Plantation Companies

Tell us what to change or add.

1. Check a decision

Open a decision below. Check the area, period, inputs, result and proposed next step.

2. Try the inputs

Use Example input to change a sample. Use Source input to check the fields and source details. The land-use change decision has its own comparison views.

Record your corrections below, then download your answers or print them.

3. Check each decision

1. Target estate crop and seasonal cost driversDEC-DP34-001 · Production economics · Suggested priority: High
Try this decision

Target estate crop and seasonal cost drivers.

Validation required

Cost per matching unit — fictional 2025 examples

Method. Sum non-overlapping costs, then divide by the matching verified quantity for the same currency and accounting period.

Next step. Review evidence. Investigate cost drivers, compare suppliers/practices, or revise the budget proposal.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Labour cost [LKR]; Material/input cost [LKR]; Other non-overlapping cost [LKR]; Verified output or service quantity [kg]

Other required evidence. Crop; saleable output; labour; inputs; energy; hectares; accounting period.

Fictional worked example · 2025

Laggala Pallegama — production economics · Laggala Pallegama

Input or resultValueUnit
Labour cost180,000LKR
Material/input cost255,000LKR
Other non-overlapping cost62,000LKR
Verified output or service quantity4,500kg
Cost per matching unit110.444LKR/kg
Total cost497,000LKR

An absent or zero denominator has no unit-cost result. Keep fixed, variable and opportunity costs identifiable.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Actual comparable unit cost and service/output quality.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
2. Compare soil and water-management practice outcomesDEC-DP34-002 · Soil and water · Suggested priority: High
Try this decision

Evaluate soil and water-management practice outcomes.

Verified published formula · Difference-in-differences arithmetic

Difference in changes — fictional 2025 examples

Method. (Treatment after−before) − (comparison after−before), using the same outcome definition and periods.

Next step. Supply study-design evidence. Continue, adapt, expand or stop a programme based on defensible outcome evidence.

Inputs, example and sources

World Bank · Impact Evaluation in Practice Second Edition
Institution publication · Chapter 7, table 7.2, printed page 140, PDF page 170

The formula is verified. Causal interpretation still requires a defensible study design, comparison and assumptions.

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Treatment Measured runoff before [mm/season]; Treatment Measured runoff after [mm/season]; Comparison Measured runoff before [mm/season]; Comparison Measured runoff after [mm/season]; Study design and comparability evidence; Outcome definition, method and reference basis

Other required evidence. Practice; baseline condition; follow-up; comparison blocks; rainfall; uncertainty.

Fictional worked example · 2025

Laggala Pallegama — soil and water · Laggala Pallegama

Input or resultValueUnit
Treatment Measured runoff before42mm/season
Treatment Measured runoff after59mm/season
Comparison Measured runoff before39mm/season
Comparison Measured runoff after46mm/season
Study design and comparability evidenceMissing
Outcome definition, method and reference basisMeasured runoff /example matching definition1
Difference in changes10mm/season

The arithmetic alone does not establish causation. Design, parallel trends, confounding, attrition, uncertainty and adverse effects need appropriate evidence.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Verified outcomes, costs, distributional effects and evidence strength.

  • World Bank Impact Evaluation in Practice Second Edition — Institution publication. Chapter7 difference-in-differences. Published difference-in-differences estimator and study assumptions; aggregate examples do not establish causation.
  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
3. Choose what to handle first: blocks for replanting or rehabilitationDEC-DP34-003 · Replanting areas · Suggested priority: High
Try this decision

Prioritize blocks for replanting or rehabilitation.

Validation required

Budget remaining after option — fictional 2025 examples

Method. Budget minus option cost. Compare benefits, adverse effects and mandatory constraints separately; no weighted score or automatic best option.

Next step. Compare feasible trade-offs. Choose a feasible alternative with rationale and conditions, commission evidence, or defer.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Option cost [LKR]; Available budget [LKR]; Mandatory constraints; Expected benefit and its evidence; Resource needs and adverse effects

Other required evidence. Block age; yield; plant condition; area; replant cost; income gap.

