dated order. Sample SD uses n−1; coefficient of variation = 100 × SD / positive mean. Result units: m. Groundwater head and depth below ground have opposite directional meanings. Match datum, pumping state and seasonal context; observed drawdown is not itself a safe-yield estimate.
Decision bindings: DEC-DP21-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Aquifer balance
Calculated closing = opening + inflows − releases/transfers − other outflows. Residual = independently observed closing − calculated closing. Result units: m³. A storage-change calculation needs a defined aquifer boundary and compatible volume estimates. Groundwater head in metres is not a storage volume; uncertainty and safe-abstraction review remain separate.
Decision bindings: DEC-DP21-007. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Well proximity
Display measured separation with hydrogeological direction, source type and the reviewed protection criterion. Distance alone cannot determine contamination, safety or a statutory protection area. Result units: m. Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety.
Decision bindings: DEC-DP21-008. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Drilling
Drilling cost / completed depth. Display tested yield and the stated success definition separately; cost per metre does not determine safe abstraction. Result units: LKR/m, L/s.
Decision bindings: DEC-DP21-016. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Billed water
NRW=input−billed authorized use. Water losses=NRW−unbilled authorized use. Residual real loss=water losses−estimated apparent losses, only when all components are available. Result units: m³, %. NRW is not all leakage. An unknown apparent-loss estimate keeps residual real loss unavailable. Meter uncertainty and matching time/zone boundaries matter.
Decision bindings: DEC-DP22-001. Sources: DD-NRW, DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Leakage evidence
NRW=input−billed authorized use. Water losses=NRW−unbilled authorized use. Residual real loss=water losses−estimated apparent losses, only when all components are available. Result units: m³, %. NRW is not all leakage. An unknown apparent-loss estimate keeps residual real loss unavailable. Meter uncertainty and matching time/zone boundaries matter.
Decision bindings: DEC-DP22-002. Sources: DD-NRW, DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Basket cost
Specified quantity × comparable unit price. Sum only non-overlapping items from the same basket specification, location and price period. Result units: LKR. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP25-006. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Input expenditure
Specified quantity × comparable unit price. Sum only non-overlapping items from the same basket specification, location and price period. Result units: LKR. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP25-011. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Labour
Cash cost/ha = hired days×cash wage/area. Total effort/ha=(hired+unpaid family days)/area. Do not value unpaid labour as zero opportunity cost. Result units: LKR/ha, person-days/ha.
Decision bindings: DEC-DP25-013. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Export composition
Compute export-value and quantity shares independently within compatible product and reporting frames; never add currency and kilograms. Result units: LKR, %. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Decision bindings: DEC-DP26-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Export unit value
Recorded export value / Export quantity on matching product basis, for the same product, process and period. Result units: LKR/kg. A unit value mixes prices and product composition. It is not automatically a like-for-like market price. Match grade, product code, currency and period.
Decision bindings: DEC-DP26-004, DEC-DP37-004. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Human match
Match documented expertise, available effort, date windows and required conflict/clearance evidence. A match suggests a candidate; it appoints nobody. Result units: hours. A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract.
Decision bindings: DEC-DP27-007, DEC-DP40-011, DEC-DP41-012. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Business retention
Lower =100 × known survivors / original cohort. Upper =100 × (known survivors + unknown) / original cohort. Survivors + known failures + unknown = original cohort; replacements do not enter it. Result units: %, enterprises. These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits.
Decision bindings: DEC-DP27-009. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Plot match
Compare the same specification and unit, uncommitted quantity and overlapping delivery windows. Keep mandatory quality and use conditions explicit. Result units: m². A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract.
Decision bindings: DEC-DP28-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Resource efficiency
Energy/output; water/output; and 100 × output/material input. Separate denominators and units; do not sum these efficiencies. Result units: kWh/kg, m³/kg, %.
Decision bindings: DEC-DP28-006, DEC-DP34-011. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Feedback
Category share = 100 × category amount / total compatible category amounts. HHI = sum of squared fractional shares, displayed on a 0–1 scale. Result units: cases, %. Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy.
Decision bindings: DEC-DP31-020. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Cost output
Sum non-overlapping costs, then divide by the matching verified quantity for the same currency and accounting period. Result units: LKR/kg, LKR. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP34-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Mass conversion
100 × saleable output / matching input mass. Keep by-products, transfers, moisture change and losses separately identified. Result units: %.
Decision bindings: DEC-DP34-010, DEC-DP37-001. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Tonne km
Shipment cost / (actual load tonnes × verified route kilometres). Match empty-return treatment and cost allocation. Result units: LKR/(t km). An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP37-002. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Affected lots
Follow recorded upstream→downstream links within the same scope and period. Flag missing links; a confirmed defect identifies downstream linked candidates for authorized investigation. Result units: items. Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe.
Decision bindings: DEC-DP37-009. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Process energy
Energy consumed / Saleable product output, for the same product, process and period. Result units: kWh/kg.
Decision bindings: DEC-DP37-011. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Verification cost
Sum non-overlapping costs, then divide by the matching verified quantity for the same currency and accounting period. Result units: LKR/accepted service unit, LKR. An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.
Decision bindings: DEC-DP39-004. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Followup retention
Lower =100 × known survivors / original cohort. Upper =100 × (known survivors + unknown) / original cohort. Survivors + known failures + unknown = original cohort; replacements do not enter it. Result units: %, participants. These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits.
Decision bindings: DEC-DP40-016, DEC-DP41-017. Sources: DD-LOCAL. Exact per-decision inputs and evidence remain in the controlled decision register.
Additional source locators
DD-WATER — FAO56 root-zone water balance — Institution publication
Chapter8 equation85 and ETc = Kc ETo. Daily water balance components; local coefficients and operating assumptions still need review.
https://www.fao.org/4/X0490E/x0490e0e.htm
DD-PESTICIDES — Sri Lanka Registrar of Pesticides — Government publication
Current registration lists, restrictions and label guidance. Registration and label evidence; no treatment recommendation or automatic permission.
https://doa.gov.lk/rop-downloads/
DD-CEA — CEA ambient water regulations — Government publication
Gazette2148/20, Schedule of use-specific categories. Published ambient water categories and limits; do not substitute them for drinking-water, effluent, air or noise rules.
https://www.cea.lk/web/images/pdf/epc/2148-20_E-1.pdf
DD-BRIER — JMA numerical weather prediction outline — Government publication
AppendixA.3, equationsA.3.1 and A.3.3. Brier score and reference skill for binary probability forecasts; the prototype uses one specified event, not an undifferentiated seasonal score.
https://www.jma.go.jp/jma/jma-eng/jma-center/nwp/outline2022-nwp/pdf/outline2022_all.pdf
DD-NRW — JICA non-revenue water training materials — Institution publication
Training materials, section1.1, IWA water-balance table. NRW, unbilled authorized use, apparent and real losses are distinct components.
https://openjicareport.jica.go.jp/pdf/12364485_03.pdf
DD-ILO — ILO controlling occupational risks — Institution publication
Controlling risks; hierarchy of controls. Evidence-led control review; no universal numeric risk score or clearance.
DD-GBIF — GBIF biological survey publishing guide — Institution publication
Version1.0.2, sections5.4 to5.7 and7.3. Survey event, effort, protocol, sampling scope and non-detection context; not a population estimator.
https://docs.gbif.org/guide-publishing-survey-data/en/
DD-LOCAL — SHARED domain decision contracts — Validation required
Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Published ecosystem accounting context: United Nations DESA, System of Environmental-Economic Accounting Ecosystem Accounting, December 2024, publication entry and SEEA account definitions. Extent, condition, physical service flows and monetary accounts remain separate. The publication entry is available; direct PDF retrieval returned access denied during checking. Obtain the full current method before operational account compilation.
Checked source USLE — USLE factor product. United States Department of Agriculture Forest Service. A Guide for Predicting Sheet and Rill Erosion on Forest Land. 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40. https://www.ars.usda.gov/ARSUserFiles/60600505/RUSLE/A%20guide%20for%20predicting%20sheet%20and%20rill%20erosion%20on%20forest%20land.pdf
Checked source MARGIN — Enterprise gross margin. Food and Agriculture Organization of the United Nations. Farm Management for Asia A Systems Approach. Chapter 4, Gross margin and section 4.7.1. https://www.fao.org/4/W7365E/w7365e07.htm
Checked source NPV — Discounted cash-flow NPV. Food and Agriculture Organization of the United Nations. Guidelines for defining financial economic environmental and social information. Sections 2.2.2 and 2.2.3, discounting and Net Present Value. https://www.fao.org/4/w8212e/w8212e06.htm
Checked source STOCK — Carbon stock-difference component. Intergovernmental Panel on Climate Change. 2006 IPCC Guidelines Volume 4 Chapter 2. Section 2.3.1.1, equation 2.8, stock-difference method. https://www.ipcc-nggip.iges.or.jp/public/2006gl/pdf/4_Volume4/V4_02_Ch2_Generic.pdf
Checked source SOC — Soil-carbon stock with volume correction. Intergovernmental Panel on Climate Change. Good Practice Guidance for LULUCF. Section 4.3.3.5.4, equation 4.3.3, printed page 4.106, PDF page 18. https://www.ipcc-nggip.iges.or.jp/public/gpglulucf/gpglulucf_files/Chp4/Chp4_3_Projects.pdf
Checked source DID — Difference-in-differences arithmetic. World Bank. Impact Evaluation in Practice Second Edition. Chapter 7, table 7.2, printed page 140, PDF page 170. https://documents1.worldbank.org/curated/en/698441474029568469/pdf/Impact-evaluation-in-practice.pdf
Checked source CV — Sample coefficient of variation. National Institute of Standards and Technology United States. Dataplot Coefficient of Variation. Description, sample coefficient of variation and ratio-scale restrictions. https://www.itl.nist.gov/div898/software/dataplot/refman2/auxillar/coefvari.htm
Checked source HHI — HHI concentration component. United States Department of Justice. Herfindahl Hirschman Index. Definition and four-firm worked example. https://www.justice.gov/atr/herfindahl-hirschman-index
Checked source RMSE — Matched-pair RMSE. Environment and Climate Change Canada. What is Root Mean Square Error. Displayed RMSE equation and definitions of forecast, observation and verification count. https://weather.gc.ca/verification/scores/rmse_e.html
Checked source BRIER — Binary Brier score and skill component. Japan Meteorological Agency. Outline of Operational Numerical Weather Prediction Appendix A Verification Indices 2024. Sections A.3.1 and A.3.2, equations A.3.1 and A.3.3, printed page 239, PDF page 7. https://www.jma.go.jp/jma/jma-eng/jma-center/nwp/outline2024-nwp/pdf/outline2024_Appendix_A.pdf
Checked source ETC — Crop evapotranspiration ETc component. Food and Agriculture Organization of the United Nations. FAO Irrigation and Drainage Paper 56 Crop Evapotranspiration. Chapter 5, Crop coefficient approach, equation 56. https://www.fao.org/4/X0490E/x0490e0a.htm
Checked source WEIGHTED — Weighted estimation component. United Nations Statistics Division. Handbook of Surveys on Households and Individuals Final Draft. Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting. https://unstats.un.org/UNSDWebsite/statcom/session_57/documents/BG-3k-Handbook_on_Surveys_of_Household_and_Individuals-E.pdf
Checked source NRW — IWA water-balance components. Asian Development Bank. The Issues and Challenges of Reducing Non-Revenue Water. Figure 4, printed page 15; Annex 1 Water Balance Definitions, printed pages 39–41, PDF pages 47–49. https://www.adb.org/sites/default/files/publication/27473/reducing-nonrevenue-water.pdf
6 4 Payments for Ecosystem Services
PES means payments for ecosystem services. In this fictional example, upstream farmer groups maintain riverbank vegetation and soil cover. An illustrative downstream water-user fund pays under an annual agreement. The intermediary keeps the agreement and evidence together; an independent checker checks the work.
Follow the example: agree the work and conditions; check the field record; calculate a proposal; then record separate authorisation and actual payment evidence.
Annual work record | Example |
|---|---|
Agreed area | 24 ha |
Checked area | 22 ha = 20 ha meeting conditions + 2 ha needing correction |
Area still to visit | 2 ha; checked 22 ha + unvisited 2 ha = agreed 24 ha |
Annual payment proposal | min(20 ha × LKR 12,500 per ha/year, LKR 300,000) = LKR 250,000 |
Funding and payment | LKR 200,000 available; funding confirmation missing. No amount ready for authorisation. Authorised = 0; paid = 0. |
These hectares show work compliance only. They do not prove cleaner water, additional environmental benefits or a monetary value of the ecosystem. Annual rates and caps are fictional agreement settings.
Checking possible displacement of land clearing
DEC-DP39-008 compares two fixed 200 ha observation areas using the same clearing definition, season and observation window. New clearing near the agreement increases from 0.6 ha to 1.4 ha; clearing in a separate comparison area increases from 0.4 ha to 0.5 ha. The two increases are 0.8 ha and 0.1 ha. Their difference is 0.7 ha. Investigate this signal; it does not prove that the agreement caused clearing.
DEC-DP39-007 uses the same published difference-of-changes arithmetic for ground cover: (85 − 60) − (67 − 62) = 20 percentage points. Comparable sites, baseline conditions and a defensible study design must be assessed before making a causal or additionality claim.
The 20 PES questions
Decision | Question |
|---|---|
001 | Which field checks are due? |
002 | How much agreed work passed the check? |
003 | What was checked, proposed and paid? |
004 | How much does a field check cost? |
005 | Is the scheme ready to start? |
006 | Can this group join the scheme? |
007 | Did the scheme add an environmental improvement? |
008 | Did land clearing move outside the agreement area? |
009 | Could the agreed work be lost or damaged? |
010 | Which service agreement is practical? |
011 | What payment can we propose? |
012 | How would the payment be shared? |
013 | Is the same work being claimed twice? |
014 | How should we measure the work and its benefits? |
015 | Is there enough money for the full agreement? |
016 | Could participation harm a household or its rights? |
017 | Which complaints need a response? |
018 | Is the checker independent? |
019 | Should the agreement continue, change or close? |
020 | Do the service name, unit and agreement match? |
Data needed
Obtain the versioned scheme and service agreement from its owner, the mapped area and rights/consent records from authorised custodians, field observations and signed protocol from the checker, and the rate schedule, funding commitment, authorisation and transaction references from the responsible payer. Record the original source, year, units, definitions, quality and permitted use. No approved Knuckles PES agreement or tariff is supplied by these examples.
Source basis
FAO, Payments for environmental services: what role in sustainable agricultural development?, ESA Working Paper 11-20, December 2011, section 2, printed pages 3–6: conditional agreements, additionality, displacement risks, durability and monitoring. Published institutional guidance; not a payment formula or a local rate.
https://www.fao.org/docrep/015/an456e/an456e00.pdf
World Bank, Impact Evaluation in Practice, second edition, chapter 7, Table 7.2, printed page 140: difference in differences = (treated after − before) − (comparison after − before). Verified published formula for the arithmetic used in DEC-DP39-007 and DEC-DP39-008. The publication does not verify these fictional data, the comparison design or a causal conclusion.
https://documents1.worldbank.org/curated/en/698441474029568469/pdf/Impact-evaluation-in-practice.pdf
The other PES rules are project checks or illustrative agreement arithmetic. Their status is Validation required. Use Institution review for local scheme authority, service definition, rights, safeguards, rate, funding, checking design and payment responsibility.
Find a decision
All 820 entries remain candidate examples grouped under shared calculation families, not 820 accepted contractual deliverables. Scope and local use remain pending in Institution review. Published core methods need a source and copying check, not repeated proof on each screen. Proposed, accepted, conditional and formally deferred release counts are in the existing acceptance annex.
Download the decision register · Release and option status
820 candidate decisions
| Decision | Question and inputs | Calculation, sources and scope |
|---|---|---|
| DEC-DP01-001DP01 | Land change Prioritize divisions with material land-use change Inputs and approvalDivision and fixed analysis area; earlier/later years; native category/code and mapping; area and unit; dataset/boundary/class/method versions; missing and unclassified extent; source, coverage and local quality; optional matched from/to parcel evidence Result: Change (ha) LAND-CHANGE-1: annual class trends; comparable endpoints; hectares or percentage sorting and direction; matched fictional parcel transitions; coherent example edits and map images; decision summary with reason, action and proposed role. Limits Complete compatible endpoints only; missing is not zero; reject conflicting source mappings; unresolved categories remain excluded; no invented balancing area, action threshold, confidence interval or causal conclusion. Sorting is a proposed review aid. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-002DP01 | Development screening Refer proposed developments overlapping constraints Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-003DP01 | Planning coverage Commission missing divisional land-use plans Inputs and approvalRequired eligible frame [divisions]; Distinct members of that frame covered [divisions]; Frame members with unknown coverage [divisions] Result: Verified coverage; Known uncovered; Unknown coverage (%; divisions; divisions) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-004DP01 | Field verification Investigate field and map classification disagreements Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-005DP01 | Agricultural suitability Shortlist land uses compatible with local conditions Inputs and approvalLand polygon; Land polygon evidence reference; soil depth; soil depth evidence reference; slope degrees; slope degrees evidence reference; rainfall; rainfall evidence reference; water access; water access evidence reference; crop requirements; crop requirements evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-006DP01 | Land conversion Refer land-conversion applications for determination Inputs and approvalApplication ID; Application ID evidence reference; current use; current use evidence reference; proposed use; proposed use evidence reference; ownership evidence; ownership evidence evidence reference; applicable rules; applicable rules evidence reference; objections; objections evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S01, S53, S63 Context alone does not validate the formula. |
| DEC-DP01-007DP01 | Settlement planning Compare candidate settlement expansion areas Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-008DP01 | Idle land Prioritize investigations of uncultivated suitable land Inputs and approvalRequired eligible frame [ha]; Distinct members of that frame covered [ha]; Frame members with unknown coverage [ha] Result: Verified coverage; Known uncovered; Unknown coverage (%; ha; ha) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-009DP01 | Wetland protection Flag proposed activities overlapping mapped wetlands Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-010DP01 | Riparian protection Refer activities inside reviewed river reservations Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-011DP01 | Tenure conflicts Resolve unresolved tenure objections before planning Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-012DP01 | Fragmentation Identify fragmented agricultural holdings for coordination Inputs and approvalParcels in the same holding [plots]; Holding total area [ha]; Largest documented inter-parcel separation [m]; Holding and tenure reference Result: Mean parcel area; Parcel count (ha/parcel; parcels) DOMAIN-1 / fragmentation: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COMPOSITIONImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-013DP01 | Urban expansion Review loss of agricultural land to built development Inputs and approvalEarlier mapped class area [ha]; Later mapped class area [ha]; Matched area leaving the class [ha]; Matched area entering the class [ha]; Same fixed analysis extent [ha]; Native class and mapping version; Earlier observation date; Later observation date Result: Net class-area change; Relative class-area change; Gross loss from class; Gross gain to class (ha; %; ha; ha) DOMAIN-1 / land-change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Same boundary, definitions, observation basis and adequate map quality are required. Coverage changes and classification error are not proven land-use change. Example boundaries and transitions are fictional. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-014DP01 | Service access Compare access improvements for isolated planning areas Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-015DP01 | Restoration planning Compare restoration land-use alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-016DP01 | Land degradation Target detailed soil-loss assessment in planning units Inputs and approvalRainfall erosivity [MJ mm/(ha h year)]; Soil erodibility [t ha h/(ha MJ mm)]; Slope-length and steepness factor [ratio]; Cover-management factor [fraction]; Support-practice factor [fraction] Result: Estimated annual sheet/rill loss (t/ha/year) DOMAIN-1 / erosion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits This USLE factor product is not a full RUSLE2 run, measured loss, delivered sediment, gully loss or landslide forecast. Local factors and uncertainty need review. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · USLE factor product United States Department of Agriculture Forest Service · 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40 Government publication - United States Department of Agriculture Forest Service EROSIONImplementation: prototype Method source: S80 |
| DEC-DP01-017DP01 | Plan implementation Investigate differences between planned and actual use Inputs and approvalPlanned value [ha]; Observed value [ha] Result: Difference; Relative change (ha; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-018DP01 | Public consultation Resolve outstanding planning consultations Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-019DP01 | Map documentation Correct incomplete land-use layer metadata Inputs and approvalLayer ID; Layer ID evidence reference; scale; scale evidence reference; coordinate system; coordinate system evidence reference; classification edition; classification edition evidence reference; owner; owner evidence reference; survey date; survey date evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP01-020DP01 | Survey scheduling Schedule priority land-use map updates Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Land-use planner and spatial data custodian. Authorized decision-maker for Land Use Policy Planning Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-001DP02 | Erosion Select land units requiring erosion-control assessment Inputs and approvalRainfall erosivity [MJ mm/(ha h year)]; Soil erodibility [t ha h/(ha MJ mm)]; Slope-length and steepness factor [ratio]; Cover-management factor [fraction]; Support-practice factor [fraction] Result: Estimated annual sheet/rill loss (t/ha/year) DOMAIN-1 / erosion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits This USLE factor product is not a full RUSLE2 run, measured loss, delivered sediment, gully loss or landslide forecast. Local factors and uncertainty need review. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · USLE factor product United States Department of Agriculture Forest Service · 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40 Government publication - United States Department of Agriculture Forest Service EROSIONImplementation: prototype Method source: S80 |
| DEC-DP02-002DP02 | Conservation treatments Compare contouring mulching and cover-crop alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-003DP02 | Erosion classes Allocate survey effort across reviewed erosion classes Inputs and approvalMapped area in the stated erosion class [ha]; Area with accepted observations [ha]; Native class/variety and definition edition Result: Class area; Share of selected mapped area; Class observation coverage (ha; %; %) DOMAIN-1 / erosion-area: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COMPOSITIONImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-004DP02 | Soil carbon Select sites for comparable soil-carbon monitoring Inputs and approvalSoil organic carbon [%]; Fine-earth bulk-density basis [t/m³]; Sample depth [m]; Coarse-fragment volume fraction [%]; Sampling depth, design and density convention Result: Soil-carbon stock (t C/ha) DOMAIN-1 / soilcarbon: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A carbon concentration is not a stock. Change comparisons require consistent depth/mass, sampling, density convention and uncertainty review. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Soil-carbon stock with volume correction Intergovernmental Panel on Climate Change · Section 4.3.3.5.4, equation 4.3.3, printed page 4.106, PDF page 18 Institution publication - Intergovernmental Panel on Climate Change SOILCARBONImplementation: prototype Method source: S79 |
| DEC-DP02-005DP02 | Soil fertility Refer nutrient and acidity limitations for agronomic advice Inputs and approvalParameter and applicable use; Measured result [pH]; Example lower comparison bound [pH]; Example upper comparison bound [pH]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (pH) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-006DP02 | Salinity Prioritize investigations of salinity-affected land Inputs and approvalParameter and applicable use; Measured result [dS/m]; Example lower comparison bound [dS/m]; Example upper comparison bound [dS/m]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (dS/m) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-007DP02 | Soil compaction Select plots needing compaction management assessment Inputs and approvalParameter and applicable use; Measured result [g/cm³]; Example lower comparison bound [g/cm³]; Example upper comparison bound [g/cm³]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (g/cm³) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-008DP02 | Infiltration Compare practices to improve infiltration and runoff control Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-009DP02 | Water harvesting Shortlist suitable farm water-harvesting locations Inputs and approvalCatchment geometry; Catchment geometry evidence reference; rainfall; rainfall evidence reference; storage sites; storage sites evidence reference; soil permeability; soil permeability evidence reference; access; access evidence reference; constraints; constraints evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-010DP02 | On-farm irrigation Select improvements for low water productivity Inputs and approvalSaleable crop output [kg]; Matching irrigation water input [m³] Result: Crop water productivity (kg/m³) DOMAIN-1 / water-productivity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-011DP02 | Watershed treatments Prioritize connected watershed conservation interventions Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-012DP02 | Conservation inspection Follow up incomplete conservation works Inputs and approvalWork ID; Work ID evidence reference; approved design; approved design evidence reference; inspection items; inspection items evidence reference; photographs; photographs evidence reference; completion evidence; completion evidence evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-013DP02 | Agroclimate advice Issue evidence packages for local agricultural advisories Inputs and approvalComparable reference value [mm]; Later/comparison value [mm] Result: Difference; Relative change (mm; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-014DP02 | Monitoring network Repair incomplete soil and weather observation coverage Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-015DP02 | Crop suitability Review limiting soil and climate factors for proposed crops Inputs and approvalSoil depth; Soil depth evidence reference; texture; texture evidence reference; slope; slope evidence reference; rainfall; rainfall evidence reference; temperature; temperature evidence reference; crop requirements; crop requirements evidence reference; irrigation; irrigation evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-016DP02 | Demonstration trials Evaluate conservation practice outcomes Inputs and approvalTreatment Measured runoff before [mm/season]; Treatment Measured runoff after [mm/season]; Comparison Measured runoff before [mm/season]; Comparison Measured runoff after [mm/season]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (mm/season) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP02-017DP02 | Conservation economics Compare conservation cost per verified treated hectare Inputs and approvalLabour cost [LKR]; Material/input cost [LKR]; Other non-overlapping cost [LKR]; Verified matching hectares [ha] Result: Cost per matching unit; Total cost (LKR/ha; LKR) DOMAIN-1 / cost-ha: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-018DP02 | Soil contamination Refer suspect agricultural soil samples for investigation Inputs and approvalParameter and applicable use; Measured result [mg/kg]; Example lower comparison bound [mg/kg]; Example upper comparison bound [mg/kg]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mg/kg) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-019DP02 | Technical dissemination Target conservation guidance where adoption is low Inputs and approvalRequired eligible frame [farms]; Distinct members of that frame covered [farms]; Frame members with unknown coverage [farms] Result: Verified coverage; Known uncovered; Unknown coverage (%; farms; farms) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP02-020DP02 | Model assurance Review reproducibility of soil and land assessments Inputs and approvalEarlier/source value [t/ha/year]; Independently reproduced value [t/ha/year]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [t/ha/year]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (t/ha/year; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Soil scientist and land-resource specialist. Authorized decision-maker for Natural Resources Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-001DP03 | Seed adoption Plan seed support around observed rice-category uptake Inputs and approvalDistinct eligible original plots [plots]; Sown area recorded separately [ha] Result: Plot count; Share of eligible plots; Share of recorded sown area (plots; %; %) DOMAIN-1 / rice-plots: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COMPOSITIONImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-002DP03 | Production costs Target crop production costs requiring intervention Inputs and approvalLabour cost [LKR]; Material/input cost [LKR]; Other non-overlapping cost [LKR]; Verified matching hectares [ha] Result: Cost per matching unit; Total cost (LKR/ha; LKR) DOMAIN-1 / cost-ha: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-003DP03 | Irrigation advice Prepare crop-stage irrigation recommendations Inputs and approvalIrrigated crop area [ha]; Reference evapotranspiration [mm/day]; Crop coefficient [ratio]; Rainfall reaching the field after runoff [mm/day]; Deep percolation and paddy allowance [mm/day]; Capillary contribution [mm/day]; Desired change in stored soil water [mm/day]; Field application efficiency [fraction] Result: Gross daily irrigation requirement; Net field requirement (m³/day; mm/day) DOMAIN-1 / water: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The full local balance, rooting depth, stress, crop stage and operating constraints still matter. The paddy allowance is explicit and must be zero where inapplicable. This is not an authorized reservoir release. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Crop evapotranspiration ETc component Food and Agriculture Organization of the United Nations · Chapter 5, Crop coefficient approach, equation 56 Institution publication - Food and Agriculture Organization of the United Nations WATERImplementation: prototype |
| DEC-DP03-004DP03 | Planting guidance Adjust sowing guidance using observed planting progress Inputs and approvalPlanned milestone/sowing date; Observed completion/sowing date Result: Calendar date difference (days) DOMAIN-1 / dated-variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-005DP03 | Variety selection Compare varieties against local agronomic constraints Inputs and approvalVariety traits; Variety traits evidence reference; soil; soil evidence reference; rainfall; rainfall evidence reference; temperature; temperature evidence reference; pest pressure; pest pressure evidence reference; water availability; water availability evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-006DP03 | Yield gaps Prioritize locations with low comparable crop productivity Inputs and approvalHarvested crop output [kg]; Matching harvested crop area [ha] Result: Crop yield (kg/ha) DOMAIN-1 / crop-yield: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-007DP03 | Pest surveillance Prioritize field investigation of unusual pest incidence Inputs and approvalComparable reference value [pests per inspected plant]; Later/comparison value [pests per inspected plant] Result: Difference; Relative change (pests per inspected plant; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-008DP03 | Disease management Refer crop disease cases for diagnosis and control advice Inputs and approvalSymptoms; Symptoms evidence reference; laboratory result; laboratory result evidence reference; crop; crop evidence reference; spread observations; spread observations evidence reference; current control guidance; current control guidance evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-009DP03 | Seed certification Prioritize seed lots awaiting required tests Inputs and approvalLot ID; Lot ID evidence reference; germination test; germination test evidence reference; purity test; purity test evidence reference; health test; health test evidence reference; current certification criteria; current certification criteria evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-010DP03 | Seed supply Plan seed procurement against seasonal demand Inputs and approvalPhysical stock [kg seed]; Quarantined stock [kg seed]; Expired stock [kg seed]; Committed usable stock [kg seed]; Additional demand [kg seed]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (kg seed; kg seed) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-011DP03 | Fertilizer advice Refer soil-test-based nutrient requirements for review Inputs and approvalParameter and applicable use; Measured result [mg/kg]; Example lower comparison bound [mg/kg]; Example upper comparison bound [mg/kg]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mg/kg) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-012DP03 | Pesticide stewardship Review proposed pesticide use against current conditions Inputs and approvalProduct registration; Product registration evidence reference; crop; crop evidence reference; pest; pest evidence reference; label version; label version evidence reference; application record; application record evidence reference; restrictions; restrictions evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, DD-PESTICIDES, S03, S11, S50 Context alone does not validate the formula. |
| DEC-DP03-013DP03 | Extension delivery Target extension services to unmet farmer needs Inputs and approvalRequired eligible frame [farmers]; Distinct members of that frame covered [farmers]; Frame members with unknown coverage [farmers] Result: Verified coverage; Known uncovered; Unknown coverage (%; farmers; farmers) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-014DP03 | Post-harvest loss Select crop stages needing loss-reduction measures Inputs and approvalBatch input on stated moisture basis [kg]; Saleable output [kg]; Usable by-product [kg]; Closing stock [kg]; Documented transfers out [kg] Result: Unaccounted physical share; Unaccounted mass (%; kg) DOMAIN-1 / loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required LOSSImplementation: prototype Method source: S57 |
| DEC-DP03-015DP03 | Mechanization Compare machinery service options for crop operations Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-016DP03 | Crop diversification Compare crop enterprises under resource constraints Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-017DP03 | Farm income Identify crop enterprises with weak gross margins Inputs and approvalSaleable output [kg]; Realized price [LKR/kg]; Variable costs [LKR]; Matching crop area [ha] Result: Enterprise gross margin; Gross margin per hectare; Variable-cost break-even price (LKR; LKR/ha; LKR/kg) DOMAIN-1 / margin: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep fixed costs, family-labour opportunity cost, taxes and financing identifiable. Gross margin is not net profit. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Enterprise gross margin Food and Agriculture Organization of the United Nations · Chapter 4, Gross margin and section 4.7.1 Institution publication - Food and Agriculture Organization of the United Nations MARGINImplementation: prototype Method source: S76 |
| DEC-DP03-018DP03 | Weather losses Assess yield change following documented weather events Inputs and approvalTreatment Crop productivity before [kg/ha]; Treatment Crop productivity after [kg/ha]; Comparison Crop productivity before [kg/ha]; Comparison Crop productivity after [kg/ha]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (kg/ha) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP03-019DP03 | Advisory effectiveness Follow up farmers who received technical guidance Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP03-020DP03 | Research trials Select crop technologies for further validation Inputs and approvalEarlier/source value [kg/ha]; Independently reproduced value [kg/ha]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [kg/ha]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (kg/ha; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Crop specialist, extension officer and agricultural statistician. Authorized decision-maker for Department of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-001DP04 | Paddy utilization Target support to registered land not cultivated this season Inputs and approvalRequired eligible frame [ha]; Distinct members of that frame covered [ha]; Frame members with unknown coverage [ha] Result: Verified coverage; Known uncovered; Unknown coverage (%; ha; ha) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-002DP04 | Support overlap Review repeated farmer assistance before new allocation Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-003DP04 | Minor irrigation Prioritize service areas with unmet crop water needs Inputs and approvalPlanned value [m³]; Observed value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-004DP04 | Agrarian services Clear delayed farmer-service requests Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-005DP04 | Paddy register Resolve conflicting parcel and cultivator records Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-006DP04 | Cultivation disputes Refer unresolved cultivation-right disputes Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-007DP04 | Land conversion Screen paddy conversion requests for formal determination Inputs and approvalParcel status; Parcel status evidence reference; proposed use; proposed use evidence reference; application evidence; application evidence evidence reference; current rules; current rules evidence reference; inspection findings; inspection findings evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S04, S55 Context alone does not validate the formula. |
| DEC-DP04-008DP04 | Tank rehabilitation Compare minor-tank rehabilitation alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-009DP04 | Farmer organizations Review organization registration and governance compliance Inputs and approvalOrganization ID; Organization ID evidence reference; registration; registration evidence reference; membership; membership evidence reference; meeting records; meeting records evidence reference; audit findings; audit findings evidence reference; current criteria; current criteria evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-010DP04 | Organization finance Follow up unreconciled farmer-organization funds Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-011DP04 | Crop damage Prioritize verification of reported crop damage Inputs and approvalClaim ID; Claim ID evidence reference; affected hectares; affected hectares evidence reference; crop stage; crop stage evidence reference; event date; event date evidence reference; inspection evidence; inspection evidence evidence reference; parcel ID; parcel ID evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-012DP04 | Subsidy administration Refer complete subsidy applications for approval Inputs and approvalApplicant ID; Applicant ID evidence reference; scheme version; scheme version evidence reference; parcel evidence; parcel evidence evidence reference; eligibility documents; eligibility documents evidence reference; prior assistance; prior assistance evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S04, S55 Context alone does not validate the formula. |
| DEC-DP04-013DP04 | Input distribution Plan timely distribution of approved farm inputs Inputs and approvalPhysical stock [kg input]; Quarantined stock [kg input]; Expired stock [kg input]; Committed usable stock [kg input]; Additional demand [kg input]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (kg input; kg input) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-014DP04 | Service centres Allocate staff to agrarian centres with workload gaps Inputs and approvalDemand in the selected period [staff hours]; Rated capacity for that period [staff hours]; Unavailable or restricted capacity [staff hours] Result: Usable capacity minus demand; Usable capacity (staff hours; staff hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-015DP04 | Canal maintenance Schedule communal minor-irrigation maintenance Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-016DP04 | Farmer participation Improve representation in cultivation meetings Inputs and approvalRequired eligible frame [cultivators]; Distinct members of that frame covered [cultivators]; Frame members with unknown coverage [cultivators] Result: Verified coverage; Known uncovered; Unknown coverage (%; cultivators; cultivators) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-017DP04 | Tank reservations Refer encroachment concerns for field and legal review Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-018DP04 | Irrigation equity Review head-end and tail-end water-delivery differences Inputs and approvalPlanned value [m³]; Observed value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-019DP04 | Registry updates Schedule outdated farmer and land record checks Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP04-020DP04 | Service outcomes Evaluate whether agrarian support improved cultivation Inputs and approvalTreatment Verified cultivated share before [%]; Treatment Verified cultivated share after [%]; Comparison Verified cultivated share before [%]; Comparison Verified cultivated share after [%]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (%) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Agrarian service officer and relevant land/water specialist. Authorized decision-maker for Department of Agrarian Development; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP05-001DP05 | Command water demand Prepare additional irrigation allocation proposals Inputs and approvalIrrigated crop area [ha]; Reference evapotranspiration [mm/day]; Crop coefficient [ratio]; Rainfall reaching the field after runoff [mm/day]; Deep percolation and paddy allowance [mm/day]; Capillary contribution [mm/day]; Desired change in stored soil water [mm/day]; Field application efficiency [fraction] Result: Gross daily irrigation requirement; Net field requirement (m³/day; mm/day) DOMAIN-1 / water: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The full local balance, rooting depth, stress, crop stage and operating constraints still matter. The paddy allowance is explicit and must be zero where inapplicable. This is not an authorized reservoir release. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Crop evapotranspiration ETc component Food and Agriculture Organization of the United Nations · Chapter 5, Crop coefficient approach, equation 56 Institution publication - Food and Agriculture Organization of the United Nations WATERImplementation: prototype |