Fictional worked example · 2025

Replanting scenario · Laggala Pallegama

Input or resultValueUnit
Option cost1,500,000LKR
Available budget1,800,000LKR
Mandatory constraintsMet
Expected benefit and its evidencePrioritize blocks for replanting or rehabilitation; Block age and yield evidence needed
Resource needs and adverse effectsSample water, labour, access and safeguard trade-offs
Budget remaining after option300,000LKR

Affordability does not prove feasibility or scientific suitability. A missing mandatory condition keeps an option unresolved.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Verified benefits, costs and adverse effects versus the agreed baseline.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
4. Address gaps in verified worker-support coverageDEC-DP34-004 · Worker services · Suggested priority: High
Try this decision

Address gaps in verified worker-support coverage.

Validation required

Verified coverage — fictional 2025 examples

Method. 100 × distinct covered eligible units / eligible frame. Known uncovered = frame − covered − unknown.

Next step. Review evidence. Select eligible underserved units for outreach, investigate missing coverage, or revise the verified frame.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Required eligible frame [workers]; Distinct members of that frame covered [workers]; Frame members with unknown coverage [workers]

Other required evidence. Eligible workers; consented needs; services received; estate; period.

Fictional worked example · 2025

Laggala Pallegama — worker services · Laggala Pallegama

Input or resultValueUnit
Required eligible frame100workers
Distinct members of that frame covered65workers
Frame members with unknown coverage5workers
Verified coverage65%
Known uncovered30workers
Unknown coverage5workers

Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Verified eligible units receiving service and remaining unmet need.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
5. Compare crops and cultivars for estate conditionsDEC-DP34-005 · Crop suitability · Suggested priority: High
Try this decision

Compare crops and cultivars for estate conditions.

Validation required

Evidence gaps — fictional 2025 examples

Method. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.

Next step. Complete the evidence. Shortlist technically feasible alternatives, reject exclusions, or request site evidence.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Soil; Soil evidence reference; elevation; elevation evidence reference; rainfall; rainfall evidence reference; temperature; temperature evidence reference; shade; shade evidence reference; cultivar requirements; cultivar requirements evidence reference; restrictions; restrictions evidence reference

Other required evidence. Soil; elevation; rainfall; temperature; shade; cultivar requirements; restrictions.

Fictional worked example · 2025

Laggala Pallegama — crop suitability · Laggala Pallegama

Input or resultValueUnit
SoilMissing
Soil evidence reference
elevationDocumented
elevation evidence referenceSample Laggala Pallegama field register / 2025
rainfallDocumented
rainfall evidence referenceSample Laggala Pallegama field register / 2025
temperatureDocumented
temperature evidence referenceSample Laggala Pallegama field register / 2025
shadeDocumented
shade evidence referenceSample Laggala Pallegama field register / 2025
cultivar requirementsDocumented
cultivar requirements evidence referenceSample Laggala Pallegama field register / 2025
restrictionsDocumented
restrictions evidence referenceSample Laggala Pallegama field register / 2025
Evidence gaps1items

Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Field-verified limiting factors and observed performance.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
6. Target maintenance to weak new-planting cohortsDEC-DP34-006 · Planting survival · Suggested priority: High
Try this decision

Target maintenance to weak new-planting cohorts.

Validation required

Confirmed survival lower bound — fictional 2025 examples

Method. Lower =100 × known survivors / original cohort. Upper =100 × (known survivors + unknown) / original cohort. Survivors + known failures + unknown = original cohort; replacements do not enter it.

Next step. Review evidence. Replace failed establishment, alter maintenance, or investigate site/treatment causes.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Original cohort [plants]; Known surviving original members [plants]; Known failed original members [plants]; Original members with unknown follow-up [plants]; Replacements in a separate cohort [plants]

Other required evidence. Cohort; planted plants; survivors; replacements; follow-up date; block.

Fictional worked example · 2025

Laggala Pallegama — planting survival · Laggala Pallegama

Input or resultValueUnit
Original cohort450plants
Known surviving original members351plants
Known failed original members70plants
Original members with unknown follow-up29plants
Replacements in a separate cohort18plants
Confirmed survival lower bound78%
Survival upper bound84.444%
Unknown follow-up29plants

These bounds account for unknown status; they are not statistical confidence intervals. Use actual follow-up dates and distinguish cohort membership from repeated visits.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Survival of the original cohort, replacements and condition separately.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
7. Choose what to handle first: conservation treatment in vulnerable estate blocksDEC-DP34-007 · Erosion control · Suggested priority: High
Try this decision

Prioritize conservation treatment in vulnerable estate blocks.

Verified published formula · USLE factor product

Estimated annual sheet/rill loss — fictional 2025 examples

Method. R × K × LS × C × P, using a mutually consistent SI factor set.

Next step. Review evidence. Compare feasible treatments, select sites for expert appraisal, or commission missing measurements.

Inputs, example and sources

United States Department of Agriculture Forest Service · A Guide for Predicting Sheet and Rill Erosion on Forest Land
Government publication · 1980 technical publication SA-TP 11; Universal Soil Loss Equation, printed page 2; metric conversion appendix, printed page 40

The historical source verifies the factor product. Local factor choice and suitability still need confirmation; this is not a full RUSLE2 implementation.

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Rainfall erosivity [MJ mm/(ha h year)]; Soil erodibility [t ha h/(ha MJ mm)]; Slope-length and steepness factor [ratio]; Cover-management factor [fraction]; Support-practice factor [fraction]

Other required evidence. Erosivity; soil erodibility; slope; cover; support practices; block area.

Fictional worked example · 2025

Laggala Pallegama — erosion control · Laggala Pallegama

Input or resultValueUnit
Rainfall erosivity950MJ mm/(ha h year)
Soil erodibility0.035t ha h/(ha MJ mm)
Slope-length and steepness factor2.8ratio
Cover-management factor0.24fraction
Support-practice factor0.7fraction
Estimated annual sheet/rill loss15.641t/ha/year

This USLE factor product is not a full RUSLE2 run, measured loss, delivered sediment, gully loss or landslide forecast. Local factors and uncertainty need review.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Measured soil/land condition and treatment performance, with uncertainty.

Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
8. Plan harvesting around maturity weather and capacityDEC-DP34-008 · Harvest scheduling · Suggested priority: High
Try this decision

Plan harvesting around maturity weather and capacity.

Validation required

Planned duration — fictional 2025 examples

Method. Check start/end order, operating window, effort, predecessor completion and overlapping bookings for the same resource. A conflict is flagged; no optimal schedule is invented.

Next step. Resolve overlapping resource bookings. Assign a feasible timetable, redistribute resources, or escalate the blocked dependency.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Required resource; Task start; Task end; Earliest permitted start; Latest permitted finish; Required resource effort [hours]; Available resource effort [hours]; Predecessor task reference; Mandatory permits and prerequisites

Other required evidence. Block maturity; weather; labour availability; processing capacity; quality requirements.

Fictional worked example · 2025

Laggala Pallegama — harvest scheduling · Laggala Pallegama

Input or resultValueUnit
Required resourceWatershed field team
Task start2025-06-01
Task end2025-06-04
Earliest permitted start2025-05-28
Latest permitted finish2025-06-08
Required resource effort16hours
Available resource effort24hours
Predecessor task referenceNone
Mandatory permits and prerequisitesMet
Planned duration3days
Resource hours remaining8hours

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. On-time completion with verified outputs and resource use.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
9. Refer unusual plantation pest and disease patternsDEC-DP34-009 · Pest management · Suggested priority: High
Try this decision

Refer unusual plantation pest and disease patterns.

Validation required

Difference — fictional 2025 examples

Method. Later/comparison value minus Comparable reference value. Relative change = 100 × difference / Comparable reference value when the earlier value is positive.

Next step. Review evidence. Verify the observation, refer a confirmed exception, or retain it with explanation.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Comparable reference value [affected plants per 100 inspected]; Later/comparison value [affected plants per 100 inspected]

Other required evidence. Crop; symptoms; diagnostic result; incidence; survey effort; historical baseline.