| DEC-DP05-002DP05 | Gauge operations Restore stale river and reservoir observations Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-003DP05 | Canal performance Prioritize canals with delivery shortfalls Inputs and approvalPlanned value [m³]; Observed value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-004DP05 | Reservoir operation Review storage consequences of proposed releases Inputs and approvalOpening storage [m³]; All measured inflows and transfers in [m³]; Releases and transfers out [m³]; Evaporation and other outflows [m³]; Independently observed closing storage [m³] Result: Calculated closing storage; Observed minus calculated closing (m³; m³) DOMAIN-1 / balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-005DP05 | Dam safety Escalate dam inspection defects requiring engineering action Inputs and approvalDam ID; Dam ID evidence reference; seepage; seepage evidence reference; deformation; deformation evidence reference; inspection findings; inspection findings evidence reference; approved limits; approved limits evidence reference; responsible engineer; responsible engineer evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-006DP05 | Flood readiness Prepare response options from authorized hydrological evidence Inputs and approvalRiver levels; River levels evidence reference; official forecast; official forecast evidence reference; flood exposure; flood exposure evidence reference; warning protocol; warning protocol evidence reference; evacuation constraints; evacuation constraints evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-007DP05 | Drought allocation Compare feasible drought water-allocation alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-008DP05 | Reservoir sedimentation Prioritize bathymetric surveys and desilting appraisal Inputs and approvalEarlier/source value [m³]; Later/comparison value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-009DP05 | Canal rehabilitation Prioritize repair packages within engineering and budget limits Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-010DP05 | Drainage Select drainage improvements for persistently waterlogged areas Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-011DP05 | Salinity exclusion Investigate saline intrusion affecting irrigated land Inputs and approvalParameter and applicable use; Measured result [µS/cm]; Example lower comparison bound [µS/cm]; Example upper comparison bound [µS/cm]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (µS/cm) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-012DP05 | Gate scheduling Schedule approved gate operations without conflicts Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-013DP05 | Water productivity Target schemes with low crop output per water delivered Inputs and approvalSaleable crop output [kg]; Matching irrigation water input [m³] Result: Crop water productivity (kg/m³) DOMAIN-1 / water-productivity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-014DP05 | Environmental flows Flag proposed releases inconsistent with reviewed flow conditions Inputs and approvalPlanned value [m³/s]; Observed value [m³/s] Result: Difference; Relative change (m³/s; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-015DP05 | Hydrological models Require reproducible calibration before model use Inputs and approvalEarlier/source value [m³/s]; Independently reproduced value [m³/s]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [m³/s]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (m³/s; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-016DP05 | Pumping systems Compare energy performance of lift-irrigation stations Inputs and approvalElectric energy consumed [kWh]; Water pumped [m³] Result: Specific energy use (kWh/m³) DOMAIN-1 / pump-energy: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-017DP05 | Rehabilitation investment Appraise reservoir rehabilitation cash-flow alternatives Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP05-018DP05 | Construction delivery Investigate delayed irrigation construction milestones Inputs and approvalPlanned milestone/sowing date; Observed completion/sowing date Result: Calendar date difference (days) DOMAIN-1 / dated-variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-019DP05 | Spare parts Prevent shortages of critical irrigation equipment spares Inputs and approvalPhysical stock [spares]; Quarantined stock [spares]; Expired stock [spares]; Committed usable stock [spares]; Additional demand [spares]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (spares; spares) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP05-020DP05 | Public information Correct missing metadata in published reservoir information Inputs and approvalReservoir ID; Reservoir ID evidence reference; reading time; reading time evidence reference; unit; unit evidence reference; datum; datum evidence reference; source; source evidence reference; review state; review state evidence reference; update schedule; update schedule evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Irrigation operations engineer and hydrologist; dam safety specialist for structural decisions. Authorized decision-maker for Irrigation Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-001DP06 | Seasonal cropping Review cropping plans against calculated water requirements Inputs and approvalIrrigated crop area [ha]; Reference evapotranspiration [mm/day]; Crop coefficient [ratio]; Rainfall reaching the field after runoff [mm/day]; Deep percolation and paddy allowance [mm/day]; Capillary contribution [mm/day]; Desired change in stored soil water [mm/day]; Field application efficiency [fraction] Result: Gross daily irrigation requirement; Net field requirement (m³/day; mm/day) DOMAIN-1 / water: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The full local balance, rooting depth, stress, crop stage and operating constraints still matter. The paddy allowance is explicit and must be zero where inapplicable. This is not an authorized reservoir release. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Crop evapotranspiration ETc component Food and Agriculture Organization of the United Nations · Chapter 5, Crop coefficient approach, equation 56 Institution publication - Food and Agriculture Organization of the United Nations WATERImplementation: prototype |
| DEC-DP06-002DP06 | Water delivery Correct system-level water-delivery shortfalls Inputs and approvalPlanned value [m³]; Observed value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-003DP06 | Reservoir networks Review linked-reservoir storage and transfer scenarios Inputs and approvalOpening storage [m³]; All measured inflows and transfers in [m³]; Releases and transfers out [m³]; Evaporation and other outflows [m³]; Independently observed closing storage [m³] Result: Calculated closing storage; Observed minus calculated closing (m³; m³) DOMAIN-1 / balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-004DP06 | Planning evidence Restore stale data feeds used in seasonal planning Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-005DP06 | Multi-sector allocation Compare agriculture energy and domestic-water allocations Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-006DP06 | Drought response Prioritize demand-management options during shortages Inputs and approvalSystem shortages; System shortages evidence reference; crop stages; crop stages evidence reference; essential demand; essential demand evidence reference; feasible options; feasible options evidence reference; impacts; impacts evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-007DP06 | Land allocation Refer agricultural and commercial land requests for approval Inputs and approvalParcel ID; Parcel ID evidence reference; applicant evidence; applicant evidence evidence reference; permitted purpose; permitted purpose evidence reference; plan edition; plan edition evidence reference; current rules; current rules evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S07, S08, S50 Context alone does not validate the formula. |
| DEC-DP06-008DP06 | Land conversion Review proposed uses against approved system plans Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-009DP06 | Reservation protection Investigate activities within tank and canal reservations Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-010DP06 | Farmer livelihoods Target livelihood support to uncovered eligible settlers Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-011DP06 | System productivity Identify systems with low agricultural water productivity Inputs and approvalSaleable crop output [kg]; Matching irrigation water input [m³] Result: Crop water productivity (kg/m³) DOMAIN-1 / water-productivity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-012DP06 | Crop diversification Compare alternative cropping patterns for system plans Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-013DP06 | Irrigation assets Prioritize Mahaweli infrastructure maintenance Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-014DP06 | Settlement services Plan service capacity for settlement growth Inputs and approvalDemand in the selected period [m³/day]; Rated capacity for that period [m³/day]; Unavailable or restricted capacity [m³/day] Result: Usable capacity minus demand; Usable capacity (m³/day; m³/day) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-015DP06 | Environmental restoration Select riparian and catchment restoration alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-016DP06 | Aquaculture coordination Review reservoir-use conflicts involving fisheries Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-017DP06 | Flood operations Prepare coordinated operating options during high inflows Inputs and approvalOfficial forecasts; Official forecasts evidence reference; reservoir levels; reservoir levels evidence reference; downstream exposure; downstream exposure evidence reference; approved operating rules; approved operating rules evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-018DP06 | Investment delivery Escalate delayed system-development milestones Inputs and approvalPlanned value [m³]; Observed value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-019DP06 | Public consultation Resolve objections to system development proposals Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP06-020DP06 | System reporting Reconcile inconsistent land and water system codes Inputs and approvalSource system labels; Source system labels evidence reference; official system registry; official system registry evidence reference; geometry edition; geometry edition evidence reference; steward decisions; steward decisions evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water-planning engineer and land/settlement specialist. Authorized decision-maker for Mahaweli Authority of Sri Lanka; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-001DP07 | Forest cover Investigate comparable forest-cover changes Inputs and approvalEarlier mapped class area [ha]; Later mapped class area [ha]; Matched area leaving the class [ha]; Matched area entering the class [ha]; Same fixed analysis extent [ha]; Native class and mapping version; Earlier observation date; Later observation date Result: Net class-area change; Relative class-area change; Gross loss from class; Gross gain to class (ha; %; ha; ha) DOMAIN-1 / land-change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Same boundary, definitions, observation basis and adequate map quality are required. Coverage changes and classification error are not proven land-use change. Example boundaries and transitions are fictional. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-002DP07 | Forest inventory Prioritize forest plots missing structural measurements Inputs and approvalRequired eligible frame [plots]; Distinct members of that frame covered [plots]; Frame members with unknown coverage [plots] Result: Verified coverage; Known uncovered; Unknown coverage (%; plots; plots) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-003DP07 | Restoration survival Target maintenance to poorly surviving planting cohorts Inputs and approvalOriginal cohort [plants]; Known surviving original members [plants]; Known failed original members [plants]; Original members with unknown follow-up [plants]; Replacements in a separate cohort [plants] Result: Confirmed survival lower bound; Survival upper bound; Unknown follow-up (%; %; plants) DOMAIN-1 / survival: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVIVALImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-004DP07 | Forest alerts Assign unresolved forest-disturbance investigations Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-005DP07 | Fire preparedness Prioritize fire prevention and preparedness locations Inputs and approvalFuel observations; Fuel observations evidence reference; weather; weather evidence reference; fire history; fire history evidence reference; exposed assets; exposed assets evidence reference; access; access evidence reference; response capacity; response capacity evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-006DP07 | Encroachment Refer suspected forest encroachment for verification Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-007DP07 | Restoration selection Compare assisted regeneration and planting alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-008DP07 | Species selection Shortlist restoration species suited to site conditions Inputs and approvalSpecies traits; Species traits evidence reference; soil; soil evidence reference; rainfall; rainfall evidence reference; elevation; elevation evidence reference; native range; native range evidence reference; site objectives; site objectives evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-009DP07 | Nursery supply Plan seedling production for approved planting demand Inputs and approvalPhysical stock [seedlings]; Quarantined stock [seedlings]; Expired stock [seedlings]; Committed usable stock [seedlings]; Additional demand [seedlings]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (seedlings; seedlings) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-010DP07 | Seed provenance Review seed and seedling provenance before deployment Inputs and approvalLot ID; Lot ID evidence reference; species; species evidence reference; provenance; provenance evidence reference; collection permit; collection permit evidence reference; health test; health test evidence reference; planting site; planting site evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-011DP07 | Invasive plants Prioritize invasive-species control and follow-up Inputs and approvalSpecies observations; Species observations evidence reference; occupied area; occupied area evidence reference; spread; spread evidence reference; treatment history; treatment history evidence reference; ecological sensitivity; ecological sensitivity evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-012DP07 | Watershed protection Prioritize forest catchments needing conservation action Inputs and approvalRainfall erosivity [MJ mm/(ha h year)]; Soil erodibility [t ha h/(ha MJ mm)]; Slope-length and steepness factor [ratio]; Cover-management factor [fraction]; Support-practice factor [fraction] Result: Estimated annual sheet/rill loss (t/ha/year) DOMAIN-1 / erosion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits This USLE factor product is not a full RUSLE2 run, measured loss, delivered sediment, gully loss or landslide forecast. Local factors and uncertainty need review. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · USLE factor product United States Department of Agriculture Forest Service · 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40 Government publication - United States Department of Agriculture Forest Service EROSIONImplementation: prototype Method source: S80 |
| DEC-DP07-013DP07 | Forest carbon Review inventory evidence for carbon-stock estimates Inputs and approvalEarlier carbon density [t C/ha]; Later carbon density [t C/ha]; Same inventory area [ha]; Included pools and allometry references Result: Carbon stock change; Carbon-density change (t C; t C/ha) DOMAIN-1 / carbon: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Inventory plots, allometry and uncertainty remain required evidence. Stock change is not an issued carbon credit, additionality test or payable service. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Carbon stock-difference component Intergovernmental Panel on Climate Change · Section 2.3.1.1, equation 2.8, stock-difference method Institution publication - Intergovernmental Panel on Climate Change CARBONImplementation: prototype Method source: S79 |
| DEC-DP07-014DP07 | Community forestry Address gaps in community forestry participation Inputs and approvalRequired eligible frame [communities]; Distinct members of that frame covered [communities]; Frame members with unknown coverage [communities] Result: Verified coverage; Known uncovered; Unknown coverage (%; communities; communities) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-015DP07 | Timber authorization Refer complete timber-use cases for formal determination Inputs and approvalPermit request; Permit request evidence reference; species; species evidence reference; quantity; quantity evidence reference; provenance; provenance evidence reference; forest plan; forest plan evidence reference; current conditions; current conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S09, S48, S49 Context alone does not validate the formula. |
| DEC-DP07-016DP07 | Plantation management Schedule silvicultural work by stand condition Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-017DP07 | Ecotourism Compare visitor demand with safe site capacity Inputs and approvalDemand in the selected period [visitors/day]; Rated capacity for that period [visitors/day]; Unavailable or restricted capacity [visitors/day] Result: Usable capacity minus demand; Usable capacity (visitors/day; visitors/day) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-018DP07 | Biodiversity monitoring Select comparable forest biodiversity surveys Inputs and approvalObserved distinct species [species]; Survey effort [hours]; Survey protocol and version; Survey season and taxonomic scope; All planned survey visits completed Result: Observed richness; Recorded effort (species; hours) DOMAIN-1 / biodiversity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Observed richness is not population size or occupancy. Comparable effort alone does not remove detection bias or establish a biodiversity trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BIODIVERSITYImplementation: prototype Method source: DD-GBIF |
| DEC-DP07-019DP07 | Patrol deployment Compare feasible patrol coverage routes Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP07-020DP07 | Forest records Correct inconsistent forest and compartment classifications Inputs and approvalForest ID; Forest ID evidence reference; compartment label; compartment label evidence reference; source definition; source definition evidence reference; legal edition; legal edition evidence reference; steward mapping; steward mapping evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Forester, inventory specialist and biodiversity specialist. Authorized decision-maker for Forest Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-001DP08 | Rainfall anomalies Prepare reviewed rainfall-anomaly evidence Inputs and approvalComparable reference value [mm]; Later/comparison value [mm] Result: Difference; Relative change (mm; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-002DP08 | Dry and wet spells Identify prolonged rainfall spells requiring advisory review Inputs and approvalObservation day; Daily rainfall [mm]; Example dry-day threshold [mm]; Day classified as dry when rainfall Result: Daily rainfall (mm) DOMAIN-1 / spell: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The example threshold is configurable and is not an official warning criterion. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SPELLImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-003DP08 | Station completeness Prioritize stations with incomplete observations Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-004DP08 | Drought monitoring Determine where historical rainfall supports SPI analysis Inputs and approvalComplete comparable baseline years [years]; Expected monthly observations [observations]; Valid comparable monthly observations [observations]; Proposed accumulation period; Station history and series homogeneity checked; Distribution fit and zero-rainfall handling documented Result: Baseline completeness; Missing monthly observations (%; observations) DOMAIN-1 / spi: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits WMO recommends a long rainfall record, ideally at least30 years. Readiness counts alone do not validate the fitted SPI method. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SPIImplementation: prototype Method source: S82 |
| DEC-DP08-005DP08 | Temperature extremes Investigate unusual maximum and minimum temperatures Inputs and approvalComparable reference value [°C]; Later/comparison value [°C] Result: Difference (°C) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-006DP08 | Severe weather Prepare official-warning review cases from accepted observations Inputs and approvalForecast issuance; Forecast issuance evidence reference; observed conditions; observed conditions evidence reference; affected area; affected area evidence reference; warning criteria; warning criteria evidence reference; duty officer; duty officer evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-007DP08 | Forecast verification Review forecast errors before operational changes Inputs and approvalArchived forecast rainfall [mm]; Verifying observed rainfall [mm]; Forecast lead time [hours]; Forecast issue date; Forecast valid date Result: Forecast minus observed (mm) DOMAIN-1 / forecast: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match lead, valid interval, location, variable, units and observation quality. Do not verify a forecast against data available when it was issued. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Matched-pair RMSE Environment and Climate Change Canada · Displayed RMSE equation and definitions of forecast, observation and verification count Government publication - Environment and Climate Change Canada FORECASTImplementation: prototype Method source: S75 |
| DEC-DP08-008DP08 | Seasonal forecasts Assess seasonal forecast performance across past seasons Inputs and approvalArchived probability for the defined event [fraction]; Observed event indicator [events]; Independent reference forecast probability [fraction]; Forecast issue date; Event verification date; Predefined event/category and reference basis Result: Squared probability error (0–1) DOMAIN-1 / probability-forecast: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Define one event, lead, observation category thresholds and an independent reference. Do not apply rainfall RMSE to probabilities or interpret one score as complete calibration. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Binary Brier score and skill component Japan Meteorological Agency · Sections A.3.1 and A.3.2, equations A.3.1 and A.3.3, printed page 239, PDF page 7 Government publication - Japan Meteorological Agency FORECASTImplementation: prototype Method source: DD-BRIER |
| DEC-DP08-009DP08 | Station siting Select candidate locations for observation-network expansion Inputs and approvalCoverage gaps; Coverage gaps evidence reference; terrain; terrain evidence reference; exposure; exposure evidence reference; access; access evidence reference; power; power evidence reference; communication; communication evidence reference; siting standards; siting standards evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-010DP08 | Instrument maintenance Schedule calibration and repair of weather instruments Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-011DP08 | Data homogenization Identify time series affected by station or instrument changes Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / series-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-012DP08 | Agrometeorology Prioritize agricultural advisories by crop exposure Inputs and approvalCrop calendar; Crop calendar evidence reference; weather observations; weather observations evidence reference; forecasts; forecasts evidence reference; vulnerable crop stages; vulnerable crop stages evidence reference; advisory protocol; advisory protocol evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-013DP08 | Evapotranspiration Assess weather-input fitness for agricultural water estimates Inputs and approvalRadiation; Radiation evidence reference; temperature; temperature evidence reference; humidity; humidity evidence reference; wind; wind evidence reference; reference-site metadata; reference-site metadata evidence reference; observation dates; observation dates evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-014DP08 | Marine services Refer marine forecast exceptions for specialist review Inputs and approvalWind; Wind evidence reference; waves; waves evidence reference; forecast areas; forecast areas evidence reference; vessel advisories; vessel advisories evidence reference; issue time; issue time evidence reference; approved criteria; approved criteria evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-015DP08 | Aviation services Prioritize aviation meteorological service interruptions Inputs and approvalScheduled observation window [hours]; Union of qualifying outage intervals [hours]; Eligible service requests [requests]; Failed eligible requests [requests]; Measured response time [ms] Result: Time availability; Request success; Measured response time (%; %; ms) DOMAIN-1 / reliability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits State maintenance exclusions, operating window, probe, workload and service objective. Observed response time is not a p95 claim unless the percentile is actually measured. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RELIABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-016DP08 | Lightning exposure Target awareness using verified lightning-risk evidence Inputs and approvalDistinct receptors/observations in the defined frame [units]; Distinct receptors matching the stated spatial relation [units]; Boundary edition and spatial predicate; Hazard/constraint/source class and observation period Result: Spatially matched share; Distinct matched receptors (%; units) DOMAIN-1 / point-overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-017DP08 | Climate trends Review long-term trends in homogeneous station records Inputs and approvalComparable observation [°C] Result: Observed value (°C) DOMAIN-1 / trend: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required TRENDImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-018DP08 | Observation reconciliation Investigate disagreement between nearby and reference sensors Inputs and approvalOriginal source measurement [mm]; Independent comparison measurement [mm]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (mm; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-019DP08 | Climate requests Clear delayed requests for permitted climate data Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP08-020DP08 | Forecast publication Check source rights and approval before publishing products Inputs and approvalProduct version; Product version evidence reference; forecast validity; forecast validity evidence reference; review; review evidence reference; publication authority; publication authority evidence reference; license; license evidence reference; audience; audience evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Duty meteorologist and climate/forecast verification specialist. Authorized decision-maker for Department of Meteorology; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-001DP09 | Crop economics Target export crops with weak enterprise returns Inputs and approvalSaleable output [kg]; Realized price [LKR/kg]; Variable costs [LKR]; Matching crop area [ha] Result: Enterprise gross margin; Gross margin per hectare; Variable-cost break-even price (LKR; LKR/ha; LKR/kg) DOMAIN-1 / margin: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep fixed costs, family-labour opportunity cost, taxes and financing identifiable. Gross margin is not net profit. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Enterprise gross margin Food and Agriculture Organization of the United Nations · Chapter 4, Gross margin and section 4.7.1 Institution publication - Food and Agriculture Organization of the United Nations MARGINImplementation: prototype Method source: S76 |
| DEC-DP09-002DP09 | Market opportunities Prioritize feasible export-crop market development Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-003DP09 | Post-harvest quality Select processing stages with excessive spice losses Inputs and approvalBatch input on stated moisture basis [kg]; Saleable output [kg]; Usable by-product [kg]; Closing stock [kg]; Documented transfers out [kg] Result: Unaccounted physical share; Unaccounted mass (%; kg) DOMAIN-1 / loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required LOSSImplementation: prototype Method source: S57 |
| DEC-DP09-004DP09 | Crop productivity Prioritize crop-area combinations with weak productivity Inputs and approvalHarvested crop output [kg]; Matching harvested crop area [ha] Result: Crop yield (kg/ha) DOMAIN-1 / crop-yield: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-005DP09 | Crop suitability Shortlist export crops suited to local soils and climate Inputs and approvalCrop requirements; Crop requirements evidence reference; soil; soil evidence reference; rainfall; rainfall evidence reference; temperature; temperature evidence reference; slope; slope evidence reference; shade; shade evidence reference; water access; water access evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-006DP09 | Planting materials Plan certified planting-material supply Inputs and approvalPhysical stock [plants]; Quarantined stock [plants]; Expired stock [plants]; Committed usable stock [plants]; Additional demand [plants]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (plants; plants) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-007DP09 | Plant health Investigate emerging export-crop pest and disease patterns Inputs and approvalComparable reference value [affected plants per 100 inspected]; Later/comparison value [affected plants per 100 inspected] Result: Difference; Relative change (affected plants per 100 inspected; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-008DP09 | Quality compliance Refer spice quality results outside applicable specifications Inputs and approvalParameter and applicable use; Measured result [%]; Example lower comparison bound [%]; Example upper comparison bound [%]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (%) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-009DP09 | Replanting Compare rehabilitation and replanting of ageing crop stands Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-010DP09 | Extension coverage Target export-crop growers lacking technical support Inputs and approvalRequired eligible frame [growers]; Distinct members of that frame covered [growers]; Frame members with unknown coverage [growers] Result: Verified coverage; Known uncovered; Unknown coverage (%; growers; growers) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-011DP09 | Certification readiness Review grower evidence for requested certification Inputs and approvalGrower ID; Grower ID evidence reference; scheme version; scheme version evidence reference; production records; production records evidence reference; inspections; inspections evidence reference; traceability; traceability evidence reference; nonconformities; nonconformities evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-012DP09 | Value addition Appraise investments in grading drying and processing Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP09-013DP09 | Traceability Resolve broken links from export-crop lots to farms Inputs and approvalUpstream lot/source reference; Downstream lot/batch reference; Exact upstream source version; Recorded upstream issue Result: Broken or affected lineage (items) DOMAIN-1 / lineage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-014DP09 | Harvest timing Compare harvest windows against quality and market constraints Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-015DP09 | Climate adaptation Compare shade water and soil adaptation practices Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-016DP09 | Subsidy follow-up Verify establishment outcomes after crop-development assistance Inputs and approvalOriginal cohort [plants]; Known surviving original members [plants]; Known failed original members [plants]; Original members with unknown follow-up [plants]; Replacements in a separate cohort [plants] Result: Confirmed survival lower bound; Survival upper bound; Unknown follow-up (%; %; plants) DOMAIN-1 / survival: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVIVALImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-017DP09 | Research priorities Select export-crop research questions with evidence gaps Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-018DP09 | Soil conservation Prioritize erosion control in sloping export-crop lands Inputs and approvalRainfall erosivity [MJ mm/(ha h year)]; Soil erodibility [t ha h/(ha MJ mm)]; Slope-length and steepness factor [ratio]; Cover-management factor [fraction]; Support-practice factor [fraction] Result: Estimated annual sheet/rill loss (t/ha/year) DOMAIN-1 / erosion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits This USLE factor product is not a full RUSLE2 run, measured loss, delivered sediment, gully loss or landslide forecast. Local factors and uncertainty need review. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · USLE factor product United States Department of Agriculture Forest Service · 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40 Government publication - United States Department of Agriculture Forest Service EROSIONImplementation: prototype Method source: S80 |
| DEC-DP09-019DP09 | Grower records Reconcile inconsistent crop names and varieties Inputs and approvalSource crop label; Source crop label evidence reference; scientific name; scientific name evidence reference; variety registry; variety registry evidence reference; definition; definition evidence reference; steward decision; steward decision evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP09-020DP09 | Programme evaluation Evaluate export-crop support outcomes beyond participation Inputs and approvalTreatment Enterprise gross margin before [LKR/ha]; Treatment Enterprise gross margin after [LKR/ha]; Comparison Enterprise gross margin before [LKR/ha]; Comparison Enterprise gross margin after [LKR/ha]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (LKR/ha) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Export-crop agronomist and market/quality specialist. Authorized decision-maker for Department of Export Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP10-001DP10 | Variety adoption Target district-specific rice variety extension Inputs and approvalSown hectares in the stated variety [ha]; Area with accepted observations [ha]; Native class/variety and definition edition Result: Class area; Share of selected mapped area; Class observation coverage (ha; %; %) DOMAIN-1 / variety-area: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COMPOSITIONImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-002DP10 | Irrigation classes Allocate support by rainfed and irrigated cultivation needs Inputs and approvalRequired eligible frame [farms]; Distinct members of that frame covered [farms]; Frame members with unknown coverage [farms] Result: Verified coverage; Known uncovered; Unknown coverage (%; farms; farms) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-003DP10 | Input costs Investigate high local farm production costs Inputs and approvalLabour cost [LKR]; Material/input cost [LKR]; Other non-overlapping cost [LKR]; Verified matching hectares [ha] Result: Cost per matching unit; Total cost (LKR/ha; LKR) DOMAIN-1 / cost-ha: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-004DP10 | Sowing progress Adjust extension schedules to planting progress Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-005DP10 | Provincial production Address differences between crop targets and accepted output Inputs and approvalPlanned value [kg]; Observed value [kg] Result: Difference; Relative change (kg; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-006DP10 | Pest response Prioritize local pest investigation visits Inputs and approvalPest reports; Pest reports evidence reference; verified incidence; verified incidence evidence reference; crop stage; crop stage evidence reference; affected fields; affected fields evidence reference; expert criteria; expert criteria evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-007DP10 | Extension staffing Redistribute extension effort where service demand exceeds capacity Inputs and approvalDemand in the selected period [staff hours]; Rated capacity for that period [staff hours]; Unavailable or restricted capacity [staff hours] Result: Usable capacity minus demand; Usable capacity (staff hours; staff hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-008DP10 | Seed distribution Match approved seasonal seed demand to valid stocks Inputs and approvalPhysical stock [kg seed]; Quarantined stock [kg seed]; Expired stock [kg seed]; Committed usable stock [kg seed]; Additional demand [kg seed]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (kg seed; kg seed) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-009DP10 | Soil testing Schedule sampling where fertilizer advice lacks evidence Inputs and approvalRequired eligible frame [farms]; Distinct members of that frame covered [farms]; Frame members with unknown coverage [farms] Result: Verified coverage; Known uncovered; Unknown coverage (%; farms; farms) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-010DP10 | Demonstration farms Select comparable sites for technology demonstrations Inputs and approvalCandidate farms; Candidate farms evidence reference; soil; soil evidence reference; crop; crop evidence reference; water; water evidence reference; farmer consent; farmer consent evidence reference; trial objectives; trial objectives evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-011DP10 | Training outcomes Follow up training participants reaching verified adoption Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-012DP10 | Crop damage Prioritize verification of provincial crop-loss reports Inputs and approvalIncident; Incident evidence reference; crop; crop evidence reference; affected hectares; affected hectares evidence reference; weather; weather evidence reference; field evidence; field evidence evidence reference; claim date; claim date evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-013DP10 | Mechanization access Plan shared machinery services for uncovered farming areas Inputs and approvalDemand in the selected period [machine hours]; Rated capacity for that period [machine hours]; Unavailable or restricted capacity [machine hours] Result: Usable capacity minus demand; Usable capacity (machine hours; machine hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-014DP10 | Water-saving practices Compare irrigation-management practices on equivalent farms Inputs and approvalSaleable crop output [kg]; Matching irrigation water input [m³] Result: Crop water productivity (kg/m³) DOMAIN-1 / water-productivity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-015DP10 | Diversification Shortlist locally viable alternative crop programmes Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-016DP10 | Horticulture Prioritize vegetable and fruit post-harvest support Inputs and approvalBatch input on stated moisture basis [kg]; Saleable output [kg]; Usable by-product [kg]; Closing stock [kg]; Documented transfers out [kg] Result: Unaccounted physical share; Unaccounted mass (%; kg) DOMAIN-1 / loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required LOSSImplementation: prototype Method source: S57 |
| DEC-DP10-017DP10 | Budget delivery Reconcile provincial agriculture funding and verified activities Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-018DP10 | Service inclusion Address underserved smallholder and vulnerable farmer groups Inputs and approvalRequired eligible frame [farms]; Distinct members of that frame covered [farms]; Frame members with unknown coverage [farms] Result: Verified coverage; Known uncovered; Unknown coverage (%; farms; farms) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-019DP10 | Reporting consistency Correct differences between district crop returns Inputs and approvalOriginal source measurement [kg]; Independent comparison measurement [kg]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (kg; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP10-020DP10 | Provincial outcomes Evaluate provincial agricultural programmes Inputs and approvalTreatment Crop productivity before [kg/ha]; Treatment Crop productivity after [kg/ha]; Comparison Crop productivity before [kg/ha]; Comparison Crop productivity after [kg/ha]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (kg/ha) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Provincial crop specialist and extension coordinator. Authorized decision-maker for Provincial Departments of Agriculture; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP11-001DP11 | Output verification Prioritize project outputs awaiting independent verification Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-002DP11 | Delivery performance Investigate spending ahead of verified physical progress Inputs and approvalPhased budget for the period [LKR]; Actual spending [LKR]; Planned physical progress [%]; Independently verified physical progress [%] Result: Spending against phased budget; Verified physical progress; Verified minus planned progress (%; %; percentage points) DOMAIN-1 / cost-progress: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Proposed finance/procurement example; scope confirmation pending C01/C02/C10/C11/C12 in Institution review. Not counted as accepted scope. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Proposed; awaiting scope confirmation Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-003DP11 | Reporting bottlenecks Resolve source reviews blocking required project reports Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-004DP11 | Intervention overlap Coordinate overlapping interventions at the same sites Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-005DP11 | Annual planning Compare work-plan alternatives within programme constraints Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-006DP11 | Funding commitments Identify unfunded activities and unfulfilled co-financing Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Proposed finance/procurement example; scope confirmation pending C01/C02/C10/C11/C12 in Institution review. Not counted as accepted scope. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Proposed; awaiting scope confirmation Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-007DP11 | Procurement scheduling Prioritize procurements on the implementation critical path Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Proposed finance/procurement example; scope confirmation pending C01/C02/C10/C11/C12 in Institution review. Not counted as accepted scope. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Proposed; awaiting scope confirmation Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-008DP11 | Contract performance Escalate contract milestone delays and unresolved deliverables Inputs and approvalPlanned milestone/sowing date; Observed completion/sowing date Result: Calendar date difference (days) DOMAIN-1 / dated-variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Proposed finance/procurement example; scope confirmation pending C01/C02/C10/C11/C12 in Institution review. Not counted as accepted scope. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Proposed; awaiting scope confirmation Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-009DP11 | Safeguards Refer unresolved environmental and social risks Inputs and approvalActivity scope; Activity scope evidence reference; screening; screening evidence reference; affected people; affected people evidence reference; safeguards; safeguards evidence reference; mitigations; mitigations evidence reference; reviewer; reviewer evidence reference; conditions; conditions evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-010DP11 | Grievances Escalate overdue programme grievances through approved channels Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-011DP11 | Participation equity Target gaps in access to project benefits Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-012DP11 | Change control Compare material scope-change alternatives before approval Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-013DP11 | Decision conditions Block affected work with unmet mandatory approval conditions Inputs and approvalDecision version; Decision version evidence reference; required approvals; required approvals evidence reference; conditions; conditions evidence reference; completion evidence; completion evidence evidence reference; appointed authority; appointed authority evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-014DP11 | Partner coordination Resolve dependency conflicts between implementing partners Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-015DP11 | Outcome evaluation Assess verified programme outcomes and attribution limits Inputs and approvalTreatment Verified outcome indicator before [specified outcome unit]; Treatment Verified outcome indicator after [specified outcome unit]; Comparison Verified outcome indicator before [specified outcome unit]; Comparison Verified outcome indicator after [specified outcome unit]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (specified outcome unit) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP11-016DP11 | Risk financing Compare financial consequences of implementation scenarios Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Proposed finance/procurement example; scope confirmation pending C01/C02/C10/C11/C12 in Institution review. Not counted as accepted scope. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Proposed; awaiting scope confirmation Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP11-017DP11 | Asset handover Identify assets lacking verified maintenance and ownership arrangements Inputs and approvalAsset ID; Asset ID evidence reference; acceptance; acceptance evidence reference; owner; owner evidence reference; maintenance plan; maintenance plan evidence reference; budget; budget evidence reference; training; training evidence reference; handover conditions; handover conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-018DP11 | Learning and scaling Select interventions for further testing or scaling Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-019DP11 | Evidence catalogue Correct incomplete references in reporting evidence packages Inputs and approvalEvidence ID; Evidence ID evidence reference; source version; source version evidence reference; period; period evidence reference; geography; geography evidence reference; license; license evidence reference; reviewer; reviewer evidence reference; lineage; lineage evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP11-020DP11 | Project closure Resolve outstanding financial technical and safeguard obligations Inputs and approvalClosure checklist; Closure checklist evidence reference; contracts; contracts evidence reference; finances; finances evidence reference; assets; assets evidence reference; unresolved cases; unresolved cases evidence reference; outcome evidence; outcome evidence evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. PMU monitoring lead, technical lead and finance/safeguards reviewers as relevant. Authorized decision-maker for Project Management Unit; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-001DP12 | Ecosystem change Prioritize ecosystem types with comparable extent or condition decline Inputs and approvalEarlier mapped class area [ha]; Later mapped class area [ha]; Matched area leaving the class [ha]; Matched area entering the class [ha]; Same fixed analysis extent [ha]; Native class and mapping version; Earlier observation date; Later observation date Result: Net class-area change; Relative class-area change; Gross loss from class; Gross gain to class (ha; %; ha; ha) DOMAIN-1 / land-change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Same boundary, definitions, observation basis and adequate map quality are required. Coverage changes and classification error are not proven land-use change. Example boundaries and transitions are fictional. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-002DP12 | Soil-carbon monitoring Select comparable soil-carbon monitoring locations Inputs and approvalSoil organic carbon [%]; Fine-earth bulk-density basis [t/m³]; Sample depth [m]; Coarse-fragment volume fraction [%]; Sampling depth, design and density convention Result: Soil-carbon stock (t C/ha) DOMAIN-1 / soilcarbon: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A carbon concentration is not a stock. Change comparisons require consistent depth/mass, sampling, density convention and uncertainty review. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Soil-carbon stock with volume correction Intergovernmental Panel on Climate Change · Section 4.3.3.5.4, equation 4.3.3, printed page 4.106, PDF page 18 Institution publication - Intergovernmental Panel on Climate Change SOILCARBONImplementation: prototype Method source: S79 |
| DEC-DP12-003DP12 | Biodiversity evidence Improve surveys with insufficient sampling effort Inputs and approvalObserved distinct species [species]; Survey effort [hours]; Survey protocol and version; Survey season and taxonomic scope; All planned survey visits completed Result: Observed richness; Recorded effort (species; hours) DOMAIN-1 / biodiversity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Observed richness is not population size or occupancy. Comparable effort alone does not remove detection bias or establish a biodiversity trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BIODIVERSITYImplementation: prototype Method source: DD-GBIF |
| DEC-DP12-004DP12 | Forest-carbon estimates Select defensible evidence for forest-carbon assessment Inputs and approvalEarlier carbon density [t C/ha]; Later carbon density [t C/ha]; Same inventory area [ha]; Included pools and allometry references Result: Carbon stock change; Carbon-density change (t C; t C/ha) DOMAIN-1 / carbon: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Inventory plots, allometry and uncertainty remain required evidence. Stock change is not an issued carbon credit, additionality test or payable service. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Carbon stock-difference component Intergovernmental Panel on Climate Change · Section 2.3.1.1, equation 2.8, stock-difference method Institution publication - Intergovernmental Panel on Climate Change CARBONImplementation: prototype Method source: S79 |
| DEC-DP12-005DP12 | Landscape restoration Compare landscape restoration opportunities Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-006DP12 | Agroforestry design Compare locally suitable tree-crop combinations Inputs and approvalSpecies traits; Species traits evidence reference; crop needs; crop needs evidence reference; soil; soil evidence reference; rainfall; rainfall evidence reference; shade; shade evidence reference; farmer objectives; farmer objectives evidence reference; market access; market access evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-007DP12 | Research design Select study designs capable of answering intervention questions Inputs and approvalHypothesis; Hypothesis evidence reference; treatment; treatment evidence reference; comparison; comparison evidence reference; baseline; baseline evidence reference; sample size; sample size evidence reference; confounders; confounders evidence reference; outcomes; outcomes evidence reference Result: Study evidence gaps (items) DOMAIN-1 / study-design: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required IMPACTImplementation: prototype Method source: S92 |