Fictional worked example · 2025

Laggala Pallegama — pest management · Laggala Pallegama

Input or resultValueUnit
Comparable reference value100affected plants per 100 inspected
Later/comparison value90affected plants per 100 inspected
Difference-10affected plants per 100 inspected
Relative change-10%

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Validated exceptions, response time and resulting outcome.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
10. Check poor conversion of harvest to saleable productDEC-DP34-010 · Processing efficiency · Suggested priority: High
Try this decision

Investigate poor conversion of harvest to saleable product.

Validation required

Saleable mass conversion — fictional 2025 examples

Method. 100 × saleable output / matching input mass. Keep by-products, transfers, moisture change and losses separately identified.

Next step. Review evidence. Investigate low productivity, compare practices, or improve the input/output measurements.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Input mass on matching moisture basis [kg]; Saleable output on matching basis [kg]; Usable by-products [kg]

Other required evidence. Fresh input; saleable output; moisture; by-products; process losses; period.

Fictional worked example · 2025

Laggala Pallegama — processing efficiency · Laggala Pallegama

Input or resultValueUnit
Input mass on matching moisture basis1,200kg
Saleable output on matching basis970kg
Usable by-products85kg
Saleable mass conversion80.833%

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Output per relevant input alongside quality and resource impacts.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
11. Target resource-efficiency improvements in estate operationsDEC-DP34-011 · Energy and water · Suggested priority: Medium
Try this decision

Target resource-efficiency improvements in estate operations.

Validation required

Energy per product — fictional 2025 examples

Method. Energy/output; water/output; and 100 × output/material input. Separate denominators and units; do not sum these efficiencies.

Next step. Review evidence. Investigate low productivity, compare practices, or improve the input/output measurements.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Saleable product [kg]; Electric energy [kWh]; Process water [m³]; Raw material input [kg]

Other required evidence. Product output; energy kWh; water cubic metres; process stage; period.

Fictional worked example · 2025

Laggala Pallegama — energy and water · Laggala Pallegama

Input or resultValueUnit
Saleable product4,500kg
Electric energy3,400kWh
Process water80m³
Raw material input5,300kg
Energy per product0.756kWh/kg
Water per product0.018m³/kg
Saleable mass conversion84.906%

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Output per relevant input alongside quality and resource impacts.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
12. Check product lots failing applicable specificationsDEC-DP34-012 · Product quality · Suggested priority: High
Try this decision

Investigate product lots failing applicable specifications.

Validation required

Measured value — fictional 2025 examples

Method. Compare the measured value only with matching parameter, unit, use and averaging period. Retain limit source/version and censored-result status.

Next step. Outside example comparison bounds. Refer a confirmed nonconformance for authorized response, resample, or investigate the method.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Parameter and applicable use; Measured result [%]; Example lower comparison bound [%]; Example upper comparison bound [%]; Original and limit unit; Sampling and analytical method/version; Limit source, version and use; Parameter, unit, use and averaging period match; Result is below a reporting/detection limit; Averaging interval, sampling depth or process basis

Other required evidence. Lot; quality parameter; test method; result; buyer specification; traceability.

Fictional worked example · 2025

Laggala Pallegama — product quality · Laggala Pallegama

Input or resultValueUnit
Parameter and applicable useLot moisture under buyer specification
Measured result13%
Example lower comparison bound0%
Example upper comparison bound12%
Original and limit unit%
Sampling and analytical method/versionSample laboratory method
Limit source, version and useFictional comparison bounds; not a regulatory limit
Parameter, unit, use and averaging period matchYes
Result is below a reporting/detection limitNo
Averaging interval, sampling depth or process basisSample stated sampling/averaging basis
Measured value13%

Example bounds establish no compliance or diagnosis. Ambient, drinking-water, effluent, crop, food, air and noise standards are not interchangeable. A censored result is not an exact zero.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Follow-up compliance, exposure/service condition and corrective closure.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
13. Compare estate adaptation investmentsDEC-DP34-013 · Climate resilience · Suggested priority: High
Try this decision

Compare estate adaptation investments.