| DEC-DP12-008DP12 | Sampling allocation Allocate field effort across environmental strata Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-009DP12 | Data harmonization Resolve incompatible ecological concepts before combining datasets Inputs and approvalSource variables; Source variables evidence reference; definitions; definitions evidence reference; units; units evidence reference; methods; methods evidence reference; taxonomic references; taxonomic references evidence reference; steward review; steward review evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-010DP12 | Model validation Require independent validation of landscape models Inputs and approvalEarlier/source value [m³/season]; Independently reproduced value [m³/season]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [m³/season]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (m³/season; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-011DP12 | Hydrological evidence Assess whether land-management changes affect water outcomes Inputs and approvalTreatment Seasonal streamflow volume before [m³/season]; Treatment Seasonal streamflow volume after [m³/season]; Comparison Seasonal streamflow volume before [m³/season]; Comparison Seasonal streamflow volume after [m³/season]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (m³/season) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP12-012DP12 | Ecosystem services Prepare separate physical service accounts Inputs and approvalOpening ecosystem extent [ha]; Extent additions [ha]; Extent reductions [ha]; Measured service flow in the period [physical service units]; Service definition and flow unit; Separate monetary valuation method/price year Result: Closing ecosystem extent; Physical service flow (ha; physical service units) DOMAIN-1 / account: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep extent, condition, physical service flows and monetary accounts distinct. A defensible valuation method, price year and accounting boundary are needed for monetary results. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCOUNTImplementation: prototype Method source: S58 |
| DEC-DP12-013DP12 | Trade-offs Compare livelihood conservation and water-management alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-014DP12 | Carbon uncertainty Prioritize measurements driving carbon-estimate uncertainty Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-015DP12 | Community knowledge Resolve conflicting scientific and community observations Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-016DP12 | Gender and inclusion Review whose knowledge and outcomes research represents Inputs and approvalRequired eligible frame [participants]; Distinct members of that frame covered [participants]; Frame members with unknown coverage [participants] Result: Verified coverage; Known uncovered; Unknown coverage (%; participants; participants) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-017DP12 | Long-term monitoring Sustain observation coverage beyond initial field campaigns Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-018DP12 | Open science Determine which research outputs can be shared Inputs and approvalDataset rights; Dataset rights evidence reference; participant consent; participant consent evidence reference; sensitive species; sensitive species evidence reference; license; license evidence reference; publication approval; publication approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-019DP12 | Knowledge products Prioritize evidence products requested by decision makers Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP12-020DP12 | Research translation Evaluate uptake and consequences of research recommendations Inputs and approvalTreatment Verified recommendation uptake before [%]; Treatment Verified recommendation uptake after [%]; Comparison Verified recommendation uptake before [%]; Comparison Verified recommendation uptake after [%]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (%) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Relevant research lead, statistician and data steward. Authorized decision-maker for CIFOR-ICRAF and Research Partners; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP13-001DP13 | Field assignments Follow up assignments lacking accepted field evidence Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-002DP13 | Monitoring coverage Schedule visits to unobserved monitoring sites Inputs and approvalRequired eligible frame [visits]; Distinct members of that frame covered [visits]; Frame members with unknown coverage [visits] Result: Verified coverage; Known uncovered; Unknown coverage (%; visits; visits) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-003DP13 | Community cases Prioritize unresolved community cases by agreed urgency Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-004DP13 | Spatial verification Resolve missing or conflicting locations of field activities Inputs and approvalMeasured separation between reported locations [m]; Reported source positional accuracy [m]; Reported comparison positional accuracy [m]; Coordinate reference and transformation evidence Result: Location separation (m) DOMAIN-1 / location-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-005DP13 | Watershed plans Compare community priorities for sub-watershed actions Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-006DP13 | Intervention scheduling Coordinate field works around seasonal and resource limits Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-007DP13 | Restoration follow-up Target visits to restoration cohorts with uncertain survival Inputs and approvalOriginal cohort [plants]; Known surviving original members [plants]; Known failed original members [plants]; Original members with unknown follow-up [plants]; Replacements in a separate cohort [plants] Result: Confirmed survival lower bound; Survival upper bound; Unknown follow-up (%; %; plants) DOMAIN-1 / survival: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVIVALImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-008DP13 | Conservation works Verify completed soil and water conservation treatments Inputs and approvalWork ID; Work ID evidence reference; design; design evidence reference; measured dimensions; measured dimensions evidence reference; location; location evidence reference; inspection; inspection evidence reference; acceptance conditions; acceptance conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-009DP13 | Water problems Refer local water-shortage evidence to responsible institutions Inputs and approvalPlanned value [m³/day]; Observed value [m³/day] Result: Difference; Relative change (m³/day; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-010DP13 | Farmer practice uptake Follow up adoption after field demonstrations Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-011DP13 | Local hazards Escalate verified hazard observations to competent authorities Inputs and approvalObservation; Observation evidence reference; location; location evidence reference; time; time evidence reference; photographs; photographs evidence reference; exposed assets; exposed assets evidence reference; escalation protocol; escalation protocol evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-012DP13 | Team workload Redistribute assignments where field workload exceeds capacity Inputs and approvalDemand in the selected period [staff hours]; Rated capacity for that period [staff hours]; Unavailable or restricted capacity [staff hours] Result: Usable capacity minus demand; Usable capacity (staff hours; staff hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-013DP13 | Safeguard conditions Check safeguards before starting field interventions Inputs and approvalSite approval; Site approval evidence reference; consent; consent evidence reference; safeguards; safeguards evidence reference; unresolved conditions; unresolved conditions evidence reference; evidence; evidence evidence reference; responsible reviewer; responsible reviewer evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-014DP13 | Equipment logistics Plan shared field equipment and supply availability Inputs and approvalPhysical stock [equipment units]; Quarantined stock [equipment units]; Expired stock [equipment units]; Committed usable stock [equipment units]; Additional demand [equipment units]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (equipment units; equipment units) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-015DP13 | Community consultation Resolve objections to sub-watershed implementation plans Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-016DP13 | Progress exceptions Investigate deviations from agreed field work plans Inputs and approvalPlanned value [work units]; Observed value [work units] Result: Difference; Relative change (work units; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-017DP13 | Access routes Select feasible routes for field monitoring visits Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-018DP13 | Support duplication Review overlapping field support to the same participants Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-019DP13 | Field form quality Correct incomplete field records before review Inputs and approvalRecord ID; Record ID evidence reference; required fields; required fields evidence reference; units; units evidence reference; timestamps; timestamps evidence reference; source; source evidence reference; attachments; attachments evidence reference; validation; validation evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP13-020DP13 | Local outcomes Assess whether completed interventions improved local outcomes Inputs and approvalTreatment Verified local outcome indicator before [specified outcome unit]; Treatment Verified local outcome indicator after [specified outcome unit]; Comparison Verified local outcome indicator before [specified outcome unit]; Comparison Verified local outcome indicator after [specified outcome unit]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (specified outcome unit) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Delivery-team technical lead and community/safeguards reviewer. Authorized decision-maker for Sub-Watershed Integrated Delivery Teams; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP14-001DP14 | Boundary selection Select the authoritative survey edition for a case Inputs and approvalBoundary ID; Boundary ID evidence reference; legal source; legal source evidence reference; survey date; survey date evidence reference; scale; scale evidence reference; supersession; supersession evidence reference; intended use; intended use evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-002DP14 | Parcel reconciliation Investigate differences in registered and surveyed parcel area Inputs and approvalOriginal source measurement [ha]; Independent comparison measurement [ha]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (ha; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-003DP14 | Terrain screening Identify terrain requiring detailed site survey Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-004DP14 | Field verification Prioritize features needing ground verification Inputs and approvalFeature ID; Feature ID evidence reference; source date; source date evidence reference; positional uncertainty; positional uncertainty evidence reference; reported mismatch; reported mismatch evidence reference; survey request; survey request evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-005DP14 | Cadastral backlog Prioritize pending cadastral survey requests Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-006DP14 | Control network Schedule geodetic control inspection and restoration Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-007DP14 | Coordinate transformation Validate transformations before combining spatial datasets Inputs and approvalEarlier/source value [m]; Independently reproduced value [m]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [m]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (m; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-008DP14 | Survey accuracy Refer surveys failing approved accuracy specifications Inputs and approvalParameter and applicable use; Measured result [m]; Example lower comparison bound [m]; Example upper comparison bound [m]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (m) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-009DP14 | Aerial acquisition Schedule aerial imagery for priority mapping gaps Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-010DP14 | Boundary disputes Support formal review of conflicting boundary evidence Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-011DP14 | Topographic updates Prioritize map sheets with significant feature changes Inputs and approvalEarlier/source value [changed features]; Later/comparison value [changed features] Result: Difference; Relative change (changed features; %) DOMAIN-1 / change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-012DP14 | Survey permissions Check required access and survey approvals Inputs and approvalSurvey purpose; Survey purpose evidence reference; property access; property access evidence reference; permissions; permissions evidence reference; restrictions; restrictions evidence reference; expiry; expiry evidence reference; authority; authority evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-013DP14 | Elevation products Select elevation datasets fit for intended analysis Inputs and approvalResolution; Resolution evidence reference; vertical datum; vertical datum evidence reference; accuracy; accuracy evidence reference; acquisition date; acquisition date evidence reference; coverage; coverage evidence reference; intended scale; intended scale evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-014DP14 | Encroachment surveys Identify areas needing authoritative boundary re-establishment Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-015DP14 | Survey resources Balance crew instrument and travel requirements Inputs and approvalDemand in the selected period [crew days]; Rated capacity for that period [crew days]; Unavailable or restricted capacity [crew days] Result: Usable capacity minus demand; Usable capacity (crew days; crew days) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-016DP14 | Map delivery Track survey products through independent checking Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-017DP14 | Land information Resolve inconsistent parcel identifiers across institutions Inputs and approvalCadastral ID; Cadastral ID evidence reference; land-register ID; land-register ID evidence reference; geometry; geometry evidence reference; legal evidence; legal evidence evidence reference; source owner; source owner evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-018DP14 | Survey cost Compare costs for equivalent survey work types Inputs and approvalLabour cost [LKR]; Material/input cost [LKR]; Other non-overlapping cost [LKR]; Verified output or service quantity [survey units]; Equivalent survey work/terrain class Result: Cost per matching unit; Total cost (LKR/survey unit; LKR) DOMAIN-1 / survey-cost: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-019DP14 | Map distribution Clear delayed requests for permitted map products Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP14-020DP14 | Historical integrity Retain superseded survey editions with traceable revisions Inputs and approvalEarlier/source value [features]; Independently reproduced value [features]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [features]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (features; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized survey professional and geospatial quality reviewer. Authorized decision-maker for Survey Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-001DP15 | Published services Prioritize unavailable GIS services by user need Inputs and approvalScheduled observation window [hours]; Union of qualifying outage intervals [hours]; Eligible service requests [requests]; Failed eligible requests [requests]; Measured response time [ms] Result: Time availability; Request success; Measured response time (%; %; ms) DOMAIN-1 / reliability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits State maintenance exclusions, operating window, probe, workload and service objective. Observed response time is not a p95 claim unless the percentile is actually measured. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RELIABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-002DP15 | Metadata currency Request updates for outdated source metadata Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-003DP15 | Semantic conflicts Resolve conflicting classifications between publishers Inputs and approvalSource class; Source class evidence reference; definition; definition evidence reference; units; units evidence reference; reference vocabulary; reference vocabulary evidence reference; mapping evidence; mapping evidence evidence reference; steward; steward evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-004DP15 | Withdrawn rights Restrict products using withdrawn source permissions Inputs and approvalSource license; Source license evidence reference; derivative lineage; derivative lineage evidence reference; withdrawal date; withdrawal date evidence reference; audience; audience evidence reference; cached product IDs; cached product IDs evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-005DP15 | Service onboarding Check institutional agreements before publishing a source Inputs and approvalProvider identity; Provider identity evidence reference; exchange agreement; exchange agreement evidence reference; permission scope; permission scope evidence reference; classification; classification evidence reference; effective dates; effective dates evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-006DP15 | Coordinate standards Reject unverified spatial-reference transformations Inputs and approvalEarlier/source value [m]; Independently reproduced value [m]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [m]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (m; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-007DP15 | National coverage Prioritize gaps in fundamental geospatial datasets Inputs and approvalRequired eligible frame [theme-area pairs]; Distinct members of that frame covered [theme-area pairs]; Frame members with unknown coverage [theme-area pairs] Result: Verified coverage; Known uncovered; Unknown coverage (%; theme-area pairs; theme-area pairs) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-008DP15 | Geometry quality Route invalid or inconsistent geometries for correction Inputs and approvalFeature ID; Feature ID evidence reference; geometry validity; geometry validity evidence reference; topology rule; topology rule evidence reference; duplicates; duplicates evidence reference; source edition; source edition evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-009DP15 | Service performance Identify GIS endpoints missing approved response targets Inputs and approvalScheduled observation window [hours]; Union of qualifying outage intervals [hours]; Eligible service requests [requests]; Failed eligible requests [requests]; Measured response time [ms] Result: Time availability; Request success; Measured response time (%; %; ms) DOMAIN-1 / reliability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits State maintenance exclusions, operating window, probe, workload and service objective. Observed response time is not a p95 claim unless the percentile is actually measured. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RELIABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-010DP15 | Schema changes Review downstream effects of source schema revisions Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / schema-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-011DP15 | Data lineage Identify products lacking traceable source versions Inputs and approvalProduct ID; Product ID evidence reference; source IDs; source IDs evidence reference; transformations; transformations evidence reference; edition dates; edition dates evidence reference; permissions; permissions evidence reference; hashes; hashes evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-012DP15 | Duplicate catalogues Consolidate duplicate catalogue references without copying data Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-013DP15 | Sensitive layers Determine safe access and aggregation for restricted layers Inputs and approvalClassification; Classification evidence reference; coordinates; coordinates evidence reference; intended purpose; intended purpose evidence reference; rights; rights evidence reference; approved aggregation; approved aggregation evidence reference; audience; audience evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-014DP15 | Interoperability Prioritize services failing documented exchange requirements Inputs and approvalService specification; Service specification evidence reference; supported formats; supported formats evidence reference; metadata; metadata evidence reference; coordinate system; coordinate system evidence reference; sample requests; sample requests evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-015DP15 | Incident response Assign source-feed failures to accountable custodians Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-016DP15 | Update scheduling Coordinate shared-layer refreshes with consumers Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-017DP15 | Catalogue discovery Improve discovery of poorly described geospatial resources Inputs and approvalDataset title; Dataset title evidence reference; keywords; keywords evidence reference; geography; geography evidence reference; period; period evidence reference; entity definition; entity definition evidence reference; source owner; source owner evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-018DP15 | Spatial joins Verify cross-agency joins before publishing combined analyses Inputs and approvalEarlier/source value [matched records]; Independently reproduced value [matched records]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [matched records]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (matched records; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-019DP15 | Usage requests Prioritize dataset requests using recorded service demand Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP15-020DP15 | Disaster resilience Test recovery of essential catalogue and service metadata Inputs and approvalScheduled observation window [hours]; Union of qualifying outage intervals [hours]; Eligible service requests [requests]; Failed eligible requests [requests]; Measured response time [ms] Result: Time availability; Request success; Measured response time (%; %; ms) DOMAIN-1 / reliability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits State maintenance exclusions, operating window, probe, workload and service objective. Observed response time is not a p95 claim unless the percentile is actually measured. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geospatial custodian, metadata steward and access/security reviewer. Authorized decision-maker for National Spatial Data Infrastructure; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RELIABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-001DP16 | Affected households Prioritize districts with verified disaster impacts Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-002DP16 | Damage and loss Direct sector assessments where losses are greatest Inputs and approvalDamaged asset quantity [asset units]; Repair/replacement cost per matching unit [LKR/unit]; Interrupted service/production flow value [LKR/period]; Price year and flow interruption period Result: Estimated asset damage; Interrupted flow value (LKR; LKR/period) DOMAIN-1 / damage-loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-003DP16 | Safe centres Address safe-centre capacity and accessibility gaps Inputs and approvalDemand in the selected period [places]; Rated capacity for that period [places]; Unavailable or restricted capacity [places] Result: Usable capacity minus demand; Usable capacity (places; places) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-004DP16 | Recovery funding Target documented recovery needs lacking confirmed funding Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-005DP16 | Warning dissemination Identify communities missing authorized warnings Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-006DP16 | Evacuation planning Compare feasible evacuation routes and shelter access Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-007DP16 | Emergency resources Allocate response resources against assessed needs Inputs and approvalDemand in the selected period [places]; Rated capacity for that period [places]; Unavailable or restricted capacity [places] Result: Usable capacity minus demand; Usable capacity (places; places) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-008DP16 | Relief distribution Review overlapping or missing relief deliveries Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-009DP16 | Relief stocks Prevent critical shortages in emergency stores Inputs and approvalPhysical stock [packs]; Quarantined stock [packs]; Expired stock [packs]; Committed usable stock [packs]; Additional demand [packs]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (packs; packs) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-010DP16 | Preparedness drills Resolve failures identified during preparedness exercises Inputs and approvalExercise scenario; Exercise scenario evidence reference; required actions; required actions evidence reference; response times; response times evidence reference; observed failures; observed failures evidence reference; corrective owner; corrective owner evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-011DP16 | Risk reduction Compare mitigation proposals for exposed communities Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-012DP16 | Critical facilities Prioritize schools hospitals and utilities for risk assessment Inputs and approvalDistinct receptors/observations in the defined frame [units]; Distinct receptors matching the stated spatial relation [units]; Boundary edition and spatial predicate; Hazard/constraint/source class and observation period Result: Spatially matched share; Distinct matched receptors (%; units) DOMAIN-1 / point-overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-013DP16 | Rapid assessments Identify areas awaiting reliable rapid damage assessments Inputs and approvalRequired eligible frame [assessments]; Distinct members of that frame covered [assessments]; Frame members with unknown coverage [assessments] Result: Verified coverage; Known uncovered; Unknown coverage (%; assessments; assessments) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-014DP16 | Response coordination Resolve incompatible assignments across response agencies Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-015DP16 | Recovery progress Escalate delayed reconstruction and rehabilitation work Inputs and approvalPlanned milestone/sowing date; Observed completion/sowing date Result: Calendar date difference (days) DOMAIN-1 / dated-variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-016DP16 | Impact trends Review changing disaster impacts across comparable events Inputs and approvalComparable observation [affected households per 1000 exposed] Result: Observed value (affected households per 1000 exposed) DOMAIN-1 / trend: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required TRENDImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-017DP16 | Contingency plans Check whether local contingency plans remain usable Inputs and approvalPlan edition; Plan edition evidence reference; hazard scenarios; hazard scenarios evidence reference; contacts; contacts evidence reference; resources; resources evidence reference; drills; drills evidence reference; approval dates; approval dates evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-018DP16 | Public information Verify authority and validity before publishing alerts Inputs and approvalIssuing authority; Issuing authority evidence reference; warning version; warning version evidence reference; affected area; affected area evidence reference; expiry; expiry evidence reference; publication approval; publication approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP16-019DP16 | Response evaluation Assess response effectiveness and unintended consequences Inputs and approvalTreatment Verified response completion before [%]; Treatment Verified response completion after [%]; Comparison Verified response completion before [%]; Comparison Verified response completion after [%]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (%) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP16-020DP16 | Incident records Reconcile duplicate disaster incident reports Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Disaster operations coordinator and relevant hazard/relief specialist. Authorized decision-maker for Disaster Management Centre; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-001DP17 | Site clearance Refer proposed sites overlapping landslide hazard zones Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-002DP17 | Hazard-map updates Prioritize zones with outdated or incomplete hazard evidence Inputs and approvalMap coverage; Map coverage evidence reference; edition date; edition date evidence reference; new incidents; new incidents evidence reference; terrain changes; terrain changes evidence reference; survey need; survey need evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-003DP17 | Asset exposure Prioritize exposed assets for site-specific investigation Inputs and approvalDistinct receptors/observations in the defined frame [units]; Distinct receptors matching the stated spatial relation [units]; Boundary edition and spatial predicate; Hazard/constraint/source class and observation period Result: Spatially matched share; Distinct matched receptors (%; units) DOMAIN-1 / point-overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-004DP17 | Rainfall investigations Investigate rainfall patterns associated with landslides Inputs and approvalComparable observation [mm] Result: Observed value (mm) DOMAIN-1 / trend: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required TRENDImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-005DP17 | Slope inspections Escalate observed cracks movement and drainage defects Inputs and approvalSlope ID; Slope ID evidence reference; movement observations; movement observations evidence reference; cracks; cracks evidence reference; seepage; seepage evidence reference; dated inspection; dated inspection evidence reference; approved limits; approved limits evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-006DP17 | Monitoring systems Repair failed landslide-monitoring instruments Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-007DP17 | Slope stabilization Compare engineering mitigation alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-008DP17 | Relocation assessment Refer relocation alternatives for competent determination Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-009DP17 | Construction conditions Verify compliance with site-clearance conditions Inputs and approvalClearance version; Clearance version evidence reference; condition checklist; condition checklist evidence reference; construction evidence; construction evidence evidence reference; inspection dates; inspection dates evidence reference; engineer; engineer evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-010DP17 | Geotechnical evidence Resolve conflicting ground-investigation results Inputs and approvalOriginal source measurement [mm]; Independent comparison measurement [mm]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (mm; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-011DP17 | Early warning evidence Prepare technical review of landslide-warning conditions Inputs and approvalRainfall; Rainfall evidence reference; soil moisture; soil moisture evidence reference; movement; movement evidence reference; approved thresholds; approved thresholds evidence reference; forecast; forecast evidence reference; duty authority; duty authority evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-012DP17 | Laboratory workload Prioritize delayed geotechnical testing requests Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-013DP17 | Road slopes Prioritize assessment of unstable road cuts Inputs and approvalRoad segment; Road segment evidence reference; slope condition; slope condition evidence reference; traffic exposure; traffic exposure evidence reference; drainage; drainage evidence reference; failure history; failure history evidence reference; access; access evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-014DP17 | Post-event inspection Schedule investigations after reported slope failures Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-015DP17 | Drainage remediation Compare options to reduce slope-related drainage problems Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-016DP17 | Model validation Require validation of landslide susceptibility models Inputs and approvalEarlier/source value [probability]; Independently reproduced value [probability]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [probability]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (probability; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-017DP17 | Mitigation outcomes Evaluate stabilization performance after completion Inputs and approvalTreatment Measured slope displacement before [mm]; Treatment Measured slope displacement after [mm]; Comparison Measured slope displacement before [mm]; Comparison Measured slope displacement after [mm]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (mm) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP17-018DP17 | Land-use advice Identify developments needing additional terrain investigation Inputs and approvalDevelopment footprint; Development footprint evidence reference; geology; geology evidence reference; slope; slope evidence reference; hydrology; hydrology evidence reference; hazard edition; hazard edition evidence reference; uncertainty; uncertainty evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-019DP17 | Community awareness Target exposed communities missing preparedness guidance Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP17-020DP17 | Case administration Clear incomplete landslide assessment applications Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geotechnical/landslide specialist and authorized technical reviewer. Authorized decision-maker for National Building Research Organisation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-001DP18 | Water pollution Investigate water samples exceeding applicable limits Inputs and approvalParameter and applicable use; Measured result [pH]; Example lower comparison bound [pH]; Example upper comparison bound [pH]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (pH) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-002DP18 | Sampling coverage Prioritize river stretches lacking recent samples Inputs and approvalRequired eligible frame [samples]; Distinct members of that frame covered [samples]; Frame members with unknown coverage [samples] Result: Verified coverage; Known uncovered; Unknown coverage (%; samples; samples) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-003DP18 | Mitigation compliance Follow up unverified environmental mitigation obligations Inputs and approvalPermit or approval; Permit or approval evidence reference; condition; condition evidence reference; due date; due date evidence reference; inspection; inspection evidence reference; compliance evidence; compliance evidence evidence reference; owner; owner evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-004DP18 | Water anomalies Investigate unusual changes in water-quality observations Inputs and approvalComparable reference value [mg/L]; Later/comparison value [mg/L] Result: Difference; Relative change (mg/L; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-005DP18 | Environmental licensing Refer complete license applications to the competent authority Inputs and approvalActivity classification; Activity classification evidence reference; application; application evidence reference; inspection; inspection evidence reference; current rules; current rules evidence reference; required documents; required documents evidence reference; conditions; conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S20, S21 Context alone does not validate the formula. |
| DEC-DP18-006DP18 | License renewal Prioritize licenses nearing expiry with unresolved conditions Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-007DP18 | Environmental assessment Screen project proposals for required assessment pathways Inputs and approvalProject type; Project type evidence reference; location; location evidence reference; scale; scale evidence reference; sensitive areas; sensitive areas evidence reference; current criteria; current criteria evidence reference; authority; authority evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S20, S21 Context alone does not validate the formula. |
| DEC-DP18-008DP18 | Air pollution Investigate measured air-quality departures from applicable limits Inputs and approvalParameter and applicable use; Measured result [µg/m³]; Example lower comparison bound [µg/m³]; Example upper comparison bound [µg/m³]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (µg/m³) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-009DP18 | Noise complaints Prioritize investigation of evidence-supported noise complaints Inputs and approvalParameter and applicable use; Measured result [dB(A)]; Example lower comparison bound [dB(A)]; Example upper comparison bound [dB(A)]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (dB(A)) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-010DP18 | Industrial effluent Target facilities with unresolved effluent-control failures Inputs and approvalFacility; Facility evidence reference; discharge; discharge evidence reference; permit conditions; permit conditions evidence reference; sample results; sample results evidence reference; treatment controls; treatment controls evidence reference; inspection; inspection evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-011DP18 | Waste management Compare waste collection treatment and disposal options Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-012DP18 | Hazardous waste Review traceability of hazardous-waste transfers Inputs and approvalUpstream lot/source reference; Downstream lot/batch reference; Exact upstream source version; Recorded upstream issue Result: Broken or affected lineage (items) DOMAIN-1 / lineage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-013DP18 | Wetland conservation Refer development pressure overlapping protected wetland evidence Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-014DP18 | Public complaints Escalate unresolved pollution complaints Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-015DP18 | Inspection targeting Schedule inspections by approved pollution-risk priorities Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-016DP18 | Incident response Coordinate investigation of reported pollution incidents Inputs and approvalIncident; Incident evidence reference; pollutant; pollutant evidence reference; location; location evidence reference; exposed receptors; exposed receptors evidence reference; current controls; current controls evidence reference; response authority; response authority evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-017DP18 | Environmental education Target awareness programmes to documented compliance gaps Inputs and approvalRequired eligible frame [samples]; Distinct members of that frame covered [samples]; Frame members with unknown coverage [samples] Result: Verified coverage; Known uncovered; Unknown coverage (%; samples; samples) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-018DP18 | Restoration outcomes Assess environmental recovery after remedial works Inputs and approvalTreatment Selected water-quality parameter before [mg/L]; Treatment Selected water-quality parameter after [mg/L]; Comparison Selected water-quality parameter before [mg/L]; Comparison Selected water-quality parameter after [mg/L]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (mg/L) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP18-019DP18 | Laboratory evidence Review sample custody and analytical validity before action Inputs and approvalSample ID; Sample ID evidence reference; custody; custody evidence reference; holding time; holding time evidence reference; method; method evidence reference; calibration; calibration evidence reference; blanks; blanks evidence reference; accreditation; accreditation evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP18-020DP18 | Environmental records Harmonize classifications without altering source meanings Inputs and approvalSource activity labels; Source activity labels evidence reference; current reference list; current reference list evidence reference; definition; definition evidence reference; edition; edition evidence reference; steward review; steward review evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Environmental specialist, laboratory reviewer and regulatory officer. Authorized decision-maker for Central Environmental Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-001DP19 | Survey coverage Improve comparable biodiversity surveys in protected areas Inputs and approvalObserved distinct species [species]; Survey effort [hours]; Survey protocol and version; Survey season and taxonomic scope; All planned survey visits completed Result: Observed richness; Recorded effort (species; hours) DOMAIN-1 / biodiversity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Observed richness is not population size or occupancy. Comparable effort alone does not remove detection bias or establish a biodiversity trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BIODIVERSITYImplementation: prototype Method source: DD-GBIF |
| DEC-DP19-002DP19 | Wildlife incidents Prioritize unresolved wildlife conflict and rescue cases Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-003DP19 | Habitat exposure Identify threatened-species habitats requiring protection review Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-004DP19 | Threat reduction Refer candidate conservation actions for specialist threat assessment Inputs and approvalSpecies range; Species range evidence reference; threats; threats evidence reference; action feasibility; action feasibility evidence reference; threat reduction evidence; threat reduction evidence evidence reference; uncertainty; uncertainty evidence reference Result: Evidence gaps (items) DOMAIN-1 / star: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required STARImplementation: prototype Method source: S71 |
| DEC-DP19-005DP19 | Human-elephant conflict Compare locally evidenced coexistence interventions Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-006DP19 | Fence maintenance Prioritize defects in approved protective fences Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-007DP19 | Wildlife corridors Review proposed activities affecting habitat connectivity Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-008DP19 | Poaching response Assign verified illegal-activity observations for authorized investigation Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-009DP19 | Patrol coverage Compare patrol routes for permitted priority areas Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-010DP19 | Invasive species Select invasive-species management priorities Inputs and approvalSpecies; Species evidence reference; occupied area; occupied area evidence reference; spread; spread evidence reference; ecological impact; ecological impact evidence reference; treatment options; treatment options evidence reference; uncertainty; uncertainty evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-011DP19 | Visitor management Review visitor pressure against approved protected-area capacity Inputs and approvalDemand in the selected period [places]; Rated capacity for that period [places]; Unavailable or restricted capacity [places] Result: Usable capacity minus demand; Usable capacity (places; places) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-012DP19 | Research permissions Check research proposals against current permit requirements Inputs and approvalResearch proposal; Research proposal evidence reference; species; species evidence reference; methods; methods evidence reference; site; site evidence reference; ethics; ethics evidence reference; requested collections; requested collections evidence reference; conditions; conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S22, S23, S45 Context alone does not validate the formula. |
| DEC-DP19-013DP19 | Sensitive information Determine safe release of wildlife location data Inputs and approvalSpecies sensitivity; Species sensitivity evidence reference; coordinates; coordinates evidence reference; purpose; purpose evidence reference; rights; rights evidence reference; aggregation policy; aggregation policy evidence reference; approval; approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-014DP19 | Habitat restoration Compare restoration actions for degraded wildlife habitats Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-015DP19 | Population monitoring Review population trends using comparable survey effort Inputs and approvalObserved distinct species [species]; Survey effort [hours]; Survey protocol and version; Survey season and taxonomic scope; All planned survey visits completed Result: Observed richness; Recorded effort (species; hours) DOMAIN-1 / biodiversity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Observed richness is not population size or occupancy. Comparable effort alone does not remove detection bias or establish a biodiversity trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BIODIVERSITYImplementation: prototype Method source: DD-GBIF |
| DEC-DP19-016DP19 | Wildlife health Refer unusual mortality or illness clusters to specialists Inputs and approvalComparable reference value [cases]; Later/comparison value [cases] Result: Difference; Relative change (cases; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-017DP19 | Rescue capacity Allocate licensed rescue resources against current demand Inputs and approvalDemand in the selected period [team hours]; Rated capacity for that period [team hours]; Unavailable or restricted capacity [team hours] Result: Usable capacity minus demand; Usable capacity (team hours; team hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-018DP19 | Community outreach Target conflict-affected communities lacking support Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP19-019DP19 | Conservation effectiveness Evaluate conservation outcomes and adverse effects Inputs and approvalTreatment Comparable habitat-condition indicator before [specified condition unit]; Treatment Comparable habitat-condition indicator after [specified condition unit]; Comparison Comparable habitat-condition indicator before [specified condition unit]; Comparison Comparable habitat-condition indicator after [specified condition unit]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (specified condition unit) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP19-020DP19 | Protected-area records Resolve conflicting protected-area and habitat labels Inputs and approvalBoundary source; Boundary source evidence reference; legal edition; legal edition evidence reference; area name; area name evidence reference; habitat classification; habitat classification evidence reference; custodian; custodian evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Wildlife ecologist, protected-area manager and veterinary specialist where needed. Authorized decision-maker for Department of Wildlife Conservation; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-001DP20 | Agricultural patterns Identify crop variety and irrigation patterns needing analysis Inputs and approvalFinal design weight [weight]; Indicator for the defined classification [0 or1]; Stratum and primary sampling unit Result: Observed variable (0 or1) DOMAIN-1 / weighted-proportion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Weighted estimation component United Nations Statistics Division · Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting Institution publication - United Nations Statistics Division SURVEYImplementation: prototype Method source: S91 |
| DEC-DP20-002DP20 | Poverty reporting Select defensible geographic poverty and income comparisons Inputs and approvalFinal design weight [weight]; Observed variable [LKR/household]; Stratum and primary sampling unit Result: Observed variable (LKR/household) DOMAIN-1 / survey: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Weighted estimation component United Nations Statistics Division · Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting Institution publication - United Nations Statistics Division SURVEYImplementation: prototype Method source: S91 |
| DEC-DP20-003DP20 | Small-area reporting Determine whether estimates support district or divisional reporting Inputs and approvalResponding sample units [selected units]; Design-weighted estimate [estimate units]; Design-based standard error [estimate units]; Example maximum relative standard error [%]; Variance method, strata and cluster reference Result: Relative standard error (%) DOMAIN-1 / survey-precision: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVEYImplementation: prototype Method source: S91 |