Verified published formula · Discounted cash-flow NPV

Five-year net present value — fictional 2025 examples

Method. NPV = −initial investment + sum of year1…5 net cash flows discounted at the stated annual rate, including residual value once in year5.

Next step. Review evidence. Compare feasible investments, adjust the scope, or defer pending finance/evidence.

Inputs, example and sources

Food and Agriculture Organization of the United Nations · Guidelines for defining financial economic environmental and social information
Institution publication · Sections 2.2.2 and 2.2.3, discounting and Net Present Value

The five-year horizon, discount rate and cash assumptions are local settings. Verification does not approve an investment or loan.

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Initial investment [LKR]; Net cash flow year1 [LKR]; Net cash flow year2 [LKR]; Net cash flow year3 [LKR]; Net cash flow year4 [LKR]; Net cash flow year5 [LKR]; Residual value at end of year5 [LKR]; Example discount rate [%]

Other required evidence. Exposure; water availability; crop risks; options; costs; expected benefits.

Fictional worked example · 2025

Laggala Pallegama — climate resilience · Laggala Pallegama

Input or resultValueUnit
Initial investment2,400,000LKR
Net cash flow year1400,000LKR
Net cash flow year2550,000LKR
Net cash flow year3680,000LKR
Net cash flow year4720,000LKR
Net cash flow year5760,000LKR
Residual value at end of year5120,000LKR
Example discount rate8%
Five-year net present value109,847.353LKR

Match currency, price year, real/nominal basis and cash-flow timing. The example rate and five-year horizon are assumptions, not institutional financing terms; no credit approval follows.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Realized cash flows, benefits and costs versus the approved appraisal.

Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
14. Choose what to handle first: documented occupational hazards for competent reviewDEC-DP34-014 · Worker safety · Suggested priority: High
Try this decision

Prioritize documented occupational hazards for competent review.

Validation required

Evidence gaps — fictional 2025 examples

Method. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.

Next step. Complete the evidence. Select a feasible control, escalate beyond authority, or seek technical inspection.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Task hazards; Task hazards evidence reference; exposure; exposure evidence reference; incident evidence; incident evidence evidence reference; controls; controls evidence reference; inspections; inspections evidence reference; requirements; requirements evidence reference; Documented unresolved critical condition; Evidence observation date; Existing control and its evidence; Competent recipient

Other required evidence. Task hazards; exposure; incident evidence; controls; inspections; requirements.

Fictional worked example · 2025

Laggala Pallegama — worker safety · Laggala Pallegama

Input or resultValueUnit
Task hazardsMissing
Task hazards evidence reference
exposureDocumented
exposure evidence referenceSample Laggala Pallegama field register / 2025
incident evidenceDocumented
incident evidence evidence referenceSample Laggala Pallegama field register / 2025
controlsDocumented
controls evidence referenceSample Laggala Pallegama field register / 2025
inspectionsDocumented
inspections evidence referenceSample Laggala Pallegama field register / 2025
requirementsDocumented
requirements evidence referenceSample Laggala Pallegama field register / 2025
Documented unresolved critical conditionUnknown
Evidence observation date2025-06-30
Existing control and its evidenceSample documented control
Competent recipientResponsible specialist / duty authority
Evidence gaps1items

Show the hazard, exposure and verified controls separately. No generic score, probability, diagnosis, site clearance or official warning is derived from a count.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Verified control effectiveness and residual risk with evidence.

  • ILO controlling occupational risks — Institution publication. Controlling risks; hierarchy of controls. Evidence-led control review; no universal numeric risk score or clearance.
  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
15. Find estate communities with service deficitsDEC-DP34-015 · Water and housing · Suggested priority: High
Try this decision

Identify estate communities with service deficits.

Validation required

Verified coverage — fictional 2025 examples

Method. 100 × distinct covered eligible units / eligible frame. Known uncovered = frame − covered − unknown.

Next step. Review evidence. Select eligible underserved units for outreach, investigate missing coverage, or revise the verified frame.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Required eligible frame [workers]; Distinct members of that frame covered [workers]; Frame members with unknown coverage [workers]

Other required evidence. Household frame; safe water; sanitation; housing condition; verified service access.

Fictional worked example · 2025

Laggala Pallegama — water and housing · Laggala Pallegama

Input or resultValueUnit
Required eligible frame100workers
Distinct members of that frame covered65workers
Frame members with unknown coverage5workers
Verified coverage65%
Known uncovered30workers
Unknown coverage5workers

Count each eligible unit once for the selected service and period. Received messages, attendance, adoption and outcomes are separate measures.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Verified eligible units receiving service and remaining unmet need.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
16. Schedule critical estate and factory equipment maintenanceDEC-DP34-016 · Maintenance · Suggested priority: Medium
Try this decision

Schedule critical estate and factory equipment maintenance.

Validation required

Open days past due — fictional 2025 examples

Method. Open age = assessment date − received date. Days past due = max(0, assessment date − recorded due date) for open cases. Show documented critical conditions separately.

Next step. Follow up overdue case. Authorize feasible repair through the proper work process, inspect further, or restrict unsafe use.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Received or defect observed; Recorded due date; Assessment date; Case/work closed; Documented critical unresolved condition; Responsible office or maintainer; Actual closure date when closed

Other required evidence. Asset; condition; failure history; service criticality; parts; repair cost.

Fictional worked example · 2025

Laggala Pallegama — maintenance · Laggala Pallegama

Input or resultValueUnit
Received or defect observed2025-04-01
Recorded due date2025-06-01
Assessment date2025-06-30
Case/work closedNo
Documented critical unresolved conditionUnknown
Responsible office or maintainerProposed responsible office
Actual closure date when closed
Open days past due29days
Calendar age90days

Example due dates are not legal service standards. Do not alter statutory deadlines by silently subtracting pauses, or infer severity from age alone.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Verified defect closure, service availability and repeat failures.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
17. Resolve breaks in estate product provenanceDEC-DP34-017 · Traceability · Suggested priority: High
Try this decision

Resolve breaks in estate product provenance.

Validation required

Broken or affected lineage — fictional 2025 examples

Method. Follow recorded upstream→downstream links within the same scope and period. Flag missing links; a confirmed defect identifies downstream linked candidates for authorized investigation.

Next step. Investigate linked downstream lot. Assign discrepancies to the custodian, accept documented corrections, or retain unresolved versions.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Upstream lot/source reference; Downstream lot/batch reference; Exact upstream source version; Recorded upstream issue

Other required evidence. Block ID; harvest lot; factory lot; shipment; transfer documents; certification.

Fictional worked example · 2025

Laggala Pallegama — traceability · Laggala Pallegama

Input or resultValueUnit
Upstream lot/source referenceEXAMPLE-ROOT
Downstream lot/batch reference2025-BATCH-1
Exact upstream source versionSample version1
Recorded upstream issueConfirmed defect
Broken or affected lineage1items

Recorded lineage is not proof of product identity or recall authority. Preserve multi-source batches, transfers and versions; do not clear unlinked lots as safe.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Discrepancies resolved with evidence and repeat error rate.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
18. Review estate carbon-stock estimates and pool coverageDEC-DP34-018 · Carbon evidence · Suggested priority: Medium
Try this decision

Review estate carbon-stock estimates and pool coverage.

Verified published component · Carbon stock-difference component

Carbon stock change — fictional 2025 examples

Method. (Later carbon density − earlier carbon density) × same inventory area, with identical pools, method and boundaries.

Next step. Review evidence. Select inventory improvements or restoration options for specialist review.

Inputs, example and sources

Intergovernmental Panel on Climate Change · 2006 IPCC Guidelines Volume 4 Chapter 2
Institution publication · Section 2.3.1.1, equation 2.8, stock-difference method

The screen reports the period total. IPCC annualisation requires elapsed years. Pools, inventory inputs and local application still need confirmation.

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Earlier carbon density [t C/ha]; Later carbon density [t C/ha]; Same inventory area [ha]; Included pools and allometry references

Other required evidence. Tree inventory; soil measurements; models; carbon fractions; area; uncertainty.