| DEC-DP20-004DP20 | Statistical revisions Identify publications affected by revised statistical series Inputs and approvalEarlier/source value [estimate units]; Later/comparison value [estimate units] Result: Difference; Relative change (estimate units; %) DOMAIN-1 / change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-005DP20 | Survey design Compare survey designs against precision and cost requirements Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-006DP20 | Nonresponse Target follow-up where survey response is incomplete Inputs and approvalRequired eligible frame [selected units]; Distinct members of that frame covered [selected units]; Frame members with unknown coverage [selected units] Result: Verified coverage; Known uncovered; Unknown coverage (%; selected units; selected units) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-007DP20 | Frame quality Resolve duplicate or missing units in statistical frames Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-008DP20 | Questionnaire quality Correct inconsistent responses before statistical acceptance Inputs and approvalQuestionnaire version; Questionnaire version evidence reference; validation rules; validation rules evidence reference; responses; responses evidence reference; enumerator queries; enumerator queries evidence reference; correction evidence; correction evidence evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-009DP20 | Field deployment Allocate enumerators to achieve survey coverage Inputs and approvalDemand in the selected period [enumerator days]; Rated capacity for that period [enumerator days]; Unavailable or restricted capacity [enumerator days] Result: Usable capacity minus demand; Usable capacity (enumerator days; enumerator days) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-010DP20 | Confidentiality Review disclosure risk before publishing statistical tables Inputs and approvalCell counts; Cell counts evidence reference; sensitive variables; sensitive variables evidence reference; geography; geography evidence reference; approved suppression rules; approved suppression rules evidence reference; release authority; release authority evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-011DP20 | Method comparability Determine whether series can be compared across revisions Inputs and approvalDefinitions; Definitions evidence reference; questionnaire editions; questionnaire editions evidence reference; sample design; sample design evidence reference; weights; weights evidence reference; units; units evidence reference; reference periods; reference periods evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-012DP20 | Release scheduling Prioritize delayed statistical releases and dependencies Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-013DP20 | Crop estimates Reconcile crop area yield and production estimates Inputs and approvalFinal design weight [weight]; Observed harvested area [ha]; Observed harvested production [kg]; Stratum / cluster Result: Observed holding yield (kg/ha) DOMAIN-1 / weighted-area-production: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Weighted estimation component United Nations Statistics Division · Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting Institution publication - United Nations Statistics Division SURVEYImplementation: prototype Method source: S91 |
| DEC-DP20-014DP20 | Price statistics Investigate unusual observations before index compilation Inputs and approvalComparable reference value [LKR]; Later/comparison value [LKR] Result: Difference; Relative change (LKR; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-015DP20 | Labour statistics Review geographic differences using comparable labour definitions Inputs and approvalFinal design weight [weight]; Indicator for the defined classification [0 or1]; Stratum and primary sampling unit Result: Observed variable (0 or1) DOMAIN-1 / weighted-proportion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Retain sampling frame, strata, clusters, nonresponse and calibration. The prototype does not invent complex-design variance, confidence intervals or small-area precision. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Weighted estimation component United Nations Statistics Division · Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting Institution publication - United Nations Statistics Division SURVEYImplementation: prototype Method source: S91 |
| DEC-DP20-016DP20 | Demographic change Identify population changes requiring denominator updates Inputs and approvalEarlier/source value [people]; Later/comparison value [people] Result: Difference; Relative change (people; %) DOMAIN-1 / change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-017DP20 | Administrative sources Assess administrative datasets before statistical reuse Inputs and approvalCoverage; Coverage evidence reference; definitions; definitions evidence reference; identifiers; identifiers evidence reference; update schedule; update schedule evidence reference; quality; quality evidence reference; permitted purpose; permitted purpose evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-018DP20 | Data access services Prioritize permitted requests for statistical extracts Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-019DP20 | Reproducible estimates Independently reproduce published estimates and revisions Inputs and approvalEarlier/source value [people]; Independently reproduced value [people]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [people]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (people; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP20-020DP20 | Classification maintenance Resolve unmapped economic agricultural and geographic codes Inputs and approvalSource code; Source code evidence reference; reference classification; reference classification evidence reference; validity dates; validity dates evidence reference; definitions; definitions evidence reference; crosswalk review; crosswalk review evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Survey statistician, subject-matter statistician and disclosure reviewer. Authorized decision-maker for Department of Census and Statistics; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-001DP21 | Groundwater depletion Investigate wells showing sustained drawdown Inputs and approvalGroundwater head relative to the stated datum [m]; Datum, pumping state and measurement convention Result: Observed value (m) DOMAIN-1 / groundwater-trend: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Groundwater head and depth below ground have opposite directional meanings. Match datum, pumping state and seasonal context; observed drawdown is not itself a safe-yield estimate. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required TRENDImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-002DP21 | Seasonal groundwater Adjust monitoring to seasonal groundwater variation Inputs and approvalComparable reference value [m]; Later/comparison value [m] Result: Difference; Relative change (m; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-003DP21 | Groundwater quality Investigate wells exceeding applicable use-specific limits Inputs and approvalParameter and applicable use; Measured result [mg/L]; Example lower comparison bound [mg/L]; Example upper comparison bound [mg/L]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mg/L) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-004DP21 | Monitoring coverage Select groundwater areas needing observation wells Inputs and approvalRequired eligible frame [aquifer units]; Distinct members of that frame covered [aquifer units]; Frame members with unknown coverage [aquifer units] Result: Verified coverage; Known uncovered; Unknown coverage (%; aquifer units; aquifer units) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-005DP21 | Borehole siting Shortlist sites requiring detailed groundwater investigation Inputs and approvalGeology; Geology evidence reference; geophysics; geophysics evidence reference; nearby wells; nearby wells evidence reference; demand; demand evidence reference; contamination risks; contamination risks evidence reference; land access; land access evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-006DP21 | Pumping tests Refer pumping-test results for safe-abstraction assessment Inputs and approvalEarlier/source value [m³/day]; Independently reproduced value [m³/day]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [m³/day]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (m³/day; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-007DP21 | Abstraction balance Compare recorded abstraction with reviewed aquifer budgets Inputs and approvalOpening storage [m³]; Recharge and external groundwater inflow [m³]; Abstraction and groundwater outflow [m³]; Other identified non-overlapping water outflow [m³]; Independently observed closing storage [m³] Result: Calculated closing storage; Observed minus calculated closing (m³; m³) DOMAIN-1 / aquifer-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A storage-change calculation needs a defined aquifer boundary and compatible volume estimates. Groundwater head in metres is not a storage volume; uncertainty and safe-abstraction review remain separate. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-008DP21 | Well protection Investigate contamination sources near supply wells Inputs and approvalDocumented source-to-well separation [m]; Potential contamination source and observation reference; Hydrogeological flow-direction evidence; Use-specific reviewed protection criterion Result: Documented separation (m) DOMAIN-1 / well-proximity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-009DP21 | Saline intrusion Prioritize coastal groundwater salinity investigations Inputs and approvalComparable observation [µS/cm] Result: Observed value (µS/cm) DOMAIN-1 / trend: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required TRENDImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-010DP21 | Industrial abstraction Refer industrial groundwater requests for determination Inputs and approvalDemand; Demand evidence reference; hydrogeological report; hydrogeological report evidence reference; abstraction proposal; abstraction proposal evidence reference; permits; permits evidence reference; monitoring conditions; monitoring conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S25, S26, S56 Context alone does not validate the formula. |
| DEC-DP21-011DP21 | Recharge options Compare managed-recharge alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-012DP21 | Mining impacts Investigate groundwater changes around extraction sites Inputs and approvalTreatment Groundwater head at common datum before [m]; Treatment Groundwater head at common datum after [m]; Comparison Groundwater head at common datum before [m]; Comparison Groundwater head at common datum after [m]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (m) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP21-013DP21 | Well rehabilitation Prioritize rehabilitation of poorly performing wells Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-014DP21 | Laboratory turnaround Clear delayed groundwater laboratory analyses Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-015DP21 | Drought supply Compare feasible groundwater contingency supplies Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-016DP21 | Drilling performance Review unsuccessful drilling and cost patterns Inputs and approvalDrilling cost [LKR]; Completed drilled depth [m]; Tested sustainable-yield evidence [L/s]; Outcome under the stated success definition Result: Cost per drilled metre; Reported pumping-test yield (LKR/m; L/s) DOMAIN-1 / drilling: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-017DP21 | Monitoring devices Restore failed groundwater loggers and calibration Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-018DP21 | Public evidence Prepare permitted groundwater information releases Inputs and approvalDataset; Dataset evidence reference; location sensitivity; location sensitivity evidence reference; ownership; ownership evidence reference; intended use; intended use evidence reference; license; license evidence reference; approval; approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-019DP21 | Aquifer models Validate aquifer-model predictions before planning use Inputs and approvalEarlier/source value [m]; Independently reproduced value [m]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [m]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (m; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP21-020DP21 | Well registry Resolve inconsistent well identifiers and construction metadata Inputs and approvalWell ID; Well ID evidence reference; location; location evidence reference; depth; depth evidence reference; screen interval; screen interval evidence reference; datum; datum evidence reference; construction date; construction date evidence reference; source; source evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Hydrogeologist and water-quality specialist. Authorized decision-maker for Water Resources Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-001DP22 | Non-revenue water Prioritize systems with large unexplained water balances Inputs and approvalCorrected system input [m³]; Billed authorized consumption [m³]; Unbilled authorized consumption [m³]; Estimated apparent losses [m³] Result: Non-revenue water; NRW share; Water losses; Residual real-loss estimate (m³; %; m³; m³) DOMAIN-1 / billed-water: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits NRW is not all leakage. An unknown apparent-loss estimate keeps residual real loss unavailable. Meter uncertainty and matching time/zone boundaries matter. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · IWA water-balance components Asian Development Bank · Figure 4, printed page 15; Annex 1 Water Balance Definitions, printed pages 39–41, PDF pages 47–49 Institution publication - Asian Development Bank NRWImplementation: prototype Method source: DD-NRW |
| DEC-DP22-002DP22 | Leakage management Target leakage investigations by service area Inputs and approvalCorrected system input [m³]; Billed authorized consumption [m³]; Unbilled authorized consumption [m³]; Estimated apparent losses [m³] Result: Non-revenue water; NRW share; Water losses; Residual real-loss estimate (m³; %; m³; m³) DOMAIN-1 / leakage-evidence: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits NRW is not all leakage. An unknown apparent-loss estimate keeps residual real loss unavailable. Meter uncertainty and matching time/zone boundaries matter. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · IWA water-balance components Asian Development Bank · Figure 4, printed page 15; Annex 1 Water Balance Definitions, printed pages 39–41, PDF pages 47–49 Institution publication - Asian Development Bank NRWImplementation: prototype Method source: DD-NRW |
| DEC-DP22-003DP22 | Service expansion Prioritize underserved areas for water-service appraisal Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-004DP22 | Water quality Refer treated-water results outside applicable limits Inputs and approvalParameter and applicable use; Measured result [NTU]; Example lower comparison bound [NTU]; Example upper comparison bound [NTU]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (NTU) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-005DP22 | Water safety planning Prioritize source-to-consumer hazards and controls Inputs and approvalSupply system; Supply system evidence reference; hazards; hazards evidence reference; exposure; exposure evidence reference; control measures; control measures evidence reference; evidence; evidence evidence reference; approved risk method; approved risk method evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: S56 |
| DEC-DP22-006DP22 | Treatment capacity Compare peak demand with usable treatment capacity Inputs and approvalDemand in the selected period [m³/day]; Rated capacity for that period [m³/day]; Unavailable or restricted capacity [m³/day] Result: Usable capacity minus demand; Usable capacity (m³/day; m³/day) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-007DP22 | Pressure management Investigate pressure outside reviewed operating conditions Inputs and approvalParameter and applicable use; Measured result [m head]; Example lower comparison bound [m head]; Example upper comparison bound [m head]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (m head) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-008DP22 | Pipe replacement Prioritize pipe rehabilitation using verified asset condition Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-009DP22 | Pump efficiency Select pumping systems for energy-efficiency appraisal Inputs and approvalElectric energy consumed [kWh]; Water pumped [m³] Result: Specific energy use (kWh/m³) DOMAIN-1 / pump-energy: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-010DP22 | Meter replacement Schedule verification of suspect customer and bulk meters Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-011DP22 | Supply interruptions Address recurrent and prolonged supply outages Inputs and approvalScheduled observation window [hours]; Union of qualifying outage intervals [hours]; Eligible service requests [requests]; Failed eligible requests [requests]; Measured response time [ms] Result: Time availability; Request success; Measured response time (%; %; ms) DOMAIN-1 / reliability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits State maintenance exclusions, operating window, probe, workload and service objective. Observed response time is not a p95 claim unless the percentile is actually measured. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RELIABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-012DP22 | Source security Compare alternative sources under seasonal stress Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-013DP22 | Connection requests Prioritize delayed service-connection applications Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-014DP22 | Customer complaints Escalate unresolved water and sanitation complaints Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-015DP22 | Chemical supply Prevent treatment interruptions from chemical shortages Inputs and approvalPhysical stock [kg chemical]; Quarantined stock [kg chemical]; Expired stock [kg chemical]; Committed usable stock [kg chemical]; Additional demand [kg chemical]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (kg chemical; kg chemical) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-016DP22 | Wastewater treatment Investigate effluent performance against permit conditions Inputs and approvalParameter and applicable use; Measured result [mg/L]; Example lower comparison bound [mg/L]; Example upper comparison bound [mg/L]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mg/L) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-017DP22 | Sewer overflows Prioritize investigation of sewer overflow risks Inputs and approvalIncident history; Incident history evidence reference; pipe condition; pipe condition evidence reference; flow; flow evidence reference; sensitive receptors; sensitive receptors evidence reference; rainfall; rainfall evidence reference; controls; controls evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-018DP22 | Capital investments Compare water-service investment alternatives Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP22-019DP22 | Community systems Target support to poorly functioning community water schemes Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP22-020DP22 | Network records Resolve inconsistent asset and customer service-area references Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Water utility engineer, quality specialist and service/finance reviewer. Authorized decision-maker for National Water Supply and Drainage Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-001DP23 | Geological constraints Refer proposed sites overlapping geological constraints Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-002DP23 | Mapping coverage Commission geological mapping in poorly covered catchments Inputs and approvalRequired eligible frame [ha]; Distinct members of that frame covered [ha]; Frame members with unknown coverage [ha] Result: Verified coverage; Known uncovered; Unknown coverage (%; ha; ha) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-003DP23 | Site investigation Select parcels requiring detailed geological investigation Inputs and approvalGeology; Geology evidence reference; slope; slope evidence reference; groundwater; groundwater evidence reference; project footprint; project footprint evidence reference; hazard evidence; hazard evidence evidence reference; expert requirements; expert requirements evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-004DP23 | Map revisions Reassess site screening after geological-map changes Inputs and approvalEarlier/source value [affected sites]; Later/comparison value [affected sites] Result: Difference; Relative change (affected sites; %) DOMAIN-1 / change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-005DP23 | Mining licenses Refer complete mining applications for authorized determination Inputs and approvalApplication; Application evidence reference; mineral; mineral evidence reference; location; location evidence reference; land rights; land rights evidence reference; current conditions; current conditions evidence reference; environmental approval; environmental approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-006DP23 | Extraction monitoring Investigate extraction differing from authorized quantities Inputs and approvalPlanned value [m³]; Observed value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-007DP23 | Mine rehabilitation Verify rehabilitation obligations before closure review Inputs and approvalMine ID; Mine ID evidence reference; approved plan; approved plan evidence reference; works; works evidence reference; inspection evidence; inspection evidence evidence reference; financial provisions; financial provisions evidence reference; conditions; conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-008DP23 | River sand Identify extraction proposals needing hydrological and ecological review Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-009DP23 | Quarry impacts Investigate documented quarry effects on nearby receptors Inputs and approvalParameter and applicable use; Measured result [mm/s]; Example lower comparison bound [mm/s]; Example upper comparison bound [mm/s]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mm/s) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-010DP23 | Illegal extraction Refer suspected unlicensed extraction for investigation Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-011DP23 | Mineral resources Prioritize exploration using evidence and feasibility constraints Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-012DP23 | Groundwater interactions Review mining proposals affecting groundwater systems Inputs and approvalMine depth; Mine depth evidence reference; aquifer; aquifer evidence reference; pumping; pumping evidence reference; well network; well network evidence reference; baseline quality; baseline quality evidence reference; hydrogeological assessment; hydrogeological assessment evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-013DP23 | Laboratory services Prioritize pending mineral and material analyses Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-014DP23 | Sample integrity Resolve analytical discrepancies before resource assessment Inputs and approvalOriginal source measurement [mg/kg]; Independent comparison measurement [mg/kg]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (mg/kg; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-015DP23 | Transport permissions Check mineral transport documents against authorized sources Inputs and approvalShipment; Shipment evidence reference; source license; source license evidence reference; mineral; mineral evidence reference; quantity; quantity evidence reference; route; route evidence reference; validity; validity evidence reference; required documents; required documents evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-016DP23 | Mine inspections Schedule inspections according to approved risk priorities Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-017DP23 | Revenue reconciliation Investigate differences in extraction-related payable and recorded receipts Inputs and approvalOriginal source measurement [LKR]; Independent comparison measurement [LKR]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (LKR; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-018DP23 | Geohazard evidence Escalate verified geohazard concerns to relevant specialists Inputs and approvalObserved instability; Observed instability evidence reference; geology; geology evidence reference; location; location evidence reference; exposed assets; exposed assets evidence reference; field evidence; field evidence evidence reference; referral; referral evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-019DP23 | Resource estimates Require reproducible mineral-resource estimation evidence Inputs and approvalEarlier/source value [tonnes]; Independently reproduced value [tonnes]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [tonnes]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (tonnes; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP23-020DP23 | Geological catalogue Improve discoverability and provenance of geological records Inputs and approvalMap ID; Map ID evidence reference; scale; scale evidence reference; survey date; survey date evidence reference; lithology definitions; lithology definitions evidence reference; owner; owner evidence reference; access rights; access rights evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Geologist, mining/environmental specialist and licensing reviewer. Authorized decision-maker for Geological Survey and Mines Bureau; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-001DP24 | Land applications Prioritize unresolved state-land applications Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-002DP24 | Lease reviews Schedule lease and permit reviews before due dates Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-003DP24 | Digitization Target gaps in state-land record digitization Inputs and approvalRequired eligible frame [records]; Distinct members of that frame covered [records]; Frame members with unknown coverage [records] Result: Verified coverage; Known uncovered; Unknown coverage (%; records; records) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-004DP24 | Processing performance Address delays in administrative land requests Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-005DP24 | Land allocation Refer allocation cases with complete eligibility evidence Inputs and approvalApplicant; Applicant evidence reference; parcel; parcel evidence reference; purpose; purpose evidence reference; current rules; current rules evidence reference; prior allocations; prior allocations evidence reference; documentary evidence; documentary evidence evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S29, S30 Context alone does not validate the formula. |
| DEC-DP24-006DP24 | Boundary reconciliation Resolve conflicting state-land parcel records Inputs and approvalOriginal source measurement [ha]; Independent comparison measurement [ha]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (ha; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-007DP24 | Lease revenue Reconcile assessed rents collections and outstanding balances Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-008DP24 | Arrears follow-up Prioritize overdue lease revenue cases Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-009DP24 | Permit conditions Refer non-compliance with recorded land-use conditions Inputs and approvalPermit version; Permit version evidence reference; required use; required use evidence reference; inspection findings; inspection findings evidence reference; due dates; due dates evidence reference; evidence; evidence evidence reference; authority; authority evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-010DP24 | Succession cases Refer succession and transfer requests for determination Inputs and approvalPermit; Permit evidence reference; applicant evidence; applicant evidence evidence reference; legal documents; legal documents evidence reference; claims; claims evidence reference; current rules; current rules evidence reference; objections; objections evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S29, S30 Context alone does not validate the formula. |
| DEC-DP24-011DP24 | Public-purpose land Compare suitable state parcels for public facilities Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-012DP24 | Land disputes Resolve outstanding claims and objections before determination Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-013DP24 | Land reservations Review allocation requests overlapping protected reservations Inputs and approvalProposal footprint [ha]; Union of overlapping constraint areas [ha]; Boundary edition; Constraint definition Result: Overlap share; Overlapping area (%; ha) DOMAIN-1 / overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-014DP24 | Institutional handover Verify documentation for inter-agency land transfers Inputs and approvalParcel; Parcel evidence reference; receiving agency; receiving agency evidence reference; authorization; authorization evidence reference; survey; survey evidence reference; conditions; conditions evidence reference; handover evidence; handover evidence evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-015DP24 | Unauthorized occupation Refer suspected unauthorized occupation for investigation Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-016DP24 | Valuation review Request valuation updates where lease assessments are outdated Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-017DP24 | Land-use effectiveness Review whether allocated land serves approved purposes Inputs and approvalPlanned value [ha]; Observed value [ha] Result: Difference; Relative change (ha; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-018DP24 | Record access Determine permitted release of land and applicant information Inputs and approvalRequested fields; Requested fields evidence reference; purpose; purpose evidence reference; rights; rights evidence reference; classification; classification evidence reference; scope; scope evidence reference; approval; approval evidence reference; validity; validity evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-019DP24 | Document quality Correct missing references in electronic land files Inputs and approvalCase ID; Case ID evidence reference; document type; document type evidence reference; survey reference; survey reference evidence reference; issuer; issuer evidence reference; date; date evidence reference; version; version evidence reference; authenticity; authenticity evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP24-020DP24 | Office capacity Allocate case-processing capacity across land offices Inputs and approvalDemand in the selected period [staff hours]; Rated capacity for that period [staff hours]; Unavailable or restricted capacity [staff hours] Result: Usable capacity minus demand; Usable capacity (staff hours; staff hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. State-land officer, legal/document reviewer and survey professional. Authorized decision-maker for Land Commissioner General's Department; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-001DP25 | Price spreads Investigate large comparable farmgate wholesale and retail spreads Inputs and approvalComparable purchase quotation [LKR/kg]; Comparable selling quotation [LKR/kg]; Non-overlapping transfer costs [LKR/kg]; Expected saleable mass loss [%]; Product, grade and price basis Result: Quoted net return per purchased kg; Unadjusted quoted spread (LKR/kg; LKR/kg) DOMAIN-1 / price: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use matching grade, price date, currency, mass basis and payment terms. This quotation scenario excludes unlisted costs and is not realized profit or a forecast. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required PRICEImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-002DP25 | Price volatility Prioritize commodities with unusual price variability Inputs and approvalComparable observation [LKR/kg] Result: Observed value (LKR/kg) DOMAIN-1 / volatility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Sample coefficient of variation National Institute of Standards and Technology United States · Description, sample coefficient of variation and ratio-scale restrictions Government publication - National Institute of Standards and Technology United States VOLATILITYImplementation: prototype Method source: S84 |
| DEC-DP25-003DP25 | Seasonal markets Inform seasonal marketing using comparable historical patterns Inputs and approvalComparable observation [LKR/kg] Result: Observed value (LKR/kg) DOMAIN-1 / trend: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required TRENDImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-004DP25 | Market comparisons Identify markets requiring closer price-distribution study Inputs and approvalComparable observation [LKR/kg] Result: Observed value (LKR/kg) DOMAIN-1 / distribution: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required DISTRIBUTIONImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-005DP25 | Market coverage Expand observations where price reporting is incomplete Inputs and approvalRequired eligible frame [quotes]; Distinct members of that frame covered [quotes]; Frame members with unknown coverage [quotes] Result: Verified coverage; Known uncovered; Unknown coverage (%; quotes; quotes) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-006DP25 | Food affordability Compare documented food-basket costs across locations Inputs and approvalSpecified basket/input quantity [kg]; Comparable unit price [LKR/kg]; Item, grade and basket specification Result: Item expenditure (LKR) DOMAIN-1 / basket-cost: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-007DP25 | Farmer returns Assess enterprise margins for policy research Inputs and approvalSaleable output [kg]; Realized price [LKR/kg]; Variable costs [LKR]; Matching crop area [ha] Result: Enterprise gross margin; Gross margin per hectare; Variable-cost break-even price (LKR; LKR/ha; LKR/kg) DOMAIN-1 / margin: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep fixed costs, family-labour opportunity cost, taxes and financing identifiable. Gross margin is not net profit. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Enterprise gross margin Food and Agriculture Organization of the United Nations · Chapter 4, Gross margin and section 4.7.1 Institution publication - Food and Agriculture Organization of the United Nations MARGINImplementation: prototype Method source: S76 |
| DEC-DP25-008DP25 | Marketing losses Identify value-chain stages requiring loss studies Inputs and approvalBatch input on stated moisture basis [kg]; Saleable output [kg]; Usable by-product [kg]; Closing stock [kg]; Documented transfers out [kg] Result: Unaccounted physical share; Unaccounted mass (%; kg) DOMAIN-1 / loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required LOSSImplementation: prototype Method source: S57 |
| DEC-DP25-009DP25 | Market integration Investigate persistent differences between connected markets Inputs and approvalComparable purchase quotation [LKR/kg]; Comparable selling quotation [LKR/kg]; Non-overlapping transfer costs [LKR/kg]; Expected saleable mass loss [%]; Product, grade and price basis Result: Quoted net return per purchased kg; Unadjusted quoted spread (LKR/kg; LKR/kg) DOMAIN-1 / price: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use matching grade, price date, currency, mass basis and payment terms. This quotation scenario excludes unlisted costs and is not realized profit or a forecast. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required PRICEImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-010DP25 | Policy evaluation Evaluate agricultural policy outcomes with credible comparisons Inputs and approvalTreatment Real enterprise income on stated price basis before [LKR/ha]; Treatment Real enterprise income on stated price basis after [LKR/ha]; Comparison Real enterprise income on stated price basis before [LKR/ha]; Comparison Real enterprise income on stated price basis after [LKR/ha]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (LKR/ha) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP25-011DP25 | Input markets Investigate shifts in agricultural input expenditure Inputs and approvalSpecified basket/input quantity [kg]; Comparable unit price [LKR/kg]; Item, grade and basket specification Result: Item expenditure (LKR) DOMAIN-1 / input-expenditure: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-012DP25 | Farmer organization research Identify organizational barriers to collective marketing Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-013DP25 | Land and labour Review farm labour costs and labour-use differences Inputs and approvalPerson-days worked [person-days]; Cash wage per hired person-day [LKR/person-day]; Matching cultivated area [ha]; Unpaid family labour [person-days] Result: Cash labour cost per hectare; Total labour per hectare (LKR/ha; person-days/ha) DOMAIN-1 / labour: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-014DP25 | Food supply disruptions Prioritize research on documented market supply shocks Inputs and approvalComparable reference value [kg]; Later/comparison value [kg] Result: Difference; Relative change (kg; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-015DP25 | Storage investments Compare storage and handling options for perishables Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP25-016DP25 | Survey design Select agrarian research sampling strategies Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-017DP25 | Publication quality Resolve contradictory market observations before release Inputs and approvalOriginal source measurement [LKR/kg]; Independent comparison measurement [LKR/kg]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (LKR/kg; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-018DP25 | Training priorities Target agrarian training to documented capability gaps Inputs and approvalRequired eligible frame [quotes]; Distinct members of that frame covered [quotes]; Frame members with unknown coverage [quotes] Result: Verified coverage; Known uncovered; Unknown coverage (%; quotes; quotes) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-019DP25 | Research requests Prioritize policy-analysis requests by decision deadlines Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP25-020DP25 | Evidence reproducibility Independently reproduce agrarian research findings Inputs and approvalEarlier/source value [LKR/ha]; Independently reproduced value [LKR/ha]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [LKR/ha]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (LKR/ha; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Agricultural economist, market analyst and survey statistician. Authorized decision-maker for HARTI; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-001DP26 | Export destinations Prioritize products and destination markets for support Inputs and approvalRecorded export value [LKR]; Matching export quantity [kg]; Product code, destination and grade Result: Export value; Value share; Quantity share (LKR; %; %) DOMAIN-1 / export-composition: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COMPOSITIONImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-002DP26 | Market dependence Identify excessive dependence on few export markets Inputs and approvalCompatible category amount [LKR] Result: Category amount; Share of selected total (LKR; %) DOMAIN-1 / concentration: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · HHI concentration component United States Department of Justice · Definition and four-firm worked example Government publication - United States Department of Justice CONCENTRATIONImplementation: prototype Method source: S83 |
| DEC-DP26-003DP26 | Growth opportunities Target product groups contributing to export growth Inputs and approvalEarlier/source value [LKR]; Later/comparison value [LKR] Result: Difference; Relative change (LKR; %) DOMAIN-1 / change: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CHANGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-004DP26 | Unit values Investigate changing export unit values Inputs and approvalRecorded export value [LKR]; Export quantity on matching product basis [kg] Result: Output per resource (LKR/kg) DOMAIN-1 / export-unit-value: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A unit value mixes prices and product composition. It is not automatically a like-for-like market price. Match grade, product code, currency and period. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-005DP26 | Exporter readiness Refer businesses to appropriate export-readiness support Inputs and approvalEnterprise; Enterprise evidence reference; product; product evidence reference; capacity; capacity evidence reference; compliance evidence; compliance evidence evidence reference; target market; target market evidence reference; readiness criteria; readiness criteria evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-006DP26 | Market access Identify unresolved market-entry requirements Inputs and approvalProduct; Product evidence reference; destination; destination evidence reference; current standards; current standards evidence reference; tariffs; tariffs evidence reference; certificates; certificates evidence reference; buyer requirements; buyer requirements evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S33, S34 Context alone does not validate the formula. |
| DEC-DP26-007DP26 | Trade promotion Compare proposed trade-promotion activities Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-008DP26 | Buyer matching Match verified exporter offers with buyer requirements Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-009DP26 | Export diversification Compare alternative products and markets under constraints Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-010DP26 | Exporter development Target support to regions with uncovered export potential Inputs and approvalRequired eligible frame [enterprises]; Distinct members of that frame covered [enterprises]; Frame members with unknown coverage [enterprises] Result: Verified coverage; Known uncovered; Unknown coverage (%; enterprises; enterprises) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-011DP26 | Quality failures Prioritize corrective support after shipment nonconformities Inputs and approvalParameter and applicable use; Measured result [%]; Example lower comparison bound [%]; Example upper comparison bound [%]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (%) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-012DP26 | Brand development Compare product branding and certification investments Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP26-013DP26 | Promotion outcomes Evaluate realized outcomes of trade missions Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-014DP26 | Trade barriers Escalate unresolved exporter market-access cases Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-015DP26 | Digital channels Target exporters needing digital market capability Inputs and approvalRequired eligible frame [enterprises]; Distinct members of that frame covered [enterprises]; Frame members with unknown coverage [enterprises] Result: Verified coverage; Known uncovered; Unknown coverage (%; enterprises; enterprises) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-016DP26 | Sustainable exports Review evidence supporting environmental product claims Inputs and approvalClaim; Claim evidence reference; product; product evidence reference; chain of custody; chain of custody evidence reference; certification; certification evidence reference; source rights; source rights evidence reference; verification; verification evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-017DP26 | Logistics constraints Compare export routes and delivery feasibility Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-018DP26 | Support funding Reconcile export-support commitments and verified delivery Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-019DP26 | Exporter directory Correct outdated or duplicate exporter profiles Inputs and approvalEnterprise identifier; Enterprise identifier evidence reference; products; products evidence reference; contact permission; contact permission evidence reference; verification date; verification date evidence reference; source; source evidence reference; duplicates; duplicates evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP26-020DP26 | Export policy impact Assess outcomes of export-development interventions Inputs and approvalTreatment Comparable export value before [LKR]; Treatment Comparable export value after [LKR]; Comparison Comparable export value before [LKR]; Comparison Comparable export value after [LKR]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (LKR) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Export development adviser and market/compliance specialist. Authorized decision-maker for Export Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP27-001DP27 | Support uptake Improve uptake of appropriate enterprise-support offers Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-002DP27 | Training progression Follow trainees needing subsequent business assistance Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-003DP27 | Service delays Prioritize enterprise assistance cases waiting longest Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-004DP27 | Geographic reach Redirect outreach toward underserved target districts Inputs and approvalRequired eligible frame [enterprises]; Distinct members of that frame covered [enterprises]; Frame members with unknown coverage [enterprises] Result: Verified coverage; Known uncovered; Unknown coverage (%; enterprises; enterprises) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-005DP27 | Business viability Refer enterprise plans for financial and market appraisal Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP27-006DP27 | Finance referral Match enterprises to suitable finance-support pathways Inputs and approvalEnterprise needs; Enterprise needs evidence reference; finance product terms; finance product terms evidence reference; eligibility evidence; eligibility evidence evidence reference; repayment capacity; repayment capacity evidence reference; consent; consent evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S35, S51, S59 Context alone does not validate the formula. |
| DEC-DP27-007DP27 | Mentoring Allocate mentors to documented enterprise needs Inputs and approvalDocumented skills/expertise; Task requirement; Available qualified effort [hours]; Required effort [hours]; Conflicts, clearance and mandate; Availability begins; Availability ends; Task window begins; Task window ends Result: Available minus required hours (hours) DOMAIN-1 / human-match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-008DP27 | Market linkages Match enterprise products with verified buyer demand Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-009DP27 | Enterprise survival Target follow-up to supported businesses at risk of closure Inputs and approvalOriginal distinct cohort [enterprises]; Known operating enterprises [enterprises]; Known closed enterprises [enterprises]; Unknown follow-up [enterprises]; Later entrants outside original cohort [enterprises] Result: Confirmed continuation lower bound; Continuation upper bound; Unknown follow-up (%; %; enterprises) DOMAIN-1 / business-retention: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVIVALImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-010DP27 | Business performance Review changes in enterprise outcomes after assistance Inputs and approvalTreatment Real enterprise sales on stated price basis before [LKR]; Treatment Real enterprise sales on stated price basis after [LKR]; Comparison Real enterprise sales on stated price basis before [LKR]; Comparison Real enterprise sales on stated price basis after [LKR]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (LKR) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP27-011DP27 | Women and youth support Address gaps in access to enterprise opportunities Inputs and approvalRequired eligible frame [enterprises]; Distinct members of that frame covered [enterprises]; Frame members with unknown coverage [enterprises] Result: Verified coverage; Known uncovered; Unknown coverage (%; enterprises; enterprises) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-012DP27 | Grant administration Refer complete enterprise-grant applications for determination Inputs and approvalScheme version; Scheme version evidence reference; applicant evidence; applicant evidence evidence reference; budget; budget evidence reference; eligibility; eligibility evidence reference; prior support; prior support evidence reference; approvals; approvals evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S35, S51, S59 Context alone does not validate the formula. |
| DEC-DP27-013DP27 | Duplicate assistance Review potentially overlapping enterprise subsidies Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-014DP27 | Business skills Prioritize training topics using verified capability gaps Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-015DP27 | Formalization support Identify enterprises needing registration or compliance referrals Inputs and approvalEnterprise stage; Enterprise stage evidence reference; required registrations; required registrations evidence reference; existing documents; existing documents evidence reference; gaps; gaps evidence reference; responsible agency; responsible agency evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-016DP27 | Climate resilience Compare enterprise adaptation options Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-017DP27 | Incubation capacity Allocate incubation services within facility and adviser limits Inputs and approvalDemand in the selected period [adviser hours]; Rated capacity for that period [adviser hours]; Unavailable or restricted capacity [adviser hours] Result: Usable capacity minus demand; Usable capacity (adviser hours; adviser hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-018DP27 | Programme finance Identify unfunded enterprise-support commitments Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-019DP27 | Enterprise registry Resolve inconsistent enterprise identities before reporting Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP27-020DP27 | Programme effectiveness Select enterprise-support approaches for continuation or redesign Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Enterprise development adviser and finance/monitoring reviewer. Authorized decision-maker for National Enterprise Development Authority; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-001DP28 | Estate plots Match eligible industrial demand to available developed plots Inputs and approvalPlot utility/use specification; Applicant utility/use needs; Available uncommitted quantity [m²]; Required quantity [m²]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (m²) DOMAIN-1 / plot-match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-002DP28 | Infrastructure readiness Prioritize missing estate utilities and access infrastructure Inputs and approvalDemand in the selected period [m³/day]; Rated capacity for that period [m³/day]; Unavailable or restricted capacity [m³/day] Result: Usable capacity minus demand; Usable capacity (m³/day; m³/day) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-003DP28 | Support outcomes Verify enterprise outcomes following technical assistance Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-004DP28 | Estate requests Resolve outstanding tenant-support requests Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-005DP28 | Technology upgrades Compare industrial modernization alternatives Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP28-006DP28 | Resource productivity Identify facilities with inefficient material and energy use Inputs and approvalSaleable product [kg]; Electric energy [kWh]; Process water [m³]; Raw material input [kg] Result: Energy per product; Water per product; Saleable mass conversion (kWh/kg; m³/kg; %) DOMAIN-1 / resource-efficiency: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-007DP28 | Product quality Target technical support to recurring quality failures Inputs and approvalParameter and applicable use; Measured result [mm]; Example lower comparison bound [mm]; Example upper comparison bound [mm]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mm) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-008DP28 | Industrial training Schedule technical training around verified skill needs Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-009DP28 | New enterprise appraisal Review proposed manufacturing projects against constraints Inputs and approvalBusiness plan; Business plan evidence reference; location; location evidence reference; utilities; utilities evidence reference; permits; permits evidence reference; costs; costs evidence reference; market evidence; market evidence evidence reference; eligibility; eligibility evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S36, S37 Context alone does not validate the formula. |