Fictional worked example · 2025

Laggala Pallegama — carbon evidence · Laggala Pallegama

Input or resultValueUnit
Earlier carbon density100t C/ha
Later carbon density90t C/ha
Same inventory area85ha
Included pools and allometry referencesSample matching biomass pools; source model required
Carbon stock change-850t C
Carbon-density change-10t C/ha

Inventory plots, allometry and uncertainty remain required evidence. Stock change is not an issued carbon credit, additionality test or payable service.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Independently reviewed stock change, uncertainty and reversals.

  • IPCC 2006 Guidelines Volume 4 Chapter 2 — Institution publication. Volume4 chapter2 sections2.2 and2.3.3. Published carbon-stock/change and soil-carbon framework; input conventions and local applicability require review.
  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
19. Resolve concerns around estate development proposalsDEC-DP34-019 · Community consultation · Suggested priority: Medium
Try this decision

Resolve concerns around estate development proposals.

Validation required

Response share — fictional 2025 examples

Method. 100 × distinct respondents / invited people. Record unresolved issues individually; one respondent may raise several issues.

Next step. Resolve participation barriers and issues. Address concerns, revise the proposal, seek required responses, or escalate unresolved conditions.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Distinct relevant people invited [people]; People who responded [people]; Unresolved issues [issues]; Proposal/version being discussed; Required participation channels accessible

Other required evidence. Proposal; affected communities; consultation; objections; commitments; conditions.

Fictional worked example · 2025

Laggala Pallegama — community consultation · Laggala Pallegama

Input or resultValueUnit
Distinct relevant people invited95people
People who responded68people
Unresolved issues16issues
Proposal/version being discussedSample proposal1
Required participation channels accessibleUnknown
Response share71.579%
Unresolved issues16issues

Response, attendance and silence are not consent. Participation does not transfer decision authority or settle rights.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Resolved concerns, participation and compliance with recorded commitments.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision
20. Compare and correct differences in inconsistent block crop and land-use recordsDEC-DP34-020 · Estate classifications · Suggested priority: Lower
Try this decision

Reconcile inconsistent block crop and land-use records.

Validation required

Evidence gaps — fictional 2025 examples

Method. Check each required item and retain its reference. A documented item is not a scientific, legal or institutional approval.

Next step. Complete the evidence. Approve a documented mapping, keep it Draft, or create a governed concept after review.

Inputs, example and sources

Keep the same place, observation period, definitions, units and source versions.

Analysis inputs. Block ID; Block ID evidence reference; crop labels; crop labels evidence reference; planted area; planted area evidence reference; source edition; source edition evidence reference; definitions; definitions evidence reference; steward; steward evidence reference

Other required evidence. Block ID; crop labels; planted area; source edition; definitions; steward.

Fictional worked example · 2025

Laggala Pallegama — estate classifications · Laggala Pallegama

Input or resultValueUnit
Block IDMissing
Block ID evidence reference
crop labelsDocumented
crop labels evidence referenceSample Laggala Pallegama field register / 2025
planted areaDocumented
planted area evidence referenceSample Laggala Pallegama field register / 2025
source editionDocumented
source edition evidence referenceSample Laggala Pallegama field register / 2025
definitionsDocumented
definitions evidence referenceSample Laggala Pallegama field register / 2025
stewardDocumented
steward evidence referenceSample Laggala Pallegama field register / 2025
Evidence gaps1items

Evidence completeness alone cannot establish suitability, eligibility, safety, permission or method validity.

Proposed checking role. Estate agronomist, operations lead and environmental/social reviewer.

After the action. Unmapped/conflicting concepts and history preserved across revisions.

  • SHARED domain decision contracts — Validation required. Domain decision rules and matching fictional examples. Local comparisons, constraints, source matching, sorting and follow-up proposals; developer checks do not establish scientific or client approval.
Institution and data context
  • GCF FP124 project and documents — Institution publication. Full method locator not established. Institutional context; does not establish the calculation or local approval.
  • Tea Research Institute agronomy — Institution publication. Agronomy division: research and development activities and key research areas. Institutional context; does not establish the calculation or local approval.
  • TRI climate adaptation guideline 2019 — Institution publication. TRI Guideline 01/2019, pages 1-2: impacts and adaptation strategies. Institutional context; does not establish the calculation or local approval.