| DEC-DP28-010DP28 | Estate maintenance Prioritize shared infrastructure maintenance Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-011DP28 | Rent reconciliation Follow up estate rent and lease-account discrepancies Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-012DP28 | Pollution referrals Refer industrial environmental concerns to competent agencies Inputs and approvalFacility; Facility evidence reference; observed discharge; observed discharge evidence reference; permits; permits evidence reference; inspection; inspection evidence reference; exposed receptors; exposed receptors evidence reference; authority; authority evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-013DP28 | Common facilities Compare demand for shared industrial processing facilities Inputs and approvalDemand in the selected period [facility hours]; Rated capacity for that period [facility hours]; Unavailable or restricted capacity [facility hours] Result: Usable capacity minus demand; Usable capacity (facility hours; facility hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-014DP28 | Product development Select feasible product-development support projects Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-015DP28 | Testing services Reduce delays in technical testing and consultancy Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-016DP28 | Supply-chain linkages Match industrial inputs by-products and buyer demand Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-017DP28 | Worker safety Prioritize documented industrial safety concerns for specialist review Inputs and approvalHazards; Hazards evidence reference; exposure; exposure evidence reference; controls; controls evidence reference; incidents; incidents evidence reference; inspections; inspections evidence reference; applicable requirements; applicable requirements evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: DD-ILO |
| DEC-DP28-018DP28 | Estate expansion Compare locations for new industrial-estate capacity Inputs and approvalLand constraints; Land constraints evidence reference; utilities; utilities evidence reference; transport; transport evidence reference; demand; demand evidence reference; costs; costs evidence reference; environmental approvals; environmental approvals evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-019DP28 | Estate catalogue Correct outdated plot and facility information Inputs and approvalPlot ID; Plot ID evidence reference; geometry; geometry evidence reference; tenant status; tenant status evidence reference; utilities; utilities evidence reference; last verification; last verification evidence reference; custodian; custodian evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP28-020DP28 | Industrial outcomes Evaluate whether technical support improved enterprise performance Inputs and approvalTreatment Saleable production per resource before [kg/kWh]; Treatment Saleable production per resource after [kg/kWh]; Comparison Saleable production per resource before [kg/kWh]; Comparison Saleable production per resource after [kg/kWh]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (kg/kWh) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Industrial engineer and enterprise/estate service reviewer. Authorized decision-maker for Industrial Development Board; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP29-001DP29 | District projects Escalate overdue district project milestones Inputs and approvalPlanned milestone/sowing date; Observed completion/sowing date Result: Calendar date difference (days) DOMAIN-1 / dated-variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-002DP29 | Citizen services Prioritize aging district service requests Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-003DP29 | Intervention coverage Coordinate investment in areas missing planned services Inputs and approvalRequired eligible frame [areas]; Distinct members of that frame covered [areas]; Frame members with unknown coverage [areas] Result: Verified coverage; Known uncovered; Unknown coverage (%; areas; areas) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-004DP29 | District reporting Follow up missing or outdated divisional returns Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-005DP29 | District planning Compare district development priorities within resource limits Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-006DP29 | Disaster coordination Allocate district response resources against verified needs Inputs and approvalDemand in the selected period [team hours]; Rated capacity for that period [team hours]; Unavailable or restricted capacity [team hours] Result: Usable capacity minus demand; Usable capacity (team hours; team hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-007DP29 | Funding coordination Identify district activities without confirmed financing Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-008DP29 | Land coordination Resolve cross-agency land issues delaying public works Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-009DP29 | Infrastructure access Compare service access across district communities Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-010DP29 | Beneficiary overlap Review overlapping assistance across district programmes Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-011DP29 | Safeguard follow-up Escalate unresolved safeguards in district investments Inputs and approvalProject approval; Project approval evidence reference; safeguard conditions; safeguard conditions evidence reference; inspections; inspections evidence reference; affected groups; affected groups evidence reference; due dates; due dates evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-012DP29 | Divisional capacity Target administrative support to overloaded divisions Inputs and approvalDemand in the selected period [staff hours]; Rated capacity for that period [staff hours]; Unavailable or restricted capacity [staff hours] Result: Usable capacity minus demand; Usable capacity (staff hours; staff hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-013DP29 | District grievances Resolve inter-agency grievances with clear ownership Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-014DP29 | Public consultation Ensure affected groups are heard in district plans Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-015DP29 | Programme inclusion Address documented exclusion from district services Inputs and approvalRequired eligible frame [areas]; Distinct members of that frame covered [areas]; Frame members with unknown coverage [areas] Result: Verified coverage; Known uncovered; Unknown coverage (%; areas; areas) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-016DP29 | Procurement dependencies Schedule district procurements affecting critical works Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-017DP29 | Asset handover Verify ownership and maintenance of completed public assets Inputs and approvalAsset; Asset evidence reference; acceptance evidence; acceptance evidence evidence reference; assigned owner; assigned owner evidence reference; maintenance budget; maintenance budget evidence reference; handover conditions; handover conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-018DP29 | Outcome reporting Assess district programme outcomes with stated limitations Inputs and approvalTreatment Verified programme outcome before [specified outcome unit]; Treatment Verified programme outcome after [specified outcome unit]; Comparison Verified programme outcome before [specified outcome unit]; Comparison Verified programme outcome after [specified outcome unit]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (specified outcome unit) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP29-019DP29 | Geographic consistency Resolve district reporting boundary and code mismatches Inputs and approvalSource geography; Source geography evidence reference; official code; official code evidence reference; boundary edition; boundary edition evidence reference; period; period evidence reference; crosswalk evidence; crosswalk evidence evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP29-020DP29 | Inter-agency decisions Close district coordination cases with unmet dependencies Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. District planning/service officer and relevant sector specialist. Authorized decision-maker for District Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-001DP30 | Administrative applications Clear applications awaiting divisional administrative action Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-002DP30 | Service standards Address divisional services exceeding approved response targets Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-003DP30 | Programme gaps Target reported local programme-support gaps Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-004DP30 | Grama Niladhari returns Follow up incomplete village-level reports Inputs and approvalExpected observations in the window [observations]; Distinct valid observations [observations]; Latest valid observation; Assessment date; Required observation interval [days] Result: Completeness; Age of latest observation; Missing observations (%; days; observations) DOMAIN-1 / fresh: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A recent observation does not fill earlier gaps. Unknown schedule or observation time cannot establish freshness. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FRESHImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-005DP30 | State-land referrals Prepare complete land cases for the competent authority Inputs and approvalParcel; Parcel evidence reference; applicant; applicant evidence reference; rights evidence; rights evidence evidence reference; survey; survey evidence reference; current rules; current rules evidence reference; objections; objections evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S29, S30, S38 Context alone does not validate the formula. |
| DEC-DP30-006DP30 | Disaster relief Prioritize verified local relief needs and avoid duplicate claims Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-007DP30 | Social-service referrals Route complete welfare cases to the responsible programme Inputs and approvalApplicant evidence; Applicant evidence evidence reference; programme rules; programme rules evidence reference; consent; consent evidence reference; current support; current support evidence reference; referral status; referral status evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S29, S30, S38 Context alone does not validate the formula. |
| DEC-DP30-008DP30 | Certificate services Identify document-verification gaps delaying certificates Inputs and approvalRequest; Request evidence reference; required evidence; required evidence evidence reference; verification; verification evidence reference; authorized issuer; authorized issuer evidence reference; receipt; receipt evidence reference; due date; due date evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-009DP30 | Local development Compare village-development proposals Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-010DP30 | Community consultation Resolve local objections before administrative determination Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-011DP30 | Field inspections Schedule required inspections efficiently Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-012DP30 | Financial assistance Reconcile approved assistance with disbursement evidence Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-013DP30 | Service inclusion Identify underserved villages and eligible groups Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-014DP30 | Citizen complaints Assign unresolved local complaints to accountable offices Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-015DP30 | Project monitoring Verify local works against approved scope Inputs and approvalPlanned value [work units]; Observed value [work units] Result: Difference; Relative change (work units; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-016DP30 | Public assets Prioritize maintenance referrals for local public assets Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-017DP30 | Data reconciliation Resolve contradictory household and land records Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-018DP30 | Office workload Allocate staff to service desks with capacity shortages Inputs and approvalDemand in the selected period [staff hours]; Rated capacity for that period [staff hours]; Unavailable or restricted capacity [staff hours] Result: Usable capacity minus demand; Usable capacity (staff hours; staff hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-019DP30 | Local reporting Correct missing context in divisional statistical returns Inputs and approvalIndicator; Indicator evidence reference; source; source evidence reference; unit; unit evidence reference; geography; geography evidence reference; period; period evidence reference; reviewer; reviewer evidence reference; revision; revision evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP30-020DP30 | Referral completion Track cases through responsible institutions to documented outcomes Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Divisional planning/service officer and relevant sector specialist. Authorized decision-maker for Divisional Secretariats; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-001DP31 | Field reporting Submit overdue required village reports Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-002DP31 | Community observations Identify households needing consented follow-up or referral Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-003DP31 | Case corrections Resolve incomplete or inconsistent village case reports Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-004DP31 | Asset locations Verify missing or uncertain locations of community assets Inputs and approvalMeasured separation between reported locations [m]; Reported source positional accuracy [m]; Reported comparison positional accuracy [m]; Coordinate reference and transformation evidence Result: Location separation (m) DOMAIN-1 / location-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-005DP31 | Disaster impacts Prioritize rapid verification of local disaster impacts Inputs and approvalEvent; Event evidence reference; household reference; household reference evidence reference; observed damage; observed damage evidence reference; date; date evidence reference; location; location evidence reference; assessment protocol; assessment protocol evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-006DP31 | Relief referrals Prepare evidence for authorized relief decisions Inputs and approvalHousehold; Household evidence reference; verified impact; verified impact evidence reference; scheme rules; scheme rules evidence reference; documents; documents evidence reference; existing support; existing support evidence reference; consent; consent evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S29, S38, S39 Context alone does not validate the formula. |
| DEC-DP31-007DP31 | Duplicate assistance Flag possible repeated assistance for divisional review Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-008DP31 | Household updates Schedule verification of reported household changes Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-009DP31 | Certificate evidence Check required evidence before referring certificate requests Inputs and approvalRequest; Request evidence reference; documentary evidence; documentary evidence evidence reference; verification; verification evidence reference; current criteria; current criteria evidence reference; authorized issuer; authorized issuer evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-010DP31 | Vulnerable residents Refer unmet needs through approved support channels Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-011DP31 | Community complaints Escalate unresolved local complaints within jurisdiction Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-012DP31 | Public warnings Identify residents missing authorized emergency messages Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-013DP31 | Community meetings Ensure relevant residents can participate in consultations Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-014DP31 | Local infrastructure Refer damaged public assets to responsible maintainers Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-015DP31 | Land observations Report land-use concerns without making ownership determinations Inputs and approvalDistinct receptors/observations in the defined frame [units]; Distinct receptors matching the stated spatial relation [units]; Boundary edition and spatial predicate; Hazard/constraint/source class and observation period Result: Spatially matched share; Distinct matched receptors (%; units) DOMAIN-1 / point-overlay: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Geometry preparation must use matching coordinate systems, dated boundary editions and valid spatial predicates. Overlap supports referral; it does not determine ownership, permission or site safety. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OVERLAYImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-016DP31 | Field visits Plan feasible household and site follow-up routes Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-017DP31 | Programme follow-up Track referrals to verified service outcomes Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-018DP31 | Record privacy Check permitted use before sharing household information Inputs and approvalFields; Fields evidence reference; purpose; purpose evidence reference; consent or lawful basis; consent or lawful basis evidence reference; recipient; recipient evidence reference; scope; scope evidence reference; approval; approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-019DP31 | Boundary codes Correct local records assigned to inconsistent geographic codes Inputs and approvalRecord location; Record location evidence reference; official GN code; official GN code evidence reference; boundary edition; boundary edition evidence reference; source date; source date evidence reference; crosswalk; crosswalk evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP31-020DP31 | Service feedback Identify recurring local service problems from feedback Inputs and approvalDistinct feedback cases in category [cases]; Cases still unresolved [cases]; Feedback service/category Result: Feedback case count; Share of recorded feedback (cases; %) DOMAIN-1 / feedback: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Grama Niladhari officer with divisional supervisor and relevant service reviewer. Authorized decision-maker for Grama Niladhari Officers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COMPOSITIONImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-001DP32 | Land use Coordinate support for underused member farmland Inputs and approvalRequired eligible frame [ha]; Distinct members of that frame covered [ha]; Frame members with unknown coverage [ha] Result: Verified coverage; Known uncovered; Unknown coverage (%; ha; ha) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-002DP32 | Support fairness Review potentially overlapping assistance to members Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-003DP32 | Irrigation requests Prepare evidence-based seasonal water requests Inputs and approvalIrrigated crop area [ha]; Reference evapotranspiration [mm/day]; Crop coefficient [ratio]; Rainfall reaching the field after runoff [mm/day]; Deep percolation and paddy allowance [mm/day]; Capillary contribution [mm/day]; Desired change in stored soil water [mm/day]; Field application efficiency [fraction] Result: Gross daily irrigation requirement; Net field requirement (m³/day; mm/day) DOMAIN-1 / water: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The full local balance, rooting depth, stress, crop stage and operating constraints still matter. The paddy allowance is explicit and must be zero where inapplicable. This is not an authorized reservoir release. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Crop evapotranspiration ETc component Food and Agriculture Organization of the United Nations · Chapter 5, Crop coefficient approach, equation 56 Institution publication - Food and Agriculture Organization of the United Nations WATERImplementation: prototype |
| DEC-DP32-004DP32 | Service coordination Escalate overdue collective farming requests Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-005DP32 | Water rotations Propose workable water rotations for member areas Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-006DP32 | Tail-end equity Investigate unequal delivery against agreed allocations Inputs and approvalPlanned value [m³]; Observed value [m³] Result: Difference; Relative change (m³; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-007DP32 | Collective inputs Plan joint input purchases against verified member demand Inputs and approvalPhysical stock [kg input]; Quarantined stock [kg input]; Expired stock [kg input]; Committed usable stock [kg input]; Additional demand [kg input]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (kg input; kg input) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-008DP32 | Collective marketing Match aggregated produce with verified buyer requirements Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-009DP32 | Machinery sharing Allocate shared machinery without conflicting reservations Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-010DP32 | Irrigation upkeep Prioritize common tank and canal maintenance requests Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-011DP32 | Group finance Reconcile organization receipts expenses and balances Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-012DP32 | Membership Resolve inconsistent or duplicate member records Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-013DP32 | Governance Address missing meetings audits and required disclosures Inputs and approvalRules; Rules evidence reference; meeting records; meeting records evidence reference; election evidence; election evidence evidence reference; audit findings; audit findings evidence reference; approved obligations; approved obligations evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-014DP32 | Training Target member training to verified skill gaps Inputs and approvalRequired eligible frame [members]; Distinct members of that frame covered [members]; Frame members with unknown coverage [members] Result: Verified coverage; Known uncovered; Unknown coverage (%; members; members) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-015DP32 | Drought plans Compare collective responses to forecast water shortages Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-016DP32 | Crop-loss evidence Coordinate verification of shared crop-damage reports Inputs and approvalEvent; Event evidence reference; member plot; member plot evidence reference; damaged hectares; damaged hectares evidence reference; crop stage; crop stage evidence reference; inspection; inspection evidence reference; claim reference; claim reference evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-017DP32 | Storage Compare collective storage and handling investments Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP32-018DP32 | Participation Resolve member objections to collective plans Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-019DP32 | Member communication Follow up members missing agreed information updates Inputs and approvalRequired eligible frame [members]; Distinct members of that frame covered [members]; Frame members with unknown coverage [members] Result: Verified coverage; Known uncovered; Unknown coverage (%; members; members) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP32-020DP32 | Collective outcomes Evaluate benefits and costs of group farming services Inputs and approvalTreatment Member enterprise gross margin before [LKR/ha]; Treatment Member enterprise gross margin after [LKR/ha]; Comparison Member enterprise gross margin before [LKR/ha]; Comparison Member enterprise gross margin after [LKR/ha]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (LKR/ha) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Farmer-organization committee and relevant agriculture/water adviser. Authorized decision-maker for Farmer Organizations; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP33-001DP33 | Farm profitability Choose crops using transparent enterprise gross margins Inputs and approvalSaleable output [kg]; Realized price [LKR/kg]; Variable costs [LKR]; Matching crop area [ha] Result: Enterprise gross margin; Gross margin per hectare; Variable-cost break-even price (LKR; LKR/ha; LKR/kg) DOMAIN-1 / margin: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep fixed costs, family-labour opportunity cost, taxes and financing identifiable. Gross margin is not net profit. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Verified published formula · Enterprise gross margin Food and Agriculture Organization of the United Nations · Chapter 4, Gross margin and section 4.7.1 Institution publication - Food and Agriculture Organization of the United Nations MARGINImplementation: prototype Method source: S76 |
| DEC-DP33-002DP33 | Irrigation planning Plan irrigation needs for the proposed crop season Inputs and approvalIrrigated crop area [ha]; Reference evapotranspiration [mm/day]; Crop coefficient [ratio]; Rainfall reaching the field after runoff [mm/day]; Deep percolation and paddy allowance [mm/day]; Capillary contribution [mm/day]; Desired change in stored soil water [mm/day]; Field application efficiency [fraction] Result: Gross daily irrigation requirement; Net field requirement (m³/day; mm/day) DOMAIN-1 / water: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The full local balance, rooting depth, stress, crop stage and operating constraints still matter. The paddy allowance is explicit and must be zero where inapplicable. This is not an authorized reservoir release. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Verified published component · Crop evapotranspiration ETc component Food and Agriculture Organization of the United Nations · Chapter 5, Crop coefficient approach, equation 56 Institution publication - Food and Agriculture Organization of the United Nations WATERImplementation: prototype |
| DEC-DP33-003DP33 | Harvest losses Identify handling stages causing verified crop losses Inputs and approvalBatch input on stated moisture basis [kg]; Saleable output [kg]; Usable by-product [kg]; Closing stock [kg]; Documented transfers out [kg] Result: Unaccounted physical share; Unaccounted mass (%; kg) DOMAIN-1 / loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required LOSSImplementation: prototype Method source: S57 |
| DEC-DP33-004DP33 | Planting dates Adjust planned planting against crop calendar and advice Inputs and approvalPlanned milestone/sowing date; Observed completion/sowing date Result: Calendar date difference (days) DOMAIN-1 / dated-variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-005DP33 | Crop choice Compare suitable crop and variety alternatives Inputs and approvalSoil; Soil evidence reference; rainfall; rainfall evidence reference; water; water evidence reference; variety requirements; variety requirements evidence reference; market demand; market demand evidence reference; farm constraints; farm constraints evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-006DP33 | Input budgeting Plan affordable crop inputs with actual cost assumptions Inputs and approvalLabour cost [LKR]; Material/input cost [LKR]; Other non-overlapping cost [LKR]; Verified matching hectares [ha] Result: Cost per matching unit; Total cost (LKR/ha; LKR) DOMAIN-1 / cost-ha: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-007DP33 | Cash needs Identify seasonal cash shortages before commitments Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-008DP33 | Soil advice Seek reviewed nutrient advice using valid soil tests Inputs and approvalParameter and applicable use; Measured result [mg/kg]; Example lower comparison bound [mg/kg]; Example upper comparison bound [mg/kg]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mg/kg) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-009DP33 | Pest diagnosis Decide when to request specialist pest or disease diagnosis Inputs and approvalObserved symptoms; Observed symptoms evidence reference; crop stage; crop stage evidence reference; spread; spread evidence reference; photographs; photographs evidence reference; advisory criteria; advisory criteria evidence reference; date; date evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-010DP33 | Safe crop protection Check proposed treatments against current authorized guidance Inputs and approvalProduct; Product evidence reference; crop; crop evidence reference; pest; pest evidence reference; registration; registration evidence reference; label version; label version evidence reference; restrictions; restrictions evidence reference; adviser recommendation; adviser recommendation evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, DD-PESTICIDES, S03, S04, S31 Context alone does not validate the formula. |
| DEC-DP33-011DP33 | Seed purchase Select seed lots with verified suitability and quality evidence Inputs and approvalVariety; Variety evidence reference; lot ID; lot ID evidence reference; certification; certification evidence reference; germination; germination evidence reference; expiry; expiry evidence reference; required quantity; required quantity evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-012DP33 | Labour planning Schedule available labour around critical crop operations Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-013DP33 | Machinery choice Compare hiring and ownership of farm machinery Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP33-014DP33 | Selling decisions Compare buyer offers after costs and quality differences Inputs and approvalComparable purchase quotation [LKR/kg]; Comparable selling quotation [LKR/kg]; Non-overlapping transfer costs [LKR/kg]; Expected saleable mass loss [%]; Product, grade and price basis Result: Quoted net return per purchased kg; Unadjusted quoted spread (LKR/kg; LKR/kg) DOMAIN-1 / price: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use matching grade, price date, currency, mass basis and payment terms. This quotation scenario excludes unlisted costs and is not realized profit or a forecast. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required PRICEImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-015DP33 | Buyer matching Identify feasible buyers for available produce Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-016DP33 | Drought adaptation Compare feasible water-saving and crop-adaptation options Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-017DP33 | Storage decisions Compare immediate sale with safe storage alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP33-018DP33 | Farm investment Appraise proposed farm improvements under realistic scenarios Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP33-019DP33 | Support applications Prepare complete evidence for relevant farmer-support schemes Inputs and approvalScheme criteria; Scheme criteria evidence reference; farm records; farm records evidence reference; identity consent; identity consent evidence reference; prior support; prior support evidence reference; required documents; required documents evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S03, S04, S31 Context alone does not validate the formula. |
| DEC-DP33-020DP33 | Farm recordkeeping Identify missing records needed for reliable farm analysis Inputs and approvalPlot; Plot evidence reference; crop; crop evidence reference; dates; dates evidence reference; units; units evidence reference; purchases; purchases evidence reference; harvest; harvest evidence reference; sales; sales evidence reference; source documents; source documents evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Farmer with qualified agriculture/water/finance adviser for the decision. Farmer or authorized household decision-maker; obtain statutory approvals where required. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-001DP34 | Production economics Target estate crop and seasonal cost drivers Inputs and approvalLabour cost [LKR]; Material/input cost [LKR]; Other non-overlapping cost [LKR]; Verified output or service quantity [kg] Result: Cost per matching unit; Total cost (LKR/kg; LKR) DOMAIN-1 / cost-output: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-002DP34 | Soil and water Evaluate soil and water-management practice outcomes Inputs and approvalTreatment Measured runoff before [mm/season]; Treatment Measured runoff after [mm/season]; Comparison Measured runoff before [mm/season]; Comparison Measured runoff after [mm/season]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (mm/season) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP34-003DP34 | Replanting areas Prioritize blocks for replanting or rehabilitation Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-004DP34 | Worker services Address gaps in verified worker-support coverage Inputs and approvalRequired eligible frame [workers]; Distinct members of that frame covered [workers]; Frame members with unknown coverage [workers] Result: Verified coverage; Known uncovered; Unknown coverage (%; workers; workers) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-005DP34 | Crop suitability Compare crops and cultivars for estate conditions Inputs and approvalSoil; Soil evidence reference; elevation; elevation evidence reference; rainfall; rainfall evidence reference; temperature; temperature evidence reference; shade; shade evidence reference; cultivar requirements; cultivar requirements evidence reference; restrictions; restrictions evidence reference Result: Evidence gaps (items) DOMAIN-1 / suitability: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SUITABILITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-006DP34 | Planting survival Target maintenance to weak new-planting cohorts Inputs and approvalOriginal cohort [plants]; Known surviving original members [plants]; Known failed original members [plants]; Original members with unknown follow-up [plants]; Replacements in a separate cohort [plants] Result: Confirmed survival lower bound; Survival upper bound; Unknown follow-up (%; %; plants) DOMAIN-1 / survival: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVIVALImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-007DP34 | Erosion control Prioritize conservation treatment in vulnerable estate blocks Inputs and approvalRainfall erosivity [MJ mm/(ha h year)]; Soil erodibility [t ha h/(ha MJ mm)]; Slope-length and steepness factor [ratio]; Cover-management factor [fraction]; Support-practice factor [fraction] Result: Estimated annual sheet/rill loss (t/ha/year) DOMAIN-1 / erosion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits This USLE factor product is not a full RUSLE2 run, measured loss, delivered sediment, gully loss or landslide forecast. Local factors and uncertainty need review. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · USLE factor product United States Department of Agriculture Forest Service · 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40 Government publication - United States Department of Agriculture Forest Service EROSIONImplementation: prototype Method source: S80 |
| DEC-DP34-008DP34 | Harvest scheduling Plan harvesting around maturity weather and capacity Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-009DP34 | Pest management Refer unusual plantation pest and disease patterns Inputs and approvalComparable reference value [affected plants per 100 inspected]; Later/comparison value [affected plants per 100 inspected] Result: Difference; Relative change (affected plants per 100 inspected; %) DOMAIN-1 / anomaly: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ANOMALYImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-010DP34 | Processing efficiency Investigate poor conversion of harvest to saleable product Inputs and approvalInput mass on matching moisture basis [kg]; Saleable output on matching basis [kg]; Usable by-products [kg] Result: Saleable mass conversion (%) DOMAIN-1 / mass-conversion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-011DP34 | Energy and water Target resource-efficiency improvements in estate operations Inputs and approvalSaleable product [kg]; Electric energy [kWh]; Process water [m³]; Raw material input [kg] Result: Energy per product; Water per product; Saleable mass conversion (kWh/kg; m³/kg; %) DOMAIN-1 / resource-efficiency: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-012DP34 | Product quality Investigate product lots failing applicable specifications Inputs and approvalParameter and applicable use; Measured result [%]; Example lower comparison bound [%]; Example upper comparison bound [%]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (%) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-013DP34 | Climate resilience Compare estate adaptation investments Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP34-014DP34 | Worker safety Prioritize documented occupational hazards for competent review Inputs and approvalTask hazards; Task hazards evidence reference; exposure; exposure evidence reference; incident evidence; incident evidence evidence reference; controls; controls evidence reference; inspections; inspections evidence reference; requirements; requirements evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: DD-ILO |
| DEC-DP34-015DP34 | Water and housing Identify estate communities with service deficits Inputs and approvalRequired eligible frame [workers]; Distinct members of that frame covered [workers]; Frame members with unknown coverage [workers] Result: Verified coverage; Known uncovered; Unknown coverage (%; workers; workers) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-016DP34 | Maintenance Schedule critical estate and factory equipment maintenance Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-017DP34 | Traceability Resolve breaks in estate product provenance Inputs and approvalUpstream lot/source reference; Downstream lot/batch reference; Exact upstream source version; Recorded upstream issue Result: Broken or affected lineage (items) DOMAIN-1 / lineage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-018DP34 | Carbon evidence Review estate carbon-stock estimates and pool coverage Inputs and approvalEarlier carbon density [t C/ha]; Later carbon density [t C/ha]; Same inventory area [ha]; Included pools and allometry references Result: Carbon stock change; Carbon-density change (t C; t C/ha) DOMAIN-1 / carbon: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Inventory plots, allometry and uncertainty remain required evidence. Stock change is not an issued carbon credit, additionality test or payable service. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · Carbon stock-difference component Intergovernmental Panel on Climate Change · Section 2.3.1.1, equation 2.8, stock-difference method Institution publication - Intergovernmental Panel on Climate Change CARBONImplementation: prototype Method source: S79 |
| DEC-DP34-019DP34 | Community consultation Resolve concerns around estate development proposals Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP34-020DP34 | Estate classifications Reconcile inconsistent block crop and land-use records Inputs and approvalBlock ID; Block ID evidence reference; crop labels; crop labels evidence reference; planted area; planted area evidence reference; source edition; source edition evidence reference; definitions; definitions evidence reference; steward; steward evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Estate agronomist, operations lead and environmental/social reviewer. Authorized decision-maker for Plantation Companies; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-001DP35 | Training and services Identify worker groups missing agreed services Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-002DP35 | Issue follow-up Escalate unresolved worker and community issues Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-003DP35 | Programme overlap Review overlapping assistance without exposing private identities Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-004DP35 | Verified outcomes Identify programmes lacking baseline and follow-up evidence Inputs and approvalProgramme cohort; Programme cohort evidence reference; baseline outcome; baseline outcome evidence reference; follow-up; follow-up evidence reference; verification; verification evidence reference; attrition; attrition evidence reference; context; context evidence reference Result: Study evidence gaps (items) DOMAIN-1 / study-design: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required IMPACTImplementation: prototype Method source: S92 |
| DEC-DP35-005DP35 | Drinking water Refer documented water-quality concerns to qualified services Inputs and approvalParameter and applicable use; Measured result [NTU]; Example lower comparison bound [NTU]; Example upper comparison bound [NTU]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (NTU) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-006DP35 | Sanitation Prioritize community sanitation improvements Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-007DP35 | Housing safety Refer unsafe housing observations for qualified assessment Inputs and approvalBuilding condition; Building condition evidence reference; occupancy; occupancy evidence reference; hazards; hazards evidence reference; inspection evidence; inspection evidence evidence reference; referral authority; referral authority evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-008DP35 | Childcare access Address gaps in access to appropriate childcare services Inputs and approvalDemand in the selected period [childcare places]; Rated capacity for that period [childcare places]; Unavailable or restricted capacity [childcare places] Result: Usable capacity minus demand; Usable capacity (childcare places; childcare places) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-009DP35 | Health referrals Follow up access to qualified health services Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-010DP35 | Skills development Select training topics aligned with livelihood needs Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-011DP35 | Livelihood alternatives Compare feasible supplementary livelihood options Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-012DP35 | Workplace concerns Refer documented occupational safety concerns Inputs and approvalTask hazard; Task hazard evidence reference; incident evidence; incident evidence evidence reference; current controls; current controls evidence reference; worker concerns; worker concerns evidence reference; competent recipient; competent recipient evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: DD-ILO |
| DEC-DP35-013DP35 | Service accessibility Compare travel barriers to essential community services Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-014DP35 | Disaster preparedness Identify residents missing agreed preparedness arrangements Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-015DP35 | Participation Ensure affected workers can respond to development proposals Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-016DP35 | Community facilities Prioritize repair referrals for shared facilities Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-017DP35 | Support eligibility Prepare evidence for authorized community-support decisions Inputs and approvalScheme; Scheme evidence reference; applicant evidence; applicant evidence evidence reference; requirements; requirements evidence reference; prior support; prior support evidence reference; consent; consent evidence reference; referral; referral evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S13, S42, S47 Context alone does not validate the formula. |
| DEC-DP35-018DP35 | Community funds Reconcile approved group contributions and expenditure Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-019DP35 | Communication Improve delivery of agreed community information Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP35-020DP35 | Privacy and safeguarding Determine safe sharing of sensitive community case information Inputs and approvalPurpose; Purpose evidence reference; consent or lawful basis; consent or lawful basis evidence reference; required fields; required fields evidence reference; recipient; recipient evidence reference; classification; classification evidence reference; approval; approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community representative, service specialist and safeguarding reviewer. Authorized decision-maker for Plantation Workers/Community Groups; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-001DP36 | Supply matching Match available produce with compatible dated buyer demand Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-002DP36 | Procurement prices Compare procurement offers for equivalent product grades Inputs and approvalComparable purchase quotation [LKR/kg]; Comparable selling quotation [LKR/kg]; Non-overlapping transfer costs [LKR/kg]; Expected saleable mass loss [%]; Product, grade and price basis Result: Quoted net return per purchased kg; Unadjusted quoted spread (LKR/kg; LKR/kg) DOMAIN-1 / price: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use matching grade, price date, currency, mass basis and payment terms. This quotation scenario excludes unlisted costs and is not realized profit or a forecast. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required PRICEImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-003DP36 | Trading spreads Investigate wholesale and retail spreads after costs Inputs and approvalComparable purchase quotation [LKR/kg]; Comparable selling quotation [LKR/kg]; Non-overlapping transfer costs [LKR/kg]; Expected saleable mass loss [%]; Product, grade and price basis Result: Quoted net return per purchased kg; Unadjusted quoted spread (LKR/kg; LKR/kg) DOMAIN-1 / price: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use matching grade, price date, currency, mass basis and payment terms. This quotation scenario excludes unlisted costs and is not realized profit or a forecast. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required PRICEImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-004DP36 | Delivery commitments Prioritize time-sensitive buyer orders Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-005DP36 | Supplier reliability Review supplier delivery performance using accepted records Inputs and approvalPlanned value [kg]; Observed value [kg] Result: Difference; Relative change (kg; %) DOMAIN-1 / variance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required VARIANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-006DP36 | Product acceptance Refer received lots failing agreed quality specifications Inputs and approvalParameter and applicable use; Measured result [%]; Example lower comparison bound [%]; Example upper comparison bound [%]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (%) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-007DP36 | Stock management Plan replenishment without overcommitting perishable stock Inputs and approvalPhysical stock [kg]; Quarantined stock [kg]; Expired stock [kg]; Committed usable stock [kg]; Additional demand [kg]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (kg; kg) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-008DP36 | Spoilage reduction Identify handling and storage stages with verified losses Inputs and approvalBatch input on stated moisture basis [kg]; Saleable output [kg]; Usable by-product [kg]; Closing stock [kg]; Documented transfers out [kg] Result: Unaccounted physical share; Unaccounted mass (%; kg) DOMAIN-1 / loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required LOSSImplementation: prototype Method source: S57 |
| DEC-DP36-009DP36 | Transport planning Compare feasible collection and delivery routes Inputs and approvalVerified route distance [km]; Estimated route travel time [minutes]; Usable vehicle/team capacity [units]; Required capacity [units]; Access, closures and operating conditions; Operating and service window Result: Estimated travel time; Capacity minus demand (minutes; units) DOMAIN-1 / route: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Straight-line distance is not a road route. Example routes establish no current road status, emergency clearance or safe evacuation instruction. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ROUTEImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-010DP36 | Storage choice Compare storage with immediate sale under price uncertainty Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-011DP36 | Trading cash flow Identify cash gaps from buying and selling schedules Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-012DP36 | Buyer payments Follow up overdue customer payments within agreed terms Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-013DP36 | Customer dependence Review exposure to a small number of buyers Inputs and approvalCompatible category amount [LKR] Result: Category amount; Share of selected total (LKR; %) DOMAIN-1 / concentration: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · HHI concentration component United States Department of Justice · Definition and four-firm worked example Government publication - United States Department of Justice CONCENTRATIONImplementation: prototype Method source: S83 |
| DEC-DP36-014DP36 | Supplier dependence Compare sourcing alternatives where supply is concentrated Inputs and approvalCompatible category amount [kg] Result: Category amount; Share of selected total (kg; %) DOMAIN-1 / concentration: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · HHI concentration component United States Department of Justice · Definition and four-firm worked example Government publication - United States Department of Justice CONCENTRATIONImplementation: prototype Method source: S83 |
| DEC-DP36-015DP36 | Price variability Adjust procurement exposure after reviewing price volatility Inputs and approvalComparable observation [LKR/kg] Result: Observed value (LKR/kg) DOMAIN-1 / volatility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match definitions, methods, grade, location and reference basis. Gaps are not joined. Descriptive variation is not a forecast, causal effect or significant trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Sample coefficient of variation National Institute of Standards and Technology United States · Description, sample coefficient of variation and ratio-scale restrictions Government publication - National Institute of Standards and Technology United States VOLATILITYImplementation: prototype Method source: S84 |
| DEC-DP36-016DP36 | Traceability Resolve missing provenance for traded lots Inputs and approvalUpstream lot/source reference; Downstream lot/batch reference; Exact upstream source version; Recorded upstream issue Result: Broken or affected lineage (items) DOMAIN-1 / lineage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-017DP36 | Market expansion Compare candidate markets against logistics and demand Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-018DP36 | Contract readiness Check evidence before entering supply agreements Inputs and approvalOffer; Offer evidence reference; quantity; quantity evidence reference; grade; grade evidence reference; delivery; delivery evidence reference; payment terms; payment terms evidence reference; authority; authority evidence reference; documented conditions; documented conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-019DP36 | Packaging choices Compare packaging options for losses cost and buyer needs Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP36-020DP36 | Product catalogue Correct inconsistent product grades and quantity units Inputs and approvalSource product; Source product evidence reference; grade definition; grade definition evidence reference; unit; unit evidence reference; conversion evidence; conversion evidence evidence reference; reference catalogue; reference catalogue evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Procurement/sales manager and quality/logistics reviewer. Authorized decision-maker for Buyers and Traders; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-001DP37 | Processing yield Improve conversion of inputs into saleable output Inputs and approvalInput mass on matching moisture basis [kg]; Saleable output on matching basis [kg]; Usable by-products [kg] Result: Saleable mass conversion (%) DOMAIN-1 / mass-conversion: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-002DP37 | Logistics costs Investigate high shipment cost per tonne-kilometre Inputs and approvalShipment cost [LKR]; Actual carried load [t]; Verified travelled route distance [km] Result: Shipment cost per tonne-kilometre (LKR/(t km)) DOMAIN-1 / tonne-km: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-003DP37 | Cold chain Investigate shipments outside approved temperature conditions Inputs and approvalParameter and applicable use; Measured result [°C]; Example lower comparison bound [°C]; Example upper comparison bound [°C]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (°C) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-004DP37 | Export performance Review export unit values and destination performance Inputs and approvalRecorded export value [LKR]; Export quantity on matching product basis [kg] Result: Output per resource (LKR/kg) DOMAIN-1 / export-unit-value: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A unit value mixes prices and product composition. It is not automatically a like-for-like market price. Match grade, product code, currency and period. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-005DP37 | Raw materials Match processing demand to compatible supplier lots Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-006DP37 | Capacity planning Compare orders with usable processing capacity Inputs and approvalDemand in the selected period [machine hours]; Rated capacity for that period [machine hours]; Unavailable or restricted capacity [machine hours] Result: Usable capacity minus demand; Usable capacity (machine hours; machine hours) DOMAIN-1 / capacity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match peak/average basis, time window, skill, staffing, accessibility and other binding constraints. One aggregate capacity does not override a safety constraint. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CAPACITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-007DP37 | Production scheduling Schedule batches around quality and delivery constraints Inputs and approvalRequired resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites Result: Planned duration; Resource hours remaining (days; hours) DOMAIN-1 / schedule: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-008DP37 | Quality assurance Prioritize product nonconformities for technical investigation Inputs and approvalParameter and applicable use; Measured result [mm]; Example lower comparison bound [mm]; Example upper comparison bound [mm]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis Result: Measured value (mm) DOMAIN-1 / quality: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUALITYImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-009DP37 | Traceability and recall Identify affected lots when a source defect is confirmed Inputs and approvalUpstream lot/source reference; Downstream lot/batch reference; Exact upstream source version; Recorded upstream issue Result: Broken or affected lineage (items) DOMAIN-1 / affected-lots: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-010DP37 | Food loss Select loss-reduction actions at processing bottlenecks Inputs and approvalBatch input on stated moisture basis [kg]; Saleable output [kg]; Usable by-product [kg]; Closing stock [kg]; Documented transfers out [kg] Result: Unaccounted physical share; Unaccounted mass (%; kg) DOMAIN-1 / loss: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use a consistent moisture basis and process boundary. Unaccounted mass is not automatically avoidable food loss or spoilage. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required LOSSImplementation: prototype Method source: S57 |
| DEC-DP37-011DP37 | Energy efficiency Target processes with high energy per saleable unit Inputs and approvalEnergy consumed [kWh]; Saleable product output [kg] Result: Specific energy use (kWh/kg) DOMAIN-1 / process-energy: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required YIELDImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-012DP37 | Water efficiency Compare process water use and reuse alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-013DP37 | Equipment reliability Prioritize critical equipment repairs and preventive work Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-014DP37 | Inventory expiry Avoid using expired or quarantined materials Inputs and approvalPhysical stock [kg]; Quarantined stock [kg]; Expired stock [kg]; Committed usable stock [kg]; Additional demand [kg]; Supplier lead time [days]; Remaining shelf life of usable stock [days] Result: Uncommitted usable stock; Additional demand gap (kg; kg) DOMAIN-1 / inventory: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Stock must be compatible by item, lot, condition, expiry and delivery window. Do not allocate quarantined/expired stock or silently erase overcommitment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INVENTORYImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-015DP37 | Packaging compliance Check packaging against destination and buyer requirements Inputs and approvalProduct; Product evidence reference; packaging; packaging evidence reference; label version; label version evidence reference; destination rules; destination rules evidence reference; buyer specification; buyer specification evidence reference; review; review evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-016DP37 | Working capital Identify cash shortfalls across purchase production and payment cycles Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-017DP37 | Expansion appraisal Compare equipment and facility expansion investments Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP37-018DP37 | Export documentation Refer complete shipment documentation for required clearance Inputs and approvalShipment; Shipment evidence reference; certificates; certificates evidence reference; origin; origin evidence reference; permits; permits evidence reference; specification; specification evidence reference; current requirements; current requirements evidence reference; authority; authority evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S31, S33, S34 Context alone does not validate the formula. |
| DEC-DP37-019DP37 | Workforce capability Target technical training to process-quality and safety gaps Inputs and approvalRequired eligible frame [workers]; Distinct members of that frame covered [workers]; Frame members with unknown coverage [workers] Result: Verified coverage; Known uncovered; Unknown coverage (%; workers; workers) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP37-020DP37 | Process records Correct missing units versions and batch references Inputs and approvalProcess record; Process record evidence reference; batch; batch evidence reference; timestamp; timestamp evidence reference; measurement unit; measurement unit evidence reference; calibration; calibration evidence reference; source; source evidence reference; version; version evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Production/quality manager and trade/logistics/finance specialist. Authorized decision-maker for Processors and Exporters; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-001DP38 | Investment appraisal Select investments for detailed cash-flow appraisal Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP38-002DP38 | Repayment capacity Assess debt-service coverage under lender-defined scenarios Inputs and approvalCash available for debt service [LKR]; Scheduled principal for same period [LKR]; Scheduled interest for same period [LKR]; Repayment and cash-flow period Result: Debt-service coverage; Cash after scheduled debt service (ratio; LKR) DOMAIN-1 / debt: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits No lender covenant, credit decision, borrower eligibility or legal consequence is inferred. Seasonal repayment timing and downside scenarios remain explicit. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required DEBTImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-003DP38 | Co-financing Identify gaps between required finance and confirmed commitments Inputs and approvalApproved financing need [LKR]; Confirmed commitments [LKR]; Funds actually disbursed [LKR]; Verified eligible expenditure [LKR] Result: Unfunded need; Committed but not disbursed; Disbursed but not spent (LKR; LKR; LKR) DOMAIN-1 / funding: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep commitments, cash receipts, expenditure and verified physical outputs separate. Negative balances flag overcommitment or reconciliation; no automatic accounting adjustment. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-004DP38 | Sensitivity Compare investment viability under reviewed stress assumptions Inputs and approvalInitial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%] Result: Five-year net present value (LKR) DOMAIN-1 / finance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Discounted cash-flow NPV Food and Agriculture Organization of the United Nations · Sections 2.2.2 and 2.2.3, discounting and Net Present Value Institution publication - Food and Agriculture Organization of the United Nations FINANCEImplementation: prototype Method source: S81 |
| DEC-DP38-005DP38 | Climate risk Refer climate-exposed financing cases for specialist assessment Inputs and approvalAsset locations; Asset locations evidence reference; hazards; hazards evidence reference; exposure; exposure evidence reference; adaptation; adaptation evidence reference; insurance; insurance evidence reference; sector vulnerability; sector vulnerability evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-006DP38 | Environmental and social risk Evaluate documented environmental and social controls Inputs and approvalProject screening; Project screening evidence reference; permits; permits evidence reference; affected people; affected people evidence reference; safeguards; safeguards evidence reference; controls; controls evidence reference; lender policy; lender policy evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-007DP38 | Green taxonomy Refer proposed green-finance classifications for verification Inputs and approvalActivity; Activity evidence reference; taxonomy edition; taxonomy edition evidence reference; technical criteria; technical criteria evidence reference; safeguards; safeguards evidence reference; evidence; evidence evidence reference; reviewer; reviewer evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S73, S43, S44 Context alone does not validate the formula. |
| DEC-DP38-008DP38 | Credit evidence Identify missing or contradictory borrower evidence Inputs and approvalOriginal source value/definition; Comparison source value/definition; Original version; Comparison version; Documented equivalence evidence Result: Unresolved equivalence items (items) DOMAIN-1 / mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-009DP38 | Seasonal lending Compare repayment schedules with agricultural cash generation Inputs and approvalCash available for debt service [LKR]; Scheduled principal for same period [LKR]; Scheduled interest for same period [LKR]; Repayment and cash-flow period Result: Debt-service coverage; Cash after scheduled debt service (ratio; LKR) DOMAIN-1 / debt: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits No lender covenant, credit decision, borrower eligibility or legal consequence is inferred. Seasonal repayment timing and downside scenarios remain explicit. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required DEBTImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-010DP38 | Portfolio concentration Review sector geography and counterparty exposure concentration Inputs and approvalCompatible category amount [LKR] Result: Category amount; Share of selected total (LKR; %) DOMAIN-1 / concentration: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Categories must be mutually exclusive and cover the stated frame. Do not mix values, quantities, plots or hectares, or treat an HHI competition threshold as an institutional policy. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published component · HHI concentration component United States Department of Justice · Definition and four-firm worked example Government publication - United States Department of Justice CONCENTRATIONImplementation: prototype Method source: S83 |
| DEC-DP38-011DP38 | Arrears management Prioritize overdue cases for authorized engagement Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-012DP38 | Collateral review Refer collateral evidence gaps to qualified valuers and legal teams Inputs and approvalAsset; Asset evidence reference; valuation date; valuation date evidence reference; rights documents; rights documents evidence reference; encumbrances; encumbrances evidence reference; hazards; hazards evidence reference; review conditions; review conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-013DP38 | Disbursement conditions Verify prerequisites before authorized disbursement decisions Inputs and approvalFacility terms; Facility terms evidence reference; conditions precedent; conditions precedent evidence reference; documents; documents evidence reference; approvals; approvals evidence reference; borrower consent; borrower consent evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-014DP38 | Impact claims Review evidence supporting financed environmental and social outcomes Inputs and approvalTreatment Verified environmental/social indicator before [specified outcome unit]; Treatment Verified environmental/social indicator after [specified outcome unit]; Comparison Verified environmental/social indicator before [specified outcome unit]; Comparison Verified environmental/social indicator after [specified outcome unit]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (specified outcome unit) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP38-015DP38 | Application processing Resolve financing applications stalled at required review stages Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-016DP38 | Guarantee programmes Refer guarantee requests against approved scheme criteria Inputs and approvalScheme version; Scheme version evidence reference; applicant; applicant evidence reference; qualifying use; qualifying use evidence reference; evidence; evidence evidence reference; coverage conditions; coverage conditions evidence reference; authority; authority evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S43, S44, S73 Context alone does not validate the formula. |
| DEC-DP38-017DP38 | Financial inclusion Identify gaps in access to appropriate financing services Inputs and approvalRequired eligible frame [applicants]; Distinct members of that frame covered [applicants]; Frame members with unknown coverage [applicants] Result: Verified coverage; Known uncovered; Unknown coverage (%; applicants; applicants) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-018DP38 | Liquidity planning Compare expected funding inflows with committed disbursements Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-019DP38 | Adaptation finance Compare financing alternatives for resilient farm and enterprise investments Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP38-020DP38 | Financial privacy Determine permitted use and sharing of client data Inputs and approvalPurpose; Purpose evidence reference; lawful basis; lawful basis evidence reference; consent; consent evidence reference; classification; classification evidence reference; recipient; recipient evidence reference; access scope; access scope evidence reference; expiry; expiry evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Authorized credit/risk analyst and environmental/social specialist. Authorized decision-maker for Banks and Finance Institutions; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP39-001DP39 | Verification schedule Which field checks are due? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Agreed check date; Date of this review; Proposed checking team; Field visit arranged Result: Days past the check date (calendar days) PES-1 / 001: Book an independent check before a claim is considered. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SCHEDULEImplementation: prototype Method source: PES-FAO |
| DEC-DP39-002DP39 | Service delivery How much agreed work passed the check? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Area in the annual agreement [ha]; Area visited and checked [ha]; Area meeting the agreed conditions [ha]; Checked area needing correction [ha]; Area not checked yet [ha]; Signed field-check record; Field record and protocol Result: Area meeting the conditions; Area still to check; Area needing correction (ha; ha; ha) PES-1 / 002: Separate work that passed, failed and still needs a visit. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required PESImplementation: prototype |
| DEC-DP39-003DP39 | Service accounting What was checked, proposed and paid? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Area meeting annual conditions [ha]; Payment proposed for this agreement and year [LKR]; Payment authorised in a separate decision [LKR]; Payment actually recorded [LKR]; Payment record or pending reference Result: Area meeting the conditions; Proposed payment; Recorded payment; Authorised amount not yet paid (ha; LKR; LKR; LKR) PES-1 / 003: Keep the physical work record and the money record separate. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCOUNTImplementation: prototype |
| DEC-DP39-004DP39 | Verification cost How much does a field check cost? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Checking staff cost [LKR]; Travel and field cost [LKR]; Other checking costs without overlap [LKR]; Area accepted under the same protocol [ha] Result: Checking cost per accepted hectare; Total checking cost (LKR/ha; LKR) PES-1 / 004: Compare verification costs using the same agreed unit. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COSTImplementation: prototype Method source: PES-FAO |
| DEC-DP39-005DP39 | Scheme readiness Is the scheme ready to start? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Responsible scheme owner identified; Authority to run the scheme confirmed; Work and intended environmental benefit defined; Payer and funding commitment recorded; Checking and payment rules recorded; Complaint and appeal route recorded; Scheme-rule document Result: Items to settle (items) PES-1 / 005: Identify who must settle missing scheme rules. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: PES-FAO |
| DEC-DP39-006DP39 | Provider eligibility Can this group join the scheme? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Land or resource-use rights documented; Voluntary participation recorded; Proposed area identified; Applicable joining rules recorded; Work and payment conditions understood; Joining-rule and application reference Result: Items to settle before referral (items) PES-1 / 006: Refer an application using the agreed joining rules. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: PES-FAO Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S13, S58, S60 Context alone does not validate the formula. |
| DEC-DP39-007DP39 | Additionality Did the scheme add an environmental improvement? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Scheme ground cover before [%]; Scheme ground cover after [%]; Comparison ground cover before [%]; Comparison ground cover after [%]; Earlier observation; Later observation; Comparable sites, season and method documented; Baseline and existing obligations Result: Difference between the two changes; Change inside the scheme; Change at the comparison site (percentage points; percentage points; percentage points) PES-1 / 007: Compare the same indicator inside the scheme and at a suitable comparison site. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype |
| DEC-DP39-008DP39 | Leakage Did land clearing move outside the agreement area? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; New clearing in the neighbouring area before [ha]; New clearing in the neighbouring area after [ha]; New clearing in a separate comparison area before [ha]; New clearing in the comparison area after [ha]; Earlier observation; Later observation; Equal observation windows and fixed comparable areas documented; Map and field-check reference Result: Difference between the two increases; Increase in neighbouring clearing; Increase in comparison-area clearing (ha; ha; ha) PES-1 / 008: Check neighbouring land for possible displacement of damage. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype |
| DEC-DP39-009DP39 | Permanence Could the agreed work be lost or damaged? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Previously accepted area [ha]; Area reported as damaged [ha]; Damage checked in the field; Required repair or response plan recorded; Reported cause and evidence Result: Reported area needing follow-up (ha) PES-1 / 009: Arrange a field check and the response required by the agreement. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: PES-FAO |
| DEC-DP39-010DP39 | Contract design Which service agreement is practical? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Proposed provider payment [LKR/year]; Monitoring and checking cost [LKR/year]; Available annual scheme budget [LKR/year]; Work can be checked with a defined protocol; Rights and voluntary participation documented; Livelihood and environmental safeguards documented; Intended benefit and evidence needed Result: Annual budget left after the proposal; Total annual scheme cost (LKR/year; LKR/year) PES-1 / 010: Compare cost, measurable work and provider safeguards together. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: PES-FAO |
| DEC-DP39-011DP39 | Payment proposals What payment can we propose? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Area meeting the annual agreement conditions [ha]; Illustrative annual rate per accepted hectare [LKR/ha/year]; Annual cap for this agreement [LKR/year]; Amount already paid for these same annual conditions [LKR]; Independent field-check record documented; Rights and voluntary agreement documented; Funding confirmation documented; Field-check and rate references; Confirmed funds available for this annual proposal [LKR] Result: Calculated annual proposal before payments; Proposal less amount already paid; Amount ready to refer for authorisation (LKR; LKR; LKR) PES-1 / 011: Calculate an example amount, then check the agreement evidence. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required PESImplementation: prototype |
| DEC-DP39-012DP39 | Benefit sharing How would the payment be shared? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Payment available in the proposed plan [LKR]; Proposed farmer-group share [LKR]; Proposed field-worker share [LKR]; Disclosed administration share [LKR]; Unresolved objections [cases]; Affected participants agreed to this version; Sharing-plan version Result: Amount allocated in the draft plan; Amount not allocated; Unresolved objections (LKR; LKR; cases) PES-1 / 012: Check the amounts and resolve objections before confirming a sharing plan. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: PES-FAO |
| DEC-DP39-013DP39 | Double counting Is the same work being claimed twice? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Parcel or mapped work reference; Other agreement and purpose; Area claimed in this agreement [ha]; Area claimed in the other agreement [ha]; Mapped area common to both claims [ha]; This claim begins; This claim ends; Other claim begins; Other claim ends; Same work and unit confirmed; Both agreements permit the combined claims Result: Overlapping claim area to review; Overlapping claim period (ha; calendar days) PES-1 / 013: Review the same place, work and period before deciding whether claims conflict. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: PES-FAO |
| DEC-DP39-014DP39 | Monitoring design How should we measure the work and its benefits? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Indicator; Measurement unit; What the indicator measures; When to measure; Estimated annual monitoring cost [LKR/year]; Sampling method and quality checks documented; Comparable baseline available Result: Annual monitoring cost to compare (LKR/year) PES-1 / 014: Choose a repeatable work check and a separate environmental outcome measure. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: PES-FAO |
| DEC-DP39-015DP39 | Funding sustainability Is there enough money for the full agreement? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Provider payments, checking and administration per year [LKR/year]; Agreement funding period [years]; Confirmed funding for that full period [LKR]; Money actually received under that commitment [LKR]; Eligible expenditure already recorded [LKR] Result: Funding still to secure; Total funding needed for the full period; Committed money not yet received; Received money not yet spent (LKR; LKR; LKR; LKR) PES-1 / 015: Separate future commitments, money received and money spent. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FUNDINGImplementation: prototype Method source: PES-FAO |
| DEC-DP39-016DP39 | Provider safeguards Could participation harm a household or its rights? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Land and resource-use rights understood; Food-production effects checked; Income and labour effects checked; Women and vulnerable groups can participate; Voluntary informed participation recorded; Accessible complaint route recorded; Safeguard review reference Result: Safeguard items still to resolve (items) PES-1 / 016: Resolve livelihood and participation risks before proceeding. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: PES-FAO |
| DEC-DP39-017DP39 | Grievances and appeals Which complaints need a response? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Complaint; Complaint received; Response due under the recorded procedure; Review date; Complaint closed; Responsible contact role; Appeal route Result: Calendar days past response deadline; Calendar days since receipt (days; days) PES-1 / 017: Show the recorded deadline and who should respond. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: PES-FAO |
| DEC-DP39-018DP39 | Independent review Is the checker independent? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Who prepared the claim; Who checks the claim; Checking role and appointment documented; Interests and independence checks documented; Checking protocol documented; Signed findings recorded; Independence review reference Result: Independence items to resolve (items) PES-1 / 018: Check who prepared the claim, who reviews it and any declared interests. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: PES-FAO |
| DEC-DP39-019DP39 | Renewal decisions Should the agreement continue, change or close? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Choice to review; Estimated next-period cost or closure cost [LKR]; Results and outstanding obligations reviewed; Provider feedback reviewed; Funding or closure resources confirmed; Work or commitments that still need attention Result: Cost of this choice to compare (LKR) PES-1 / 019: Compare the three choices using results, obligations, feedback and funding. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: PES-FAO |
| DEC-DP39-020DP39 | Scheme records Do the service name, unit and agreement match? Inputs and approvalAgreement and version; Who carries out the work; Who funds the agreement; Name used in the source; Name in the agreement; Unit used in the source; Unit required by the agreement; Matching meaning confirmed by the data owner; Definition and mapping reference Result: Definition issue to resolve (items) PES-1 / 020: Ask the data owner to resolve differences before joining records. Limits Illustrative watershed-care agreement. Contract rules, rate, payer, monitoring and safeguards need confirmation in Institution review. Maintained hectares do not establish a measured water-quality improvement. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Scheme technical lead, independent verifier and rights/finance reviewer. Authorized decision-maker for PES Intermediaries; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: PES-FAO |
| DEC-DP40-001DP40 | Dataset selection Select datasets suitable for spatial and temporal comparison Inputs and approvalCoverage; Coverage evidence reference; dates; dates evidence reference; methods; methods evidence reference; units; units evidence reference; sampling; sampling evidence reference; rights; rights evidence reference; source versions; source versions evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-002DP40 | Intervention research Compare validated soil and forest outcomes across interventions Inputs and approvalTreatment Comparable soil-carbon stock before [t C/ha]; Treatment Comparable soil-carbon stock after [t C/ha]; Comparison Comparable soil-carbon stock before [t C/ha]; Comparison Comparable soil-carbon stock after [t C/ha]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (t C/ha) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP40-003DP40 | Sampling limitations Identify biodiversity comparisons limited by survey design Inputs and approvalObserved distinct species [species]; Survey effort [hours]; Survey protocol and version; Survey season and taxonomic scope; All planned survey visits completed Result: Observed richness; Recorded effort (species; hours) DOMAIN-1 / biodiversity: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Observed richness is not population size or occupancy. Comparable effort alone does not remove detection bias or establish a biodiversity trend. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BIODIVERSITYImplementation: prototype Method source: DD-GBIF |
| DEC-DP40-004DP40 | Expert review Prioritize scientific estimates awaiting independent assessment Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-005DP40 | Research questions Select questions aligned with institutional evidence gaps Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-006DP40 | Ethics and permissions Check research approvals before collecting restricted evidence Inputs and approvalProtocol; Protocol evidence reference; participants; participants evidence reference; consent; consent evidence reference; permits; permits evidence reference; ethics review; ethics review evidence reference; location; location evidence reference; conditions; conditions evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-007DP40 | Sampling design Compare designs for adequate precision and representation Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-008DP40 | Model validation Require independent evidence before applying predictive models Inputs and approvalEarlier/source value [kg/ha]; Independently reproduced value [kg/ha]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [kg/ha]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (kg/ha; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-009DP40 | Data cleaning Resolve contradictory measurements without altering originals Inputs and approvalOriginal source measurement [t C/ha]; Independent comparison measurement [t C/ha]; Original measurement unit; Comparison measurement unit; Compared measure and definition Result: Difference; Relative change (t C/ha; %) DOMAIN-1 / numeric-mismatch: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Keep both originals, units, scope, method, calibration and correction history. A difference does not identify which source is correct; no automatic averaging or overwrite. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MISMATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-010DP40 | Reproducibility Reproduce reported results from exact evidence versions Inputs and approvalEarlier/source value [t C/ha]; Independently reproduced value [t C/ha]; Original measurement unit; Comparison measurement unit; Compared measure and definition; Documented absolute comparison tolerance [t C/ha]; Expected input/method version; Reproduced input/method version; Original result creator; Independent reproducer Result: Difference; Relative change (t C/ha; %) DOMAIN-1 / reproduce: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPRODUCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-011DP40 | Research collaboration Match institutional research needs with qualified expertise Inputs and approvalDocumented skills/expertise; Task requirement; Available qualified effort [hours]; Required effort [hours]; Conflicts, clearance and mandate; Availability begins; Availability ends; Task window begins; Task window ends Result: Available minus required hours (hours) DOMAIN-1 / human-match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-012DP40 | Causal interpretation Determine whether evidence supports causal claims Inputs and approvalStudy design; Study design evidence reference; comparison; comparison evidence reference; baseline; baseline evidence reference; confounders; confounders evidence reference; attrition; attrition evidence reference; sensitivity; sensitivity evidence reference; assumptions; assumptions evidence reference Result: Study evidence gaps (items) DOMAIN-1 / study-design: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required IMPACTImplementation: prototype Method source: S92 |
| DEC-DP40-013DP40 | Uncertainty priorities Choose additional measurements that reduce material uncertainty Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-014DP40 | Research funding Compare study proposals under budget and evidence constraints Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-015DP40 | Data publication Review consent rights and sensitivity before releasing data Inputs and approvalDataset; Dataset evidence reference; license; license evidence reference; participant consent; participant consent evidence reference; species sensitivity; species sensitivity evidence reference; restrictions; restrictions evidence reference; approval; approval evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-016DP40 | Longitudinal studies Prevent loss of critical follow-up observations Inputs and approvalOriginal distinct cohort [participants]; Known continuing original members [participants]; Known withdrawals [participants]; Unknown follow-up [participants]; Later entrants outside original cohort [participants] Result: Confirmed continuation lower bound; Continuation upper bound; Unknown follow-up (%; %; participants) DOMAIN-1 / followup-retention: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVIVALImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-017DP40 | Laboratory quality Verify analytical controls supporting research measurements Inputs and approvalSample custody; Sample custody evidence reference; standards; standards evidence reference; blanks; blanks evidence reference; duplicates; duplicates evidence reference; calibration; calibration evidence reference; method; method evidence reference; accreditation; accreditation evidence reference Result: Evidence gaps (items) DOMAIN-1 / inspect: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required INSPECTImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-018DP40 | Knowledge transfer Prepare evidence packages for specific institutional decisions Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP40-019DP40 | Research outcomes Evaluate use and effects of research outputs Inputs and approvalTreatment Verified research recommendation uptake before [%]; Treatment Verified research recommendation uptake after [%]; Comparison Verified research recommendation uptake before [%]; Comparison Verified research recommendation uptake after [%]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (%) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP40-020DP40 | Scientific vocabulary Resolve inconsistent scientific variables and taxonomic labels Inputs and approvalOriginal variable; Original variable evidence reference; definition; definition evidence reference; unit; unit evidence reference; taxon reference; taxon reference evidence reference; edition; edition evidence reference; reviewed mapping; reviewed mapping evidence reference Result: Evidence gaps (items) DOMAIN-1 / classify: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Principal investigator, statistician and ethics/data-access reviewer. Authorized decision-maker for Universities and Researchers; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CLASSIFYImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-001DP41 | Livelihood reach Target communities missing intended livelihood support Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-002DP41 | Community feedback Prioritize unresolved feedback and complaints Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-003DP41 | Training follow-up Verify practical outcomes after community training Inputs and approvalUnique original cohort entrants [cases]; Entrants reviewed [cases]; Entrants with verified completion [cases]; Entrants with unknown follow-up [cases] Result: Verified completion share; Not verified complete (%; cases) DOMAIN-1 / flow: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Attendance, receipt, adoption, delivered service and outcomes are distinct stages. Repeated visits must not become new people. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required FLOWImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-004DP41 | Service delays Escalate locations with prolonged community-service delays Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / queue: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required QUEUEImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-005DP41 | Needs assessment Compare community priorities using inclusive evidence Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-006DP41 | Participation Resolve barriers to meaningful community participation Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-007DP41 | Beneficiary selection Prepare complete evidence for authorized programme selection Inputs and approvalProgramme criteria; Programme criteria evidence reference; household consent; household consent evidence reference; needs evidence; needs evidence evidence reference; prior support; prior support evidence reference; appeals; appeals evidence reference Result: Evidence gaps (items) DOMAIN-1 / eligibility: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ELIGIBILITYImplementation: prototype Method source: Project proposed rule Retained context sourcesLOCAL-SRS12, LOCAL-SRS21, S13, S47, S56 Context alone does not validate the formula. |
| DEC-DP41-008DP41 | Support overlap Coordinate complementary assistance and review potential duplication Inputs and approvalPermitted recipient/service reference; Support purpose; Earlier support period begins; Earlier support period ends; Other support period begins; Other support period ends; Same purpose and qualifying unit Result: Overlapping days (days) DOMAIN-1 / repeat: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required REPEATImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-009DP41 | Safeguarding referrals Route sensitive concerns through authorized confidential channels Inputs and approvalConfidential case; Confidential case evidence reference; consent; consent evidence reference; urgency; urgency evidence reference; designated receiver; designated receiver evidence reference; referral; referral evidence reference; follow-up; follow-up evidence reference Result: Evidence gaps (items) DOMAIN-1 / access: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required ACCESSImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-010DP41 | Climate adaptation Compare community-led adaptation alternatives Inputs and approvalOption cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects Result: Budget remaining after option (LKR) DOMAIN-1 / options: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required OPTIONSImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-011DP41 | Community assets Prioritize repairs to shared livelihood and water assets Inputs and approvalReceived or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed Result: Open days past due; Calendar age (days; days) DOMAIN-1 / maintenance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MAINTENANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-012DP41 | Volunteer deployment Match volunteer capacity to approved community tasks Inputs and approvalDocumented skills/expertise; Task requirement; Available qualified effort [hours]; Required effort [hours]; Conflicts, clearance and mandate; Availability begins; Availability ends; Task window begins; Task window ends Result: Available minus required hours (hours) DOMAIN-1 / human-match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-013DP41 | Programme finance Reconcile community grants and verified expenditure Inputs and approvalOpening cash/receivable balance [LKR]; Receipts and documented additions [LKR]; Payments and documented reductions [LKR]; Other documented non-overlapping adjustments [LKR]; Independently recorded closing balance [LKR] Result: Calculated closing balance; Recorded minus calculated closing (LKR; LKR) DOMAIN-1 / cash-balance: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Use the same physical boundary, period and units. A residual is a reconciliation issue, not automatically a measured loss. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required BALANCEImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-014DP41 | Market access Identify feasible market links for community enterprises Inputs and approvalOffered product and grade; Required product and grade; Available uncommitted quantity [kg]; Required quantity [kg]; Supply available from; Supply available until; Delivery window begins; Delivery window ends; Required quality, rights and conditions Result: Supply minus demand (kg) DOMAIN-1 / match: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits A candidate match does not reserve stock, appoint a person, authorize waste reuse or form a contract. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required MATCHImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-015DP41 | Water and sanitation Target communities lacking reliable safe service access Inputs and approvalRequired eligible frame [households]; Distinct members of that frame covered [households]; Frame members with unknown coverage [households] Result: Verified coverage; Known uncovered; Unknown coverage (%; households; households) DOMAIN-1 / coverage: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required COVERAGEImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-016DP41 | Disaster preparedness Address gaps in local warning and evacuation arrangements Inputs and approvalOfficial hazard information; Official hazard information evidence reference; warning access; warning access evidence reference; safe routes; safe routes evidence reference; vulnerable needs; vulnerable needs evidence reference; capacity; capacity evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient Result: Evidence gaps (items) DOMAIN-1 / risk: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required RISKImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-017DP41 | Programme retention Follow up participants lost from continuing support programmes Inputs and approvalOriginal distinct cohort [participants]; Known continuing original members [participants]; Known withdrawals [participants]; Unknown follow-up [participants]; Later entrants outside original cohort [participants] Result: Confirmed continuation lower bound; Continuation upper bound; Unknown follow-up (%; %; participants) DOMAIN-1 / followup-retention: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required SURVIVALImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-018DP41 | Outcome evaluation Evaluate whether programmes produced sustained community benefits Inputs and approvalTreatment Consistently measured livelihood outcome before [LKR/household]; Treatment Consistently measured livelihood outcome after [LKR/household]; Comparison Consistently measured livelihood outcome before [LKR/household]; Comparison Consistently measured livelihood outcome after [LKR/household]; Study design and comparability evidence; Outcome definition, method and reference basis Result: Difference in changes (LKR/household) DOMAIN-1 / impact: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Published core method; local use pending E01. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Verified published formula · Difference-in-differences arithmetic World Bank · Chapter 7, table 7.2, printed page 140, PDF page 170 Institution publication - World Bank IMPACTImplementation: prototype Method source: S92 |
| DEC-DP41-019DP41 | Partner coordination Resolve unclear ownership of cross-organization actions Inputs and approvalDistinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible Result: Response share; Unresolved issues (%; issues) DOMAIN-1 / consent: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required CONSENTImplementation: prototype Method source: Project proposed rule |
| DEC-DP41-020DP41 | Community evidence Improve completeness of consented community monitoring records Inputs and approvalRecord; Record evidence reference; source; source evidence reference; consent; consent evidence reference; location; location evidence reference; period; period evidence reference; units; units evidence reference; reviewer; reviewer evidence reference; revision; revision evidence reference Result: Evidence gaps (items) DOMAIN-1 / metadata: typed inputs, selected scope and period, evidence checks, coherent examples, proposed action and scoped exports. Limits Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity. Missing required inputs block results; missing is not zero. Keep exact source, boundary, definition and method versions. Scope and owner pending C01/C02. Review shared project rules and local use under E01 where needed. E02/E03 apply where relevant. Use Institution review. Community programme lead, participant representatives and safeguarding reviewer. Authorized decision-maker for Community-Based Organizations and NGOs; specific delegation and limits must be confirmed. | Candidate; institutional release acceptance pending Validation required Validation required METADATAImplementation: prototype Method source: Project proposed rule |
Retained method references
All 139 method IDs are retained. Version 1.6 aligns NF001 and NF002 with the fictional rice-plot example and distinguishes grouped mock inputs from future plot-identity validation. Published core methods need no repeat proof. Confirm local settings and intended use; a reference does not prove implementation.