Confirm local scope, data rights, parameters and responsible roles in this Institution review. Published components retain their source; they do not approve the local application.

Your checks for this decision

4. Existing data forms for your institution

Check which existing source fields can supply the decision inputs.

Forest area by type, 2018–2023 · Forest Resources

Existing form reference: 5d4e57af1e6712f1

FieldUnitRequired
ClassificationConfirm if neededNo
Forest typeConfirm if neededNo
YearConfirm if neededNo
AreaConfirm if neededNo
Export earnings by sector, 2015–2026 · Markets & Value Chains

Existing form reference: b3d77003d1866be4

FieldUnitRequired
SectorConfirm if neededNo
YearConfirm if neededNo
Export earningsUSD millionNo
Reporting basisConfirm if neededNo
Export contribution by sector, 2015–2026 · Markets & Value Chains

Existing form reference: 1084af35eff25970

FieldUnitRequired
SectorConfirm if neededNo
YearConfirm if neededNo
Export contribution%No
Reporting basisConfirm if neededNo
Major export markets, 2025 · Markets & Value Chains

Existing form reference: d897e621e1f5fb87

FieldUnitRequired
SectorConfirm if neededNo
MarketConfirm if neededNo
YearConfirm if neededNo
Export earningsUSD millionNo
Tea production cost per kilogram, 2018–2024 · Markets & Value Chains

Existing form reference: da0b466d0b1b89c9

FieldUnitRequired
Cost itemConfirm if neededNo
PeriodConfirm if neededNo
CostLKR/kgNo

5. Documents and images

Your institution has its own document and image library. Use the same library for reports, photos and other evidence.

Plantation Companies Documents and images prototype screen
Plantation Companies. Prototype screen. Select the image to enlarge it.

What you can try

  1. Open Documents and images. Check the institution name.
  2. Use All files, Documents or Images to find a file. Open its preview or download the original.
  3. Use a sample file to try Add file. Private is the starting choice. Public needs a source, permission to share and review.
  4. Use Access preview to try the institution reviewer and Public visitor views.

Files added in the prototype stay in this browser. Public sharing is an access preview. Existing public reference links already work online.

What your institution needs to confirm

6. Data structure management

Data structure keeps the existing source tree, records, charts and map. Manage structure adds a place to propose changes to definitions.

Plantation Companies Data structure management prototype screen
Plantation Companies. Prototype screen. Select the image to enlarge it.

What you can try

  1. Open Data structure and choose Manage structure.
  2. Use Add base domain for a main information area. Add inside creates a subject area, a nested subject, an entity type or a field under the right parent.
  3. Give the definition a clear name, code and meaning. Reuse an existing definition when the meaning is the same.
  4. For a field, check the data type, unit, required value, limits and missing-value rule. Save a Draft, then try the separate reviewer view.

An entity type means a kind of thing or event, such as a reservoir or an inspection. Drafts stay in this browser. A demo approval does not change real definitions, data, chart links or sharing rights.

What your institution needs to confirm

7. Users and access

User management shows example profiles for each institution. People and Roles and access let you review the proposed account screens.

Plantation Companies Users and access prototype screen
Plantation Companies. Prototype screen. Select the image to enlarge it.

What you can try

  1. Open User management and choose the institution. The rows are examples, not a list of your staff.
  2. Use View access to check a role. An administrator title alone does not give access to Private files.
  3. Try Preview invitation or Preview access change. Check the role, start date, optional end date and reason.
  4. Review the example permissions and tell us which job roles should receive each one.

These are interface previews only. They create no account, send no email and change no access. Use example details in the preview. Institution verification does not grant a real permission.

What your institution needs to confirm

8. Can you share data regularly?

We currently use public data and published reports where available. Please confirm whether your institution can provide data directly, so we can avoid retyping or reading figures from PDFs.

Do not enter passwords, access keys or private account details.

9. Anything else we should change?

Use the Download answers button at the top of this page. Share the downloaded file or printed copy through your agreed review channel. Nothing is sent automatically.