139 method references
| Method | Formula or procedure | Sources and pending review |
|---|---|---|
| NF001 Rice plots by seed category | COUNT(DISTINCT eligible_plot_id) GROUP BY primary_rice_seed_category, period, area Inputs Operational procedure: eligible rice plot identity, one primary rice seed category, period, area and exclusion status. Mock: supplied fictional grouped plot counts. Unit plots Limits The operational procedure counts each eligible plot once. The mock uses fictional pre-grouped disjoint counts for categories A to F; it does not demonstrate underlying plot-identity deduplication. Unknown, missing or multiple categories are excluded with a declared exclusion status. Do not infer hectare coverage or population adoption from plot counts. | Validation required Project-proposed operational count and supplied grouped-count demonstration. The cited agriculture tables provide context, not direct validation of this plot-count example. Local category definitions, coverage and scientific use remain pending E01 and source custodian review. Project definition: retained catalogue NF001 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF002 Rice seed category share | 100 × eligible_plots_in_category / total_eligible_classified_plots Inputs Compatible eligible plot counts by one primary rice seed category; same period and area; explicit exclusions Unit % Limits Denominator is the sum of eligible mutually exclusive category counts. Missing, unknown or multiple-category observations are excluded and reported, never treated as zero. Zero eligible total has no defined share; show unavailable and no composition chart. | Validation required Project demonstration share. The cited agriculture tables provide context, not direct validation of this plot-count denominator. Local fitness and source rights remain pending E01 and source custodian review. Project definition: retained catalogue NF002 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF003 Paddy area under major irrigation | SUM(sown_area where irrigation_type=major) / SUM(sown_area) × 100 Inputs Sown area; irrigation type; season Unit % Limits Do not confuse major irrigation with agrarian minor tanks | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF003 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF004 Paddy area under minor irrigation | SUM(sown_area where irrigation_type=minor) / SUM(sown_area) × 100 Inputs Sown area; irrigation type; season Unit % Limits Source category definitions and incomplete records matter | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF004 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF005 Rainfed paddy cultivation share | 100 × rainfed_sown_area / all_classified_sown_area Inputs Paddy sown area; irrigation class Unit % Limits Classification must separate rainfed/major/minor as documented | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF005 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF006 Sowing-method adoption share | 100 × sown_area_using_method / eligible_sown_area Inputs Sown area by sowing method; season Unit % Limits Not equivalent to demonstrated yields or farmer adoption identities | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF006 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF009 Paddy cultivation intensity | Total seasonal planted/cultivated area across reference year / physical suitable cultivated land area Inputs Annual multiple-season cultivation areas; physical area Unit times/year Limits Denominator must be a nonduplicated physical area; double-cropping is intentional in numerator | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF009 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: YIELD |
| NF012 Crop forecast error, absolute | ABS(predicted_production - later_estimated_production) Inputs Dated forecast; matched later reference estimate Unit tonnes Limits Do not compare with another vintage/revision or different crop | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF012 Recorded context sourceRead the source note for NF-SOURCE-01. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. |
| NF014 Cultivation variable cost per hectare | SUM(variable_cost_lkr) / cultivated_area_ha Inputs Enterprise/season input costs; relevant area Unit LKR/ha Limits Cost definition and source period explicit | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF014 Recorded context sourceRead the source note for NF-SOURCE-02. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COST |
| NF015 Total production cost per kilogram | SUM(eligible_production_cost) / saleable_output_kg Inputs Labour, machinery, input and other defined costs; output Unit LKR/kg Limits Total vs variable cost must be distinguished; nonzero output | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF015 Recorded context sourceRead the source note for NF-SOURCE-02. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COST |
| NF016 Input cost contribution by category | 100 × cost_category / SUM(all_recorded_cost_categories) Inputs Cost records by type Unit % Limits Avoid double counting nested categories | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF016 Recorded context sourceRead the source note for NF-SOURCE-02. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF020 Cultivation delay relative to calendar | Actual sowing date - published intended sowing date Inputs Crop calendar; field sow date Unit days Limits A published calendar is guidance not a mandatory deadline | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF020 Recorded context sourceRead the source note for NF-SOURCE-02. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF021 Post-harvest loss percentage | 100 × recorded_lost_quantity / (saleable_quantity + lost_quantity) Inputs Harvest-batch weights; losses; disposition Unit % Limits Denominator represents same batch and measurement method | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF021 Recorded context sourceRead the source note for NF-SOURCE-02. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: LOSS |
| NF022 Gross margin ratio | 100 × gross_margin / calculated_revenue Inputs Gross margin and revenue from compatible enterprise/season Unit % Limits Revenue must be positive, distinguish gross from net | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF022 Recorded context sourceRead the source note for NF-SOURCE-02. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: MARGIN |
| NF023 RUSLE annual sheet/rill soil loss | A = R × K × LS × C × P Inputs Rainfall erosivity; soil erodibility; slope length/steepness; cover; practices Unit t/ha/year Limits Empirical factors must be calibrated; does not quantify gullies or sediment delivered to a river | Institution publication - Food and Agriculture Organization of the United Nations (FAO) The FAO toolbox publishes the RUSLE factor equation and credits USDA. This is not proof of local factor calibration or a complete RUSLE2 implementation. Published method: NF-SOURCE-03 Project definition: retained catalogue NF023 Recorded context sourceFAO equation checked; units, local factors and calibration remain pending E01/E02. Published core needs no repeat proof. Confirm local inputs, units and settings under E01; E02/E03 where relevant. See Section 6. Candidate family: EROSION |
| NF024 Conservation-practice soil-loss comparison | A_baseline - A_intervention; use documented RUSLE scenarios Inputs Baseline & scenario factor sets R,K,LS,C,P Unit t/ha/year difference Limits Predicted reduction only, not observed actual benefit | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF024 Recorded context sourceRead the source note for NF-SOURCE-03. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: EROSION |
| NF025 Area affected by modeled erosion class | SUM(valid_cell_area classified into reviewed erosion class) Inputs RUSLE output grid; approved class breaks Unit ha Limits Do not invent risk classes or mix grid sizes | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF025 Recorded context sourceRead the source note for NF-SOURCE-03. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: EROSION |
| NF026 Land-use class area share | 100 × area_of_class / total_valid_classified_area Inputs Land-use geometry, category, selected extent Unit % Limits Avoid overlap double count; classification scheme versions matter | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF026 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-04 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF027 Land-use conversion rate | (class_area_end - class_area_start) / years Inputs Aligned thematic layers, study interval Unit ha/year Limits End-start net is not gross conversion; keep transition matrix | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF027 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-04 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CHANGE |
| NF028 Area of prohibited/conditional overlapping use | Area(land_use_geometry ∩ valid_constraint_geometry) Inputs Permitted land-use and constraints layers Unit ha Limits Overlap supports screening, not a legal determination | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF028 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-04 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: OVERLAY |
| NF029 Available assessed site area | Total candidate area - spatially unioned excluded area Inputs Candidate polygon; approved exclusions Unit ha Limits Spatial union avoids counting overlapping exclusions twice | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF029 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-04 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF030 Existing land-use-plan geographic coverage | 100 × area_with_valid_plan / eligible_planning_area Inputs Plan geometry/version; planning boundary Unit % Limits Plan existence does not mean accepted intervention | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF030 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-04 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF031 Land-parcel slope group share | 100 × parcel_area_in_slope_class / total_valid_parcel_area Inputs Slope raster; parcel; class definition Unit % Limits DEM accuracy and slope class thresholds must be disclosed | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF031 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-04 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF032 Geographic source classification disagreement | 100 × area where two classified maps disagree / comparable valid area Inputs Aligned land cover / land use rasters Unit % Limits Difference includes classification method; not necessarily actual change | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF032 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-04 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: MISMATCH |
| NF034 SOC stock in soil layer | SOC concentration × soil bulk density × soil depth × (1 - coarse_fragment_fraction) × unit conversion Inputs Lab SOC; bulk density; sample depth; coarse fragment fraction Unit t C/ha Limits Same depth and compatible lab method; not derived from soil colour | Institution publication - Intergovernmental Panel on Climate Change (IPCC) IPCC describes this soil-stock product on printed page 2.37. Confirm units and the mass basis of coarse fragments. Published method: S79 Project definition: retained catalogue NF034 Recorded context sourceUNCCD context checked; IPCC source S79 supplies soil-stock method detail. E01/E02 approval pending. Published core needs no repeat proof. Confirm local inputs, units and settings under E01; E02/E03 where relevant. See Section 6. Candidate family: SOILCARBON |
| NF035 Soil organic carbon stock change | SOC_stock_end - SOC_stock_start Inputs Comparable stock profiles with aligned depths Unit t C/ha Limits Sampling uncertainties and depth basis preserved | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF035 Recorded context sourceUNCCD context checked; IPCC source S79 supplies soil-stock method detail. E01/E02 approval pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CHANGE, SOILCARBON |
| NF037 Paddy irrigation depth requirement | IN = ETcrop + SAT + PERC + WL - Pe Inputs ETo,Kc,pre-saturation,percolation/seepage,water-layer,effective rainfall Unit mm/season Limits Estimate with crop-stage, soil and management data; do not clamp negative without review | Institution publication - Food and Agriculture Organization of the United Nations (FAO) FAO section 4.4 publishes the paddy irrigation-depth equation. All terms must refer to the same period. Published method: S78 Project definition: retained catalogue NF037 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Published core needs no repeat proof. Confirm local inputs, units and settings under E01; E02/E03 where relevant. See Section 6. Candidate family: WATER |
| NF038 Paddy irrigation volume demand | IN_mm / 1000 × irrigated_area_m2 Inputs Reviewed net irrigation depth; actual area Unit m³ Limits Gross canal demand also needs conveyance/application losses | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF038 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: WATER |
| NF040 Reported canal delivery efficiency | 100 × delivered_volume / released_volume Inputs Measured compatible released and delivered volumes Unit % Limits Meter accuracy, storages and return flows; not national efficiency automatically | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF040 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: YIELD |
| NF041 Water delivery service completeness | 100 × successful scheduled deliveries / applicable scheduled deliveries Inputs Water allocation schedule and execution records Unit % Limits Missed schedule is not proof of illegal allocation | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF041 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF043 Days since last telemetry receipt | Current time - latest received timestamp Inputs Gauge incoming messages; expected interval Unit hours Limits Freshness rule depends on source interval | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF043 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FRESH |
| NF044 Reservoir storage change per period | Stored_volume_end - stored_volume_start with matched capacity curve Inputs Reservoir dated storage estimates Unit m³ Limits Source revisions and spill context matter | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF044 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. |
| NF045 Reservoir operation discharge balance | Observed inflow - recorded outflow (same period) Inputs Inflow, releases, spills, diversions Unit m³/period Limits Not full water balance unless evaporation and all losses included | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF045 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: BALANCE |
| NF046 Recorded demand coverage share | 100 × demand with valid crop/area/period inputs / submitted total demand Inputs Demand source rows and validation states Unit % Limits Measures data readiness, not adequate water supply | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF046 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF049 Water service connection coverage | 100 × active_service_connections / eligible_connections_or_households Inputs Registered connections, denominator source Unit % Limits Connections are not people or households unless one-to-one justified | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF049 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF050 Unbilled authorized consumption share | 100 × unbilled_authorized_volume / system_input_volume Inputs System input, unbilled authorized recorded volumes Unit % Limits Separate from real/apparent loss under IWA audit | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF050 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: NRW |
| NF051 Apparent loss share | 100 × estimated_apparent_loss / system_input_volume Inputs Meter inaccuracies, unauthorized consumption, data errors Unit % Limits Needs audited water balance, not assumed residual | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF051 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: NRW |
| NF052 Real leakage loss per connection day | Current annual real loss / (number of active connections × days) Inputs Audited real loss, connections, days Unit L/connection/day Limits Unit convert m³ to L; requires validated leakage loss | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF052 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: NRW |
| NF053 Infrastructure leakage index | Current annual real losses / unavoidable annual real losses Inputs Audited leakage loss; approved unavoidable loss model Unit ratio Limits Only if pressure, connection length and approved method support denominator | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF053 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: NRW |
| NF055 Groundwater-level drawdown | Reference groundwater head - later groundwater head Inputs Same well measured depth/head tied to datum Unit m Limits Depth to water versus groundwater elevation sign convention required | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF055 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF056 Groundwater seasonal fluctuation | MAX(groundwater elevation) - MIN(groundwater elevation) Inputs Well observations within matched seasonal window Unit m Limits Need comparable sensor datum and minimum valid observations | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF056 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: TREND |
| NF057 Regulatory water-quality compliant samples | 100 × valid samples meeting applicable rules / assessed valid samples Inputs Lab results, chemical property, legal target and sample conditions Unit % Limits Not universal water quality index; parameters and intended use matter | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF057 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUALITY |
| NF058 Water-quality monitoring coverage | 100 × locations with required valid testing / designated monitored locations Inputs Monitoring plan and valid laboratory samples Unit % Limits Availability is not water quality | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF058 Recorded context sourceRead the source note for NF-SOURCE-06. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF059 Forest proportion of assessed land | 100 × forest_area_ha / compatible_land_area_ha Inputs Forest-cover class, land area, boundary edition Unit % Limits Forest and tree-cover definitions must not be mixed | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF059 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF060 Mean forest tree density | Count of sampled live trees / plot_sampled_area_ha Inputs Forest inventory plots, tree counts, sampled plot area Unit trees/ha Limits Declared diameter inclusion limits and survey design | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF060 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CARBON |
| NF061 Forest basal area per hectare | SUM(π × DBH_m² / 4) / sampled_area_ha Inputs Tree DBH for included inventory trees Unit m²/ha Limits DBH units and species inclusion rules; plot expansion | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF061 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CARBON |
| NF063 Forest biomass density | SUM(model-estimated biomass) / relevant forest area Inputs Accepted allometric biomass, species, tree size Unit t dry matter/ha Limits Mandatory approved species-specific model and uncertainty | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF063 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CARBON |
| NF065 Carbon dioxide equivalent of changed carbon stock | CO2 equivalent = carbon-stock change × 44/12 Inputs Measured/modelled carbon change, defined pools Unit t CO2e Limits Pool accounting, uncertainty, emissions/removals separated | Validation required The linked forest context does not establish this complete conversion rule. IPCC section 2.2.3 distinguishes the 44/12 molecular ratio from the negative sign used for emissions; the sign and reporting purpose require validation. Project definition: retained catalogue NF065 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CARBON |
| NF066 Forest edge length per area | Length of forest/nonforest boundaries / forest area Inputs Classified forest polygons and shared edge rule Unit m/ha Limits Sensitive to map resolution and classification noise | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF066 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF068 Forest cover gross losses by transition | Area of forest-to-nonforest pixels over comparable classification period Inputs Aligned forest classes at start/end Unit ha Limits Not every loss is irreversible deforestation | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF068 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CHANGE |
| NF069 Restoration planting density | Number planted / mapped eligible planting area Inputs Planted tree records, planting site area Unit trees/ha Limits Planting density is not survival or verified restoration | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF069 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF070 Restoration observed survival by cohort | 100 × surviving verified trees / planting cohort count Inputs Seedling cohort, revisit observations Unit % Limits Survival must match cohort and period, not unrelated trees | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF070 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: SURVIVAL |
| NF071 Forest change alert review completion | 100 × reviewed detection alerts / eligible received alerts Inputs Remote-sensing alerts and review records Unit % Limits Alert is not a confirmed incident | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF071 Recorded context sourceRead the source note for NF-SOURCE-07. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: INSPECT |
| NF072 Observed species richness | COUNT(DISTINCT taxon_id) within comparable verified survey samples Inputs Survey-event species identifications and protocols Unit species Limits Observed richness, not total species richness or population | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF072 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: BIODIVERSITY |
| NF076 Survey protocol coverage | 100 × surveyed target cells / eligible planned survey cells Inputs Survey sampling grid and completed events Unit % Limits Sampling frame and valid effort required | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF076 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF077 Shannon diversity index (survey-based) | H = -SUM(p_i × LN(p_i)) across recorded species sample proportions Inputs Comparable abundance observations by taxon Unit dimensionless Limits Requires abundance sampling, not presence-only opportunistic sightings | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF077 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: BIODIVERSITY |
| NF079 Threatened taxon observation summary | COUNT(DISTINCT verified_taxa with source-category CR/EN/VU) Inputs Species observations linked to current licensed IUCN categories Unit taxa observed Limits Not a formal threat index and coverage may be incomplete | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF079 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: BIODIVERSITY |
| NF080 Conservation habitat survey response time | Observed incident report time to documented first follow-up Inputs Human-wildlife incident and response cases Unit hours/days Limits Requires accurate timestamps; does not measure mitigation success | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF080 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF081 Protected habitat intersection share | Area(habitat ∩ protected_boundary) / area(habitat) × 100 Inputs Habitat spatial polygons, protected-area boundary editions Unit % Limits Geometries, data rights, sensitive locations | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF081 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: OVERLAY |
| NF082 Biodiversity threat exposure STAR | Apply licensed IUCN STAR tool methodology to input threatened taxon habitat and threat data Inputs IUCN distribution, species risk/threat layers, land use Unit STAR units per IUCN method Limits Not generic Shannon index; official model and expert approval required | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF082 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: STAR |
| NF083 Habitat condition change | End validated condition indicator - baseline condition indicator Inputs Comparable indicator values, scale and surveys Unit indicator units Limits Method approved, condition not a one-size-fits-all score | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF083 Recorded context sourceRead the source note for NF-SOURCE-08. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CHANGE |
| NF085 Rainfall anomaly difference | Observed_period_rainfall - matching_climate_normal Inputs Observed accumulated rain, baseline normal Unit mm Limits Baseline normals and missing data completeness stated | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF085 Recorded context sourceRead the source note for NF-SOURCE-09. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: ANOMALY |
| NF086 Rainfall coefficient of variation | 100 × sample_sd(annual_total_rainfall) / mean(annual_total_rainfall) Inputs Complete annual rainfall totals over stated years Unit % Limits Mean positive; sufficiently many complete years | Government publication - United States National Institute of Standards and Technology (NIST) NIST defines sample CV. This reference expresses the ratio as a percentage; rainfall data and aggregation require approval. Published method: S84 Project definition: retained catalogue NF086 Recorded context sourceRead the source note for NF-SOURCE-09. This link check does not approve the method. Published core needs no repeat proof. Confirm local inputs, units and settings under E01; E02/E03 where relevant. See Section 6. Candidate family: ANOMALY |
| NF088 Maximum consecutive dry days | MAX(run length of daily precipitation below approved dry-day cutoff) Inputs Complete daily precipitation series Unit days Limits Gap breaks run unless imputed under reviewed method | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF088 Recorded context sourceRead the source note for NF-SOURCE-09. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: SPELL |
| NF089 Maximum consecutive wet days | MAX(run length of days meeting approved rain cutoff) Inputs Daily station rainfall and wet-day definition Unit days Limits Document threshold and observation completeness | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF089 Recorded context sourceRead the source note for NF-SOURCE-09. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: SPELL |
| NF093 Meteorological observation timeliness | 100 × valid observations received by expected deadline / expected observations Inputs Station schedule and received timestamps Unit % Limits Does not prove measurement accuracy | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF093 Recorded context sourceRead the source note for NF-SOURCE-09. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FRESH |
| NF094 Station/source period coverage | 100 × periods with quality-accepted data / expected periods Inputs Expected schedule and valid observation inventory Unit % Limits Coverage should accompany plotted anomalies | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF094 Recorded context sourceRead the source note for NF-SOURCE-09. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FRESH |
| NF095 SPI using fitted probability distribution | Follow WMO recommended precipitation aggregation, fitted distribution and standard normal transform Inputs Long rainfall time series, selected SPI timescale Unit SPI z-score Limits Not simple anomaly / SD; minimum time-series and QA requirements | Institution publication - World Meteorological Organization (WMO) WMO section 6 describes fitting and normal transformation. This retained method is not implemented by the SPI input-only screen. Published method: S82 Project definition: retained catalogue NF095 Recorded context sourceNormals page checked; use WMO SPI guide S82 for the specialist method. E01 approval pending. Published core needs no repeat proof. Confirm local inputs, units and settings under E01; E02/E03 where relevant. See Section 6. Candidate family: SPI |
| NF097 Disaster affected family share | 100 × affected_households / total_households_at_same_area Inputs Official affected families; relevant household denominator Unit % Limits Count families only once within incident; not total people | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF097 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF099 Disaster direct loss to GDP | 100 × verified_direct_economic_loss / relevant_GDP Inputs PDNA damages and matched GDP Unit % Limits Separate damage vs output loss, price year and coverage | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF099 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF100 Sectoral damage composition | 100 × approved_sector_damage / all_included_sector_damage Inputs PDNA amounts by category/currency Unit % Limits Avoid overlap between public/private and sectors | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF100 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF101 Disaster recovery funding gap | Estimated approved recovery need - committed eligible financing Inputs PDNA recovery plan needs, confirmed commitments Unit LKR Limits Needs not identical to monetary damage; avoid double counting | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF101 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FUNDING |
| NF102 Safe-center occupancy | Present displaced persons / documented safe-center capacity × 100 Inputs Shelter occupants, certified facility capacity Unit % Limits Capacity requires approved site records; exceeding 100 possible as overload | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF102 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CAPACITY |
| NF104 Hazard overlap of candidate sites | Area(candidate_site ∩ valid_hazard_class) by class Inputs Published NBRO/DMC zonation; project polygons Unit ha Limits Spatial intersection not an operational permit/recommendation | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF104 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: OVERLAY |
| NF105 Disaster observation update lag | Latest verified situation time - actual field observation time Inputs Field report source time and publication timestamp Unit hours Limits Lag can be source reporting not current incident | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF105 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FRESH |
| NF106 Landslide model suitability/readiness | Documented zonation geometry and edition; no replacement formula Inputs NBRO hazard layer, scale, valid plan use Unit category/coverage Limits NBRO hazard model cannot be approximated by invented slope score | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF106 Recorded context sourceRead the source note for NF-SOURCE-10. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: RISK |
| NF107 Ambient parameter compliance share | 100 × accepted test observations meeting applicable target / all accepted tests assessed Inputs Sample value, unit, purpose-specific target and period Unit % Limits National threshold and test methods must be verified | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF107 Recorded context sourceParameter compliance is not the full water-body indicator SDG 6.3.2. Confirm the intended measure under E01. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUALITY |
| NF108 Monitoring sites with complete parameter groups | 100 × sites with all required current parameters / required monitored sites Inputs Network sites; valid oxygen/salinity/nutrients/acidity groups Unit % Limits Completion does not imply meeting quality criteria | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF108 Recorded context sourceRead the source note for NF-SOURCE-11. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF109 Median pollutant concentration | MEDIAN(valid lab results at compatible points/periods) Inputs Quality-tested environmental concentrations Unit mg/L Limits Lab detection limits/censored values need method | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF109 Recorded context sourceRead the source note for NF-SOURCE-11. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUALITY |
| NF110 Environment mitigation completion | 100 × independently closed mitigation actions / actions due Inputs Assessment conditions, actions, review records Unit % Limits Action closure not equal pollutant reduction | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF110 Recorded context sourceRead the source note for NF-SOURCE-11. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: INSPECT |
| NF111 Environmental monitoring spatial coverage | 100 × designated zones with sampled sites / planned zones Inputs Sites and monitoring plan polygons Unit % Limits Sparse points do not establish whole-zone water quality | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF111 Recorded context sourceRead the source note for NF-SOURCE-11. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF112 Environmental exceedance duration | SUM(duration of verified exceedance episodes under approved threshold rule) Inputs Time-series, quality control, threshold + hysteresis Unit hours Limits Sampling frequency and gaps require supported interpolation | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF112 Recorded context sourceRead the source note for NF-SOURCE-11. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUALITY |
| NF113 Price range width | Market quoted maximum - market quoted minimum Inputs Same date/place/grade min/max price Unit LKR/kg Limits Quotation range not mean/actual sale | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF113 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: DISTRIBUTION |
| NF114 Commodity price median by market | MEDIAN(quality-valid matching price quotations) Inputs Dated comparable unit/grade price quotes Unit LKR/kg Limits Quotations not independently recorded transactions | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF114 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: DISTRIBUTION, PRICE |
| NF115 Commodity weekly price volatility | 100 × sample_std(weekly_price_series) / mean(weekly_price_series) Inputs Matched weekly quoted prices across defined window Unit % Limits Needs >=2 valid periods and positive mean; not return volatility | Government publication - United States National Institute of Standards and Technology (NIST) NIST defines sample CV. This reference expresses the ratio as a percentage; the selected weekly price series requires validation. HARTI is a price-data source, not the source of this statistic. Published method: S84 Project definition: retained catalogue NF115 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Published core needs no repeat proof. Confirm local inputs, units and settings under E01; E02/E03 where relevant. See Section 6. Candidate family: VOLATILITY |
| NF116 Farm-gate to retail spread | Retail_quoted_price - farmgate_quoted_price at compatible grades/periods Inputs Farmgate and retail prices with matching product/grade Unit LKR/kg Limits Transport, margins and losses not implied by spread alone | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF116 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: PRICE |
| NF117 Postharvest batch retention | 100 × usable_output_kg / raw_input_kg Inputs Input mass, usable output, documented process Unit % Limits Moisture/processing losses may be intended; define basis | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF117 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: LOSS |
| NF118 Processor capacity utilization | 100 × actual_processed_quantity / theoretical_available_capacity Inputs Equipment capacity, operating period, output records Unit % Limits Theoretical capacity conditioned on uptime and shifts | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF118 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CAPACITY |
| NF119 Transport cost per tonne-kilometre | Transport_total_cost / (shipment_tonnes × route_km) Inputs Shipment quantity, verified route and cost Unit LKR/t-km Limits Need valid route distance and mode; no straight line substitution | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF119 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COST |
| NF120 Cold-chain temperature excursions | COUNT(valid interval episodes exceeding product-approved range) Inputs Logger temperature, goods specification, logger quality Unit events Limits Sampling interval, trigger hysteresis and allowed limit | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF120 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUALITY |
| NF121 Verified sell-through rate | 100 × actual_sold_quantity / available_marketable_quantity Inputs Confirmed sales and inventory/production availability Unit % Limits Buyer interest, enquiries not sales | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF121 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF122 Export unit value | Customs-reported export value / matched export quantity Inputs Customs value, volume, currency, product, country Unit USD/tonne Limits Changes in quality/product mix distort interpretation | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF122 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: YIELD |
| NF123 Export market concentration HHI | SUM((market_export_share)^2) for complete destination breakdown Inputs Product export value by destination, same year Unit HHI share squared Limits Subscription source coverage and missing markets matter | Validation required The HARTI price bulletin does not establish an export-concentration method. Government HHI guidance uses a different market and scale; this application requires validation. Project definition: retained catalogue NF123 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CONCENTRATION |
| NF124 Export destination share | 100 × value_to_destination / total_product_exports Inputs Export data with same product code and year Unit % Limits Official trade data may require subscription | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF124 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COMPOSITION |
| NF125 Export growth contribution | (current_value - prior_value) / (current_total_export_value - prior_total) × 100 Inputs Product-group export values in consistent currency Unit % Limits When total delta zero, no contribution percentage; can be negative | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF125 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF126 Price seasonality index | 100 × mean(price for calendar month over complete years) / grand_mean_price Inputs Consistent historic commodity monthly quotes Unit index, base 100 Limits Missing periods/market mix and inflation context | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF126 Recorded context sourceOfficial alternative checked. Read NF-SOURCE-12 for its scope; method and local application approval remain pending. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: VOLATILITY |
| NF127 Registered state-land permit backlog | COUNT(valid permit applications with open state beyond agreed review date) Inputs Application reference, submitted date, workflow state Unit applications Limits Overdue definition depends on official workflow, not invented SLA | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF127 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUEUE |
| NF128 Permit expiry exposure | COUNT(active recorded permits with end date within selected horizon) Inputs Permit register, documented expiry date Unit permits Limits A warning is not a legal determination of permit validity | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF128 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF129 State land record coverage | 100 × indexed parcels with valid reference / eligible source parcel list Inputs State land parcel records, digitization inventory Unit % Limits Not legal ownership completeness | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF129 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF130 Enterprise programme uptake | 100 × verified participating enterprises / invited eligible enterprises Inputs Programme participant and eligibility records Unit % Limits Enrollment alone does not prove success | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF130 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FLOW |
| NF131 Training to support transition | 100 × trainees completing defined follow-up / enrolled trainees Inputs Training and follow-up support records Unit % Limits Participant identity and training session distinction | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF131 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FLOW |
| NF132 Industrial estate occupied plot share | 100 × leased/occupied developed plots / plots available at start Inputs Industrial estate inventory, dated lease and status Unit % Limits Allocation/lease not proof of operational industry | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF132 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: CAPACITY |
| NF133 Enterprise support response time | Mean(closure_date - request_date) for valid completed service records Inputs Service requests and completion dates Unit days Limits Cases still open are separately reported, not discarded | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF133 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUEUE |
| NF134 Industrial facility infrastructure readiness | Count compliant required infrastructure elements / total required elements (approved checklist) Inputs Site infrastructure assessments and checklist Unit % Limits Locally approved readiness checklist; not automatic investment approval | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF134 Recorded context sourceOriginal linked source retained as context; exact formula and local suitability not certified Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: INSPECT |
| NF135 Population poverty headcount share | 100 × weighted_persons_below_official_poverty_line / valid_survey_population Inputs HIES consumption/income, line, sample weights Unit % Limits Official sample design; avoid GN-level inference from district estimate | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF135 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: DISTRIBUTION |
| NF136 Mean household expenditure per person | Survey-weighted household expenditure per capita Inputs HIES household expenditure, size and sample weights Unit LKR/person/month Limits Use official deflation/reference prices for comparisons | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF136 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: DISTRIBUTION |
| NF138 Community outreach coverage | 100 × distinct verified reached target persons / eligible target population Inputs Outreach event attendance and authorized frame Unit % Limits Cannot use census persons as count of project beneficiaries | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF138 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF139 Service request first response time | Time of first actual official response - submission received time Inputs Case records and timestamps Unit hours/days Limits Acknowledgement may be different from substantive response | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF139 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUEUE |
| NF140 Resolved feedback ratio | 100 × independently closed feedback cases / valid cases received in same cohort Inputs Feedback case registers, dispositions, cohorts Unit % Limits Public anonymous intake requires approved policy | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF140 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF141 Training completion share | 100 × unique completers / unique eligible enrolled participants Inputs Training session and participant records Unit % Limits Completion definition and duplicate IDs reviewed | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF141 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FLOW |
| NF142 Programme support intensity | Total verified delivered support quantity / distinct verified recipients Inputs Support episodes, quantities and participant IDs Unit unit/person Limits Do not merge heterogeneous support units | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF142 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: No equivalence asserted |
| NF143 Repeated-support overlap share | 100 × distinct recipients in >1 support programme / distinct recipients across programmes Inputs Reviewed privacy-permitted beneficiary cross-programme links Unit % Limits Restricted identifiers; overlap is not ineligible or fraud | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF143 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: REPEAT |
| NF144 Community grievance ageing | Age as-of date of unresolved complaint or case Inputs Protected grievance/feedback case and status Unit days Limits Only activate formal grievance workflow if approved | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF144 Recorded context sourceRead the source note for NF-SOURCE-13. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUEUE |
| NF145 Project internal rate of return | Solve NPV(r) = 0 for well-defined dated net cashflow sequence Inputs Initial investment, annual costs/benefits, residual value Unit %/period Limits Multiple/no roots possible, monetary vs economic basis separate | Validation required The linked appraisal illustrates periodic IRR. The reference specifies dated cash flows; timing conventions and the applicable solver require validation. Project definition: retained catalogue NF145 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FINANCE |
| NF147 Discounted payback year | First period where cumulative discounted net cash flow becomes non-negative Inputs Approved cashflow schedule, discount rate Unit years Limits No payback if never recovers; fractional interpolation declared | Validation required The reference requires discounted payback. The linked appraisal and prototype helper use simple or undiscounted payback; they do not validate this method. Project definition: retained catalogue NF147 Recorded context sourceOriginal source describes simple payback, not discounted payback. Select and approve a separate discounted method under E01. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FINANCE |
| NF148 Debt service coverage ratio | Cash available for debt service / scheduled principal+interest due Inputs Cashflows, debt repayment schedule Unit ratio Limits Requires finance-institution definition; not automatic loan approval | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF148 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: DEBT |
| NF149 Co-financing commitment ratio | 100 × documented eligible co-finance commitments / approved co-finance target Inputs Signed funding commitments and target Unit % Limits Commitment is not disbursement | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF149 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FUNDING |
| NF151 Unfunded intervention amount | Approved planned intervention amount - confirmed eligible committed finance Inputs Reviewed intervention budget, grant commitments Unit LKR Limits Do not count planned or interested finance as commitment | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF151 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FUNDING |
| NF152 PES verification completion | 100 × agreements with verified required services / agreements due for verification Inputs PES agreements, evidence and verifier records Unit % Limits Compliance depends on scheme rules and independence | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF152 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: PES |
| NF153 PES quantified physical service flow | SUM(accepted service_units) for comparable service/method and period Inputs Approved ecosystem service physical flow observations Unit service-specific units Limits Different service types cannot be summed in one total | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF153 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: PES |
| NF154 Ecosystem service monetary flow | SUM(verified quantities × reviewed service-unit valuation) with permitted approach Inputs Service flows, approved accounting/valuation model Unit LKR/year Limits Monetary account is not a cash payment or PES entitlement | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF154 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: ACCOUNT |
| NF155 Outcome verification cost per unit | Total project monitoring/verification cost / accepted verified service units Inputs Eligible monitoring expenditure and verified service flow Unit LKR/service unit Limits Service category and period must agree | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF155 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. |
| NF156 PES agreement renewal exposure | COUNT(effective agreements ending during selected horizon) Inputs PES agreement valid-to date and status Unit agreements Limits Status may require official legal source confirmation | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF156 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: PES |
| NF157 Benefit-cost sensitivity range | Recompute BCR/NPV on separate documented discount/cost/benefit assumptions Inputs Approved appraisal, alternative parameter sets Unit LKR; ratio Limits Not an automatic preference ranking; retain scenario lineage | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF157 Recorded context sourceRead the source note for NF-SOURCE-14. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FINANCE |
| NF158 Milestone evidence acceptance share | 100 × verified-complete milestones / due milestones Inputs Milestone due dates, reviewed evidence and states Unit % Limits Submitted evidence is not completion | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF158 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FLOW |
| NF159 Intervention implementation rate | 100 × interventions reaching accepted implementation stage / approved planned interventions Inputs Portfolio intervention states and planned cohort Unit % Limits Stages reflect plan, field work, review separately | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF159 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: VARIANCE |
| NF160 Financial utilization against approved budget | 100 × posted eligible actual expenditure / latest approved budget Inputs Budget editions, eligible posted expenses Unit % Limits Commitments and disbursements distinguished | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF160 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. |
| NF164 Review backlog aged beyond target | COUNT(open review cases exceeding their assigned due date) Inputs Review queue, due dates and current statuses Unit cases Limits No universal SLA unless approved | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF164 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: QUEUE |
| NF165 Outcome indicator data coverage | 100 × required reporting units with valid observed results / applicable reporting units Inputs Indicator plan, report periods, valid observations Unit % Limits Targets do not count as observations | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF165 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF166 Source evidence acceptance ratio | 100 × accepted submissions / received submissions of cohort Inputs Submission versions and review states Unit % Limits Returned duplicates version counted by submitted unit | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF166 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FLOW |
| NF169 Portfolio intervention area coverage | Unique unioned mapped intervention hectares / defined eligible project landscape hectares × 100 Inputs Geometries linked to approved interventions, landscape Unit % Limits Spatial union avoids overlap double counting; area is not beneficiary count | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF169 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: COVERAGE |
| NF170 Review independence compliance | 100 × protected decisions with distinct authorized reviewer / protected decisions requiring independence Inputs Decision/audit actors and review policy Unit % Limits Privacy and role-scope rules; not a substitute for approvals | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF170 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: INSPECT |
| NF171 Target achievement ratio | 100 × compatible observed_result / applicable target Inputs Approved indicator target and verified actuals Unit % Limits If target zero or direction inverted, specify alternate method | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF171 Recorded context sourceRead the source note for NF-SOURCE-15. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: VARIANCE |
| NF173 Schema validation pass rate | 100 × records passing all required schema checks / received records Inputs Submission validation receipts, schema versions Unit % Limits Technical validity not scientific accuracy | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF173 Recorded context sourceRead the source note for NF-SOURCE-16. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: METADATA |
| NF174 Data timeliness share | 100 × expected reporting periods received within source-specific deadline / due periods Inputs Source update agreement and timestamps Unit % Limits No universal freshness target; out-of-order intake allowed | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF174 Recorded context sourceRead the source note for NF-SOURCE-16. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: FRESH |
| NF176 Record provenance completeness | 100 × observations with mandatory source/version/field/location-time support / eligible observations Inputs Lineage audit contract, record metadata Unit % Limits Location may be explicitly unknown per contract | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF176 Recorded context sourceRead the source note for NF-SOURCE-16. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: METADATA |
| NF177 Geospatial object matching review rate | 100 × reviewed candidate identity matches / generated eligible candidates Inputs Match suggestions and reviewer decisions Unit % Limits Similarity does not establish canonical identity | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF177 Recorded context sourceRead the source note for NF-SOURCE-16. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: MISMATCH |
| NF178 GIS layer actual data availability | 100 × published catalogue entries with valid retrievable layers / eligible required layers Inputs Catalogue service status, layer count Unit % Limits WMS service available does not guarantee bulk features | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF178 Recorded context sourceRead the source note for NF-SOURCE-16. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: METADATA |
| NF179 Expired data source access share | 100 × active saved analytic products with invalid source rights / products due for recheck Inputs Source grants, saved reports, current permissions Unit % Limits A private report should remain inaccessible, not leak metadata | Validation required The linked publication supplies context, observations or related guidance; direct support for this exact formula or procedure is not established. Project definition: retained catalogue NF179 Recorded context sourceRead the source note for NF-SOURCE-16. This link check does not approve the method. Local definitions and method changes: E01; E02/E03 where relevant. Developer checks arithmetic and input handling. See Section 6. Candidate family: ACCESS |
All sources
The 133 source entries retain their original citations and access limits. Government publication and Institution publication identify support for a stated core method. Project adaptations and incomplete support remain Validation required. Availability is not permission, scientific endorsement or acceptance.
The preferred LUPPD planning report and HARTI publication alternatives remain linked with their limits. The original local planning manual was not recovered. Access-unverified sources need an official copy or approved retry under the existing C04/E01 decisions.
Download the complete source register
S01 LUPPD Performance Report 2022: official planning context
Official departmental report hosted by Parliament; planning context
Section 1.3, PDF page 4: divisional, village and micro-watershed planning; stakeholder coordination
Official alternative checked
This official LUPPD report is a readable alternative for institutional planning context. It is not the missing divisional planning manual. The original manual was not recovered; confirm the applicable local procedure and source edition with LUPPD under C04/E02.
Open sourceS02 NRMC functions
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS03 Department of Agriculture publications and regulations
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS04 Agrarian Development services
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS05 Irrigation Department public information
Context or data source; not automatic formula support
Public homepage navigation: reservoir status, hydrology, geo-informatics and branch information
Content checked
The official page is available. It identifies public information routes; it does not establish a data licence, live API or calculation method.
Open sourceS06 Irrigation Department overview and functions
Context or data source; not automatic formula support
Overview: Objectives and Functions
Replacement checked
The old ministry URL has a certificate hostname problem. The department's own overview confirms water-resource planning, operation, maintenance and flood-protection functions. This replacement is institutional context.
Open sourceS07 Mahaweli Water Management Secretariat
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS08 Mahaweli land-use planning
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS09 Forest Conservation functions
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS10 Department of Meteorology products
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS11 Agro-climatology and climate change division
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS12 Export Agriculture research division
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS13 GCF FP124 project and documents
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS14 CIFOR-ICRAF dashboards
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS15 Survey Department responsibilities
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS16 Sri Lanka NSDI reference standards
Context requiring custodian confirmation
Reference standards page contains text about another jurisdiction; no local mandate inferred
Retrieved text for review
Open sourceS17 Sri Lanka NSDI publication and access FAQ
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS18 Disaster Management Centre profile
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS19 Landslide clearance assessment
Context or data source; not automatic formula support
Issuing Landslide Clearance for Building Constructions / Land Developments / Projects: objectives and site assessment
Content checked
The official text describes geological, geotechnical and hydrological site assessment. It is clearance context, not a numerical hazard score. Current applicability and authority remain for the competent institution to confirm.
Open sourceS20 Environmental Protection License scheme
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS21 Natural resources management and monitoring
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS22 Wildlife research permissions
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS23 Wilpattu management plan 2019–2024
Context or data source; not automatic formula support
Wilpattu National Park Management Plan 2019-2024: approval page and executive summary
Replacement checked
The DWC URL returns 404. The same titled plan is available from the collaborating GIZ SNRD archive. It is historical Wilpattu context, not a current Knuckles management plan.
Open sourceS24 Census and Statistics survey catalogue
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS25 Water Resources Board hydrogeology
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS26 Water Resources Board services
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS27 Water supply and sanitation project completion report
Context or data source; not automatic formula support
World Bank ICR00005929: contents, results framework and efficiency analysis
Content checked
The Water Supply and Sanitation Improvement Project report is available. It supports project and service-performance context. Its project-specific values are not SHARED parameters.
Open sourceS28 Geological Survey and Mines Bureau licensing information
Context or data source; not automatic formula support
Licensing: licence categories and application information
Replacement checked
The old /services path returns 404. The official licensing page is available. It supplies regulatory context; permit decisions and current conditions require the Bureau's confirmation.
Open sourceS29 State land administration services
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS30 State Land Information Management System
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS31 HARTI weekly commodity bulletins
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS32 HARTI annual report 2024
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS33 EDB export marketing services
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS34 EDB trade information
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS35 National Enterprise Development Authority
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS36 IDB technical services
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS37 IDB industrial estates
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS38 Home Affairs historical performance report: administration context
Context or data source; not automatic formula support
Historical report: PDF pages 5-6; district, divisional and Grama Niladhari administration sections listed in contents
Content checked
The report is available through verified HTTPS. It concerns historical administration and progress. Do not use its counts or arrangements as the current programme geography or current mandate.
Open sourceS39 Public Administration Circular 23/2021
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS40 Tea Research Institute agronomy
Context or data source; not automatic formula support
Agronomy division: research and development activities and key research areas
Content checked
The official page supports tea agronomy, productivity, labour and soil and water context. It does not prescribe the prototype's numerical rules.
Open sourceS41 TRI climate adaptation guideline 2019
Context or data source; not automatic formula support
TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies
Content checked
The two-page guideline is available. It gives tea climate-adaptation practices. Local option selection, effectiveness and measurement protocols still need expert approval.
Open sourceS42 Plantation Human Development Trust
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS43 CBSL sustainable finance
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS44 Sri Lanka Green Finance Taxonomy
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS45 GBIF guide for publishing biological survey and monitoring data
Context or data source; not automatic formula support
Guide v1.0.2: sections 5.4, 5.5 and 5.7 on time, protocol and sampling effort
Replacement checked
The original introduction was access-blocked. The official guide is readable and provides stronger sampling-event documentation. It does not establish a Shannon or STAR calculation.
Open sourceS46 GBIF biological survey publishing guide
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS47 IFRC community engagement and accountability
Context or data source; not automatic formula support
Community Engagement and Accountability: participation and trusted feedback mechanisms
Content checked
The official page supports participation and feedback principles. SHARED response deadlines, escalation and safeguarding rules remain client decisions.
Open sourceS48 USDA RUSLE2 overview
Context or data source; not automatic formula support
Water Erosion RUSLE2: overview and official program and database
Content checked
The page describes a rainfall and runoff erosion model. A simple product of factors is not the full RUSLE2 program. Local factors and valid uses need expert approval.
Open sourceS49 IPCC 2019 Refinement
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS50 FAO crop evapotranspiration 56
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS51 Cost of production budgeting
Context requiring follow up
Generic landing page; the intended budgeting guide is not established
Retrieved text for review
Open sourceS52 WMO SPI user guide record
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS53 UDA published zoning map
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS54 Seed Certification Service
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS55 Sri Lanka Agriculture Enterprise Architecture 1.3
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS56 WHO water safety planning
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS57 FAO food loss measurement
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS58 UN SEEA Ecosystem Accounting
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS59 OECD evaluation criteria
Context or data source; not automatic formula support
Understanding the six criteria: definitions and elements for analysis
Content checked
The OECD chapter is available and supplies evaluation criteria. It does not prescribe one SHARED score, weighting scheme or causal estimator.
Open sourceS60 FAO PES and food security
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS61 FAO designing PES
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS62 NRMC Soil Conservation Division
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS63 NRMC Land Use Planning and Geo-Informatics
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS64 Irrigation Department Dam Safety Branch
Context or data source; not automatic formula support
Dam Safety: Main Functions and Services
Content checked
The branch page confirms inspection, monitoring and coordination responsibilities. It does not supply a universal dam-safety risk score or operating threshold.
Open sourceS65 Irrigation Department Water Management Branch
Context or data source; not automatic formula support
Water Management: Objectives and Functions
Content checked
The branch page confirms coordination and irrigation water-management functions. Crop-water calculations use the separate FAO method sources and approved local inputs.
Open sourceS66 NSDI profile of Land Use Policy Planning Department
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS67 DCS Statistical Abstract 2024: agriculture methodology
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS68 FAO 56: Penman-Monteith reference evapotranspiration
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS69 FAO 56: crop evapotranspiration
Published method
FAO 56 Chapter 5 equation 56; ETc = Kc × ETo
Retrieved text for review
Open sourceS70 IPCC 2019 Refinement: AFOLU volume
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS71 IUCN Species Threat Abatement and Restoration metric
Published specialist method overview
Scientific underpinning and approach; full STAR calculation is not implemented
Retrieved text for review
Open sourceS72 IWA non-revenue water management
Published definition
Opening NRW definition; detailed water audit protocol not supplied
Retrieved text for review
Open sourceS73 CBSL Sri Lanka Green Finance Taxonomy 2022
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceS74 World Bank Impact Evaluation in Practice: difference-in-differences
Context or data source; not automatic formula support
Impact Evaluation in Practice, second edition, Chapter 7; printed pages 129-141, especially 132-135
Content checked
The chapter describes difference-in-differences and its comparison-trend assumptions. It does not validate a local causal claim from a simple before-and-after change.
Open sourceS75 Environment Canada: root mean squared error
Published method
What is Root Mean Square Error; displayed formula
Retrieved text for review
Open sourceS76 FAO enterprise and activity budgeting
Published method
Section 4.3.8 Gross margin; section 4.7 Parametric budgeting
Retrieved text for review
Open sourceS77 DCS paddy statistics and revision notice
Context or data source; not automatic formula support
Full method locator not established
Retrieved text for review
Open sourceLOCAL-SRS01 SRS Chapter 01: Introduction
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS02 SRS Chapter 02: Understanding SHARED and How It Works
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS03 SRS Chapter 03: Stakeholders and Responsibilities
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS04 SRS Chapter 04: Overall System Architecture
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS05 SRS Chapter 05: How SHARED Organizes Information
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS06 SRS Chapter 06: Collecting and Importing Data
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS07 SRS Chapter 07: Checking and Approving Data
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS08 SRS Chapter 08: Data Storage and Record History
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS09 SRS Chapter 09: Finding Information and Preparing Reports
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS10 SRS Chapter 10: Maps and Geographic Analysis
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS11 SRS Chapter 11: Dashboards and Information Visualization
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS12 SRS Chapter 12: Decision Support
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS13 SRS Chapter 13: Project Implementation and PMU Monitoring
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS14 SRS Chapter 14: Beneficiary and Community Services
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS15 SRS Chapter 15: Markets Value Chains and Ecosystem Services
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS16 SRS Chapter 16: User Interfaces and Mobile Applications
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS17 SRS Chapter 17: APIs and External System Connections
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS18 SRS Chapter 18: Non Functional Requirements
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS19 SRS Chapter 19: System Testing and Acceptance
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS20 SRS Chapter 20: Development Deployment and Handover
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-SRS21 SRS Chapter 21: Pending Requirements and Institutional Decisions
Project proposal and context
Original project chapter or catalogue named in the title
Existing local SRS extract
Local project context record; no public URL is expected.
LOCAL-CATALOGUE Existing 41-profile, 164-question catalogue
Project proposal and context
Original project chapter or catalogue named in the title
Local catalogue inspected
Local project context record; no public URL is expected.
LOCAL-INTAKE Existing prototype data-entry and upload schemas
Project proposal and context
Original project chapter or catalogue named in the title
Local catalogue inspected
Local project context record; no public URL is expected.
PROTO SHARED prototype calculation and workflow implementation
Project implementation
DecisionSupportModel.spec/project and named model functions in each entry
Read only prototype inspection
Open sourceSRS SHARED Software Requirements Specification
Project requirement
Sections 5.4, 10, 12 and named requirement IDs in each rule
Version 1.6 author revision; institutional acceptance pending
Open sourceS78 FAO Irrigation Water Management Training Manual 3
Published method
Chapter 4.4 Irrigation water need of rice; steps 1 to 8
Method text checked
Open sourceS79 IPCC 2006 Guidelines Volume 4 Chapter 2
Published method
Sections 2.2.3, 2.3.1 and 2.3.3; soil stock guidance printed page 2.37
Method text checked
Open sourceS80 USDA Forest Service A guide for predicting sheet and rill erosion on forest land
Historical published method
Universal Soil Loss Equation and Applying the USLE; printed page 2
Historical method text checked; current local calibration not established
Open sourceS81 FAO Guidelines for financial economic environmental and social information
Published method
Net Present Value and Internal Rate of Return subsections
Method text checked
Open sourceS82 WMO Standardized Precipitation Index User Guide
Published method
WMO No 1090; SPI calculation and interpretation guidance
Full guide checked; local fit and baseline pending
Open sourceS83 US Department of Justice Herfindahl Hirschman Index
Published definition
Definition of the sum of squared market shares
Definition checked; US legal thresholds do not apply to this project
Open sourceS84 NIST Coefficient of Variation
Published definition
Description of sample CV and ratio scale restriction
Definition checked
Open sourceS86 Turf distance API
Software method
Version 7.2.0 distance; Haversine method
Documentation checked
Open sourceS87 Turf length API
Software method
Version 7.2.0 length; selected units
Documentation checked
Open sourceS88 Turf buffer API
Software method
Version 7.2.0 buffer; radius and steps
Documentation checked
Open sourceS89 Turf intersect API
Software method
Version 7.2.0 intersect; polygon intersection
Documentation checked
Open sourceS90 Turf point in polygon API
Software method
Version 7.2.0 booleanPointInPolygon; boundary option
Documentation checked
Open sourceS91 UN Handbook of Surveys on Households and Individuals
Published guidance
Chapter 9 section 9.4.2, equation 9-16, printed page 9-19 (PDF page 427); Chapter 8 weighting; Final Draft
Weighting guidance checked; draft status retained
Open sourceS92 World Bank Impact Evaluation in Practice Second Edition
Published method
Chapter 7 Difference in Differences
Method text checked
Open sourceNF-SOURCE-01 Original context source linked by NF001
Source content checked; linked methods need separate review
Statistical Abstract 2025, Chapter 5: agriculture tables and methodology links
Content checked
This is a source catalogue for agricultural observations and definitions. The linked shares, intensity and forecast-error rules remain project method definitions until their exact input and estimator choices are approved.
Open sourceNF-SOURCE-02 Original context source linked by NF014
Source content checked; linked methods need separate review
SEPC Downloads: Cost of Cultivation and Crop Enterprise Budget
Content checked
The page supplies relevant budget and cultivation publications. It does not by itself verify every linked cost, delay or post-harvest-loss formula. The selected publication and cost scope still require confirmation.
Open sourceNF-SOURCE-03 Original context source linked by NF023
Source content checked; linked methods need separate review
FAO RUSLE toolbox: equation A = R K L S C P and factor definitions
Content checked
The page explicitly supports the RUSLE factor equation for sheet and rill erosion. Scenario subtraction and class-area summaries are separate project operations. Units, factors and local calibration remain pending E01/E02.
Open sourceNF-SOURCE-04 FAO Guidelines for land-use planning: official general guidance
Official FAO planning guidance; proposed alternative for expert review
FAO Development Series 1, 1993; Chapter 3, planning steps, especially Steps 1, 5 and 6; Chapter 4, methods and sources
Official alternative checked
The FAO guide supplies general planning guidance. It is not a confirmed replacement for the Sri Lankan divisional manual. Local limits, source maps, planning rules and the linked area/change calculations remain subject to C04/E01/E02 approval. The LUPPD report provides separate institutional context.
Open sourceNF-SOURCE-05 Original context source linked by NF034
Source content checked; linked methods need separate review
UNCCD Good Practice Guidance Version 2 landing page: land cover, productivity and soil organic carbon
Content checked
The guidance landing page is available. Use the already cited IPCC source S79 for the soil-stock equation; sampling, units and local application remain expert decisions.
Open sourceNF-SOURCE-06 Original context source linked by NF049
Source content checked; linked methods need separate review
FAO indicator 6.4.2: freshwater withdrawal relative to renewable resources after environmental water requirements
Content checked
This source is about water stress. It does not support the linked connection-coverage, utility-loss, leakage-index, groundwater or regulatory-compliance formulas. Those remain separate project proposals needing method-specific evidence.
Open sourceNF-SOURCE-07 Original context source linked by NF059
Source content checked; linked methods need separate review
FAO Forest Resources Assessment document: Land Classifications, Forest Parameters and Changes
Content checked
This is historical terminology and assessment context. It does not verify every linked basal-area, biomass, carbon, survival or alert-review procedure. Current definitions and the appropriate method sources remain required.
Open sourceNF-SOURCE-08 Original context source linked by NF072
Source content checked; linked methods need separate review
GBIF Data quality recommendations: occurrence and sampling-event requirements; sensitive-species handling
Content checked
This source supports record quality and publication requirements. It is not the calculation source for Shannon diversity, STAR, habitat change or response-time metrics.
Open sourceNF-SOURCE-09 Original context source linked by NF085
Source content checked; linked methods need separate review
WMO Climatological Normals: definitions of averages, normals and standard normals
Replacement checked
The original link redirects to this official page. It defines reference periods. SPI uses the separate guide S82; dry-spell thresholds, missing-data policy and local baseline approval remain separate.
Open sourceNF-SOURCE-10 Original context source linked by NF097
Source content checked; linked methods need separate review
Sendai Framework Monitor methodology: Targets and Indicators, including target C direct economic loss relative to GDP
Content checked
The page supports official disaster-indicator definitions. SHARED family coverage, funding gaps, occupancy, response lags and site-overlay rules are separate project measures with their own scope and denominators.
Open sourceNF-SOURCE-11 UNEP SDG 6.3.2 ambient water-quality metadata
Source content checked; linked methods need separate review
UNSD metadata PDF, sections 2.a and 4.c; classification and indicator computation
Replacement checked
The original UN-Water page is access-limited. The custodian metadata is readable. It aggregates assessed water bodies after classification. A parameter-test compliance percentage such as NF107 is not the complete SDG 6.3.2 indicator.
Open sourceNF-SOURCE-12 HARTI Daily Food Commodities Bulletin: checked price publication
Official HARTI price observations; not a universal calculation-method source
Selected bulletin 2026.10.30, PDF page 1: wholesale ranges, published averages and changes by market; explicit Rs/kg and Rs/egg groups
Official alternative checked
The official PDF contains price tables. Read each column date, market and unit; a dash means missing, not zero. This is a selected publication, not a live feed or proof of reuse permission. Medians, volatility, farm-gate spreads and logistics/export measures need additional accepted data and methods under C04/E01.
Open sourceNF-SOURCE-13 Original context source linked by NF135
Source content checked; linked methods need separate review
DCS Household Income and Expenditure Survey publication and report links
Content checked
The page identifies household-survey sources. Use the selected report's poverty line, survey weights and population definition. Outreach, grievance and training measures are project rules, not HIES estimators.
Open sourceNF-SOURCE-14 World Bank Burkina Faso rural development project appraisal, Report 73486-BF
Source content checked; linked methods need separate review
PDF page 107, printed page 97: Formulas for computing economic and financial ratios
Content checked
The historical appraisal gives periodic IRR, NPV, simple payback and sensitivity examples. Its payback formula is not discounted payback. It does not establish SHARED debt-service rules, PES valuations or local financing assumptions.
Open sourceNF-SOURCE-15 Original context source linked by NF158
Source content checked; linked methods need separate review
FP124 Annual Performance Report 2025, Version 1.0: landing page and linked main PDF
Content checked
The report and its PDF are readable. The publisher says the report is under review and may change. It supplies project reporting context, not an approved definition for every linked SHARED workflow ratio.
Open sourceNF-SOURCE-16 Original context source linked by NF173
Source content checked; linked methods need separate review
UNSD SDG metadata repository: introduction and indicator-specific metadata
Content checked
The repository is available and explains metadata governance. It does not prescribe the linked SHARED schema-pass, timeliness, provenance, matching or expired-rights ratios. Those are project control measures requiring client acceptance.
Open sourceDomain method sources
The complete source CSV includes the 133 retained entries and these additional domain source notes.
DD-WATER FAO56 root-zone water balance
Institution publication. Chapter8 equation85 and ETc = Kc ETo. Daily water balance components; local coefficients and operating assumptions still need review.
Open sourceDD-PESTICIDES Sri Lanka Registrar of Pesticides
Government publication. Current registration lists, restrictions and label guidance. Registration and label evidence; no treatment recommendation or automatic permission.
Open sourceDD-CEA CEA ambient water regulations
Government publication. Gazette2148/20, Schedule of use-specific categories. Published ambient water categories and limits; do not substitute them for drinking-water, effluent, air or noise rules.
Open sourceDD-BRIER JMA numerical weather prediction outline
Government publication. AppendixA.3, equationsA.3.1 and A.3.3. Brier score and reference skill for binary probability forecasts; the prototype uses one specified event, not an undifferentiated seasonal score.
Open sourceDD-NRW JICA non-revenue water training materials
Institution publication. Training materials, section1.1, IWA water-balance table. NRW, unbilled authorized use, apparent and real losses are distinct components.
Open sourceDD-ILO ILO controlling occupational risks
Institution publication. Controlling risks; hierarchy of controls. Evidence-led control review; no universal numeric risk score or clearance.
Open sourceDD-GBIF GBIF biological survey publishing guide
Institution publication. Version1.0.2, sections5.4 to5.7 and7.3. Survey event, effort, protocol, sampling scope and non-detection context; not a population estimator.
Open sourceDD-LOCAL SHARED domain decision contracts
Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Open sourcePES-FAO FAO Payments for environmental services what role in sustainable agricultural development
Institution publication. ESA Working Paper 11-20; section 2 printed pages 3–5; sections 3 and 4 on evidence, costs and equity. Conditional agreements, baseline/additionality, monitoring, funding and fairness. Does not set a Sri Lankan scheme, rate, tariff or automatic payment rule.
Open sourceUSLE factor product
Verified published formula · Government publication
1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40
The historical source verifies the factor product. Local factor choice and suitability still need confirmation; this is not a full RUSLE2 implementation.
Enterprise gross margin
Verified published formula · Institution publication
Chapter 4, Gross margin and section 4.7.1
Per-hectare and variable-cost break-even outputs are algebraic rearrangements. Local costs, prices and interpretation still need confirmation.
Discounted cash-flow NPV
Verified published formula · Institution publication
Sections 2.2.2 and 2.2.3, discounting and Net Present Value
The five-year horizon, discount rate and cash assumptions are local settings. Verification does not approve an investment or loan.
Carbon stock-difference component
Verified published component · Institution publication
Intergovernmental Panel on Climate Change · 2006 IPCC Guidelines Volume 4 Chapter 2
Section 2.3.1.1, equation 2.8, stock-difference method
The screen reports the period total. IPCC annualisation requires elapsed years. Pools, inventory inputs and local application still need confirmation.
Soil-carbon stock with volume correction
Verified published formula · Institution publication
Intergovernmental Panel on Climate Change · Good Practice Guidance for LULUCF
Section 4.3.3.5.4, equation 4.3.3, printed page 4.106, PDF page 18
The screen converts carbon percent to a fraction and uses the published coarse-fragment volume convention. Sampling and bulk-density conventions still need confirmation.
Difference-in-differences arithmetic
Verified published formula · Institution publication
World Bank · Impact Evaluation in Practice Second Edition
Chapter 7, table 7.2, printed page 140, PDF page 170
The formula is verified. Causal interpretation still requires a defensible study design, comparison and assumptions.
Sample coefficient of variation
Verified published formula · Government publication
National Institute of Standards and Technology United States · Dataplot Coefficient of Variation
Description, sample coefficient of variation and ratio-scale restrictions
Use a meaningful zero and positive mean. Local series selection and decision limits still need confirmation.
HHI concentration component
Verified published component · Government publication
United States Department of Justice · Herfindahl Hirschman Index
Definition and four-firm worked example
The screen uses fractional shares on a 0–1 scale, equivalent to the published percentage-share score divided by 10000. Local exposure categories and policy thresholds are not verified by this source.
Matched-pair RMSE
Verified published formula · Government publication
Environment and Climate Change Canada · What is Root Mean Square Error
Displayed RMSE equation and definitions of forecast, observation and verification count
Local verification periods, observation quality and forecast applicability still need confirmation.
Binary Brier score and skill component
Verified published component · Government publication
Sections A.3.1 and A.3.2, equations A.3.1 and A.3.3, printed page 239, PDF page 7
The Brier score is checked for binary events. The prototype permits a supplied reference forecast; confirm its independent baseline and comparability before interpreting skill.
Crop evapotranspiration ETc component
Verified published component · Institution publication
Chapter 5, Crop coefficient approach, equation 56
This verifies the ETc component only. Local water-balance allowances, coefficients and operating decisions still need confirmation.
Weighted estimation component
Verified published component · Institution publication
United Nations Statistics Division · Handbook of Surveys on Households and Individuals Final Draft
Chapter 9, paragraphs 38 and 39, printed page 9-9, PDF page 417; Chapter 8 weighting
Local weights, population coverage, design variance and ratio-yield interpretation still need confirmation. Positive illustrative weights do not demonstrate every calibration design.
IWA water-balance components
Verified published component · Institution publication
Asian Development Bank · The Issues and Challenges of Reducing Non-Revenue Water
Figure 4, printed page 15; Annex 1 Water Balance Definitions, printed pages 39–41, PDF pages 47–49
Apparent-loss estimates and the residual real-loss estimate remain local inputs with measurement uncertainty